[
  {
    "id": "aligned-iad04-frederick",
    "record_type": "data_center",
    "technology_tags": [
      "Hyperscale computing",
      "High-density racks",
      "Air cooling",
      "Liquid cooling",
      "Diesel backup generation"
    ],
    "name": "Aligned Data Centers IAD04",
    "operator": "Aligned Data Centers (MD) Propco, LLC",
    "owner": "Aligned Data Centers (MD) Propco, LLC",
    "campus": "Quantum Frederick",
    "status": "permitted / under development",
    "year_built": null,
    "year_built_status": "not built",
    "year_built_basis": "The intersecting official parcel record does not list a completed structure; the facility remains under development.",
    "development_status": "permitted / under development",
    "permit_status": "site plan approved; air permit to construct issued",
    "air_permit_status": "approved / issued January 2025",
    "legal_status": "no project-specific lawsuit or administrative appeal identified in the reviewed primary records",
    "status_tags": [
      "Not built",
      "Under development",
      "Site plan approved",
      "Air permit approved"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "mde-aligned-issued-air-permit-2025",
      "frederick-planning-sp275110-2023"
    ],
    "plan_detail": "One separately permitted data-center facility on a 74.89-acre parcel within Quantum Frederick.",
    "permit_detail": "MDE issued the air permit to construct in January 2025; county site plan SP275110 is approved.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "5601 Manor Woods Road",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21703",
    "latitude": 39.339233,
    "longitude": -77.45587,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": null,
    "site_acres": 74.89,
    "utility": "Potomac Edison",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified in reviewed air-permit records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "ultra-low sulfur diesel",
    "backup_generator_count": 172,
    "backup_generator_capacity_mw": 508,
    "backup_generator_detail": "168 generators at 3 MW and 4 generators at 1 MW",
    "ups_technology": "Aligned markets 2 MW UPS line-ups for IAD-04; detailed topology and energy duration are not disclosed.",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": "The permit application says Aligned data centers are designed to use no water; facility-specific operating consumption is not yet public.",
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "documented opposition",
    "public_sentiment_score": -1,
    "public_sentiment_label": "opposed",
    "sentiment_basis": "The MDE final determination records adverse public comments on emissions, noise, water, cumulative impacts, and community health; the record does not provide a representative poll.",
    "sentiment_source_ids": [
      "mde-aligned-final-determination-2025"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "medium",
    "hardware_detail": "Planned hyperscale shells for high-density rack deployments. Aligned's Frederick County page identifies IAD-04 at 5601 Manor Woods Road on a 75-acre campus designed to Tier III standards, with 3 MW backup generators, 2 MW UPS line-ups, N+1 block redundancy, 500 kVA PDUs, 415V distribution, Delta3 air cooling, and DeltaFlow liquid-cooling taps. Maryland permit records remain the source for the full backup-generator fleet.",
    "likely_workflows_detail": "Likely AI and HPC clusters plus general hyperscale cloud and enterprise workloads, based on Aligned's published Maryland campus positioning rather than a tenant roster for IAD04 itself.",
    "hardware_workflow_basis": "Hardware description combines the site permit with Aligned's published cooling platform. Workload statement is an operator-capability inference, not a building-specific customer disclosure.",
    "profile_source_ids": [
      "aligned-maryland-data-centers",
      "mde-aligned-issued-air-permit-2025",
      "mde-aligned-air-permit-application",
      "mde-frederick-data-center-hub"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "aligned-maryland-data-centers",
      "frederick-oed-data-centers-2026",
      "mde-aligned-issued-air-permit-2025",
      "mde-aligned-final-determination-2025",
      "mde-aligned-air-permit-application",
      "frederick-planning-sp275110-2023",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS technology and rating",
      "current and committed site employment",
      "facility capital investment",
      "facility-specific tax benefits"
    ],
    "notes": "Emergency-generator nameplate capacity is backup capacity, not normal facility load or annual energy use.",
    "power_scale_class": "very-large",
    "power_scale_label": "Very large",
    "power_scale_mw": 300.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated normal grid draw from a 508 MW permitted emergency-generator plant for a single hyperscale facility. The estimate treats backup nameplate as a resilience envelope and applies a conservative hyperscale load proxy; it is not a metered demand value.",
    "power_scale_tag": "Estimated draw: 100 MW or more",
    "power_scale_source_ids": [
      "mde-aligned-air-permit-application",
      "mde-aligned-issued-air-permit-2025"
    ],
    "contestation_score": 3,
    "contestation_label": "high",
    "contestation_category": "public and regulatory",
    "contestation_basis": "IAD04 drew adverse permit comments and a split 4-3 planning approval. It is also part of the Quantum Frederick campus at the center of a 21,000-signature referendum campaign, litigation, and a subsequent county development pause; the referendum dispute was campus-wide, not an action against IAD04 alone.",
    "contestation_source_ids": [
      "mde-aligned-final-determination-2025",
      "dcd-aligned-planning-approval-2023",
      "wypr-frederick-referendum-ruling-2026"
    ],
    "salient_news_source_ids": [
      "wypr-frederick-referendum-ruling-2026",
      "dcd-aligned-planning-approval-2023"
    ],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 300.0,
    "estimated_power_draw_basis": "Estimated normal grid draw from a 508 MW permitted emergency-generator plant for a single hyperscale facility. The estimate treats backup nameplate as a resilience envelope and applies a conservative hyperscale load proxy; it is not a metered demand value.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "mde-aligned-air-permit-application",
      "mde-aligned-issued-air-permit-2025"
    ],
    "projected_power_demand_mw": 300.0,
    "projected_power_demand_basis": "Estimated normal grid draw from a 508 MW permitted emergency-generator plant for a single hyperscale facility. The estimate treats backup nameplate as a resilience envelope and applies a conservative hyperscale load proxy; it is not a metered demand value.",
    "projected_power_demand_confidence": "medium",
    "projected_power_demand_source_ids": [
      "mde-aligned-air-permit-application",
      "mde-aligned-issued-air-permit-2025"
    ],
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $396,334,080 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 2635200.0,
    "estimated_annual_electricity_cost_usd": 396334080,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 300.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 396334080,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 300.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "mde-aligned-air-permit-application",
          "mde-aligned-issued-air-permit-2025"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "mde-aligned-air-permit-application",
      "mde-aligned-issued-air-permit-2025"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "amazon-bwi150-153-frederick",
    "record_type": "data_center",
    "technology_tags": [
      "Hyperscale computing",
      "Water-cooled HVAC",
      "Diesel backup generation"
    ],
    "name": "Amazon Data Services BWI-150 through BWI-153",
    "operator": "Amazon Data Services, Inc.",
    "owner": "Rowan Digital (land parcels); Amazon Data Services is the permit applicant/operator",
    "campus": "Quantum Frederick",
    "status": "air permit issued / under development",
    "year_built": 2025,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 2025 for the 781,360-square-foot structure at 3250A Digital Drive; the campus remains under development and this date is not treated as proof of operation.",
    "development_status": "under development / not operating",
    "permit_status": "air permit to construct issued after public review",
    "air_permit_status": "approved / issued March 25, 2026",
    "legal_status": "no project-specific lawsuit or administrative appeal identified in the reviewed primary records",
    "status_tags": [
      "Built 2025",
      "Under development",
      "Not operating",
      "Air permit approved"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "mde-amazon-issued-air-permit-2026",
      "mde-amazon-final-determination-2026"
    ],
    "plan_detail": "Amazon Data Services BWI-150 through BWI-153 corresponds to Rowan's Bauxite I development phase within Quantum Frederick, documented in MDE air-permit records as a four-building data-center campus at 3250 Digital Drive.",
    "permit_detail": "MDE issued the air permit to construct on March 25, 2026 after public review.",
    "financing_detail": "No facility-specific public award was identified. Eligibility for Maryland's general data-center sales-tax program is not evidence of an award.",
    "street_address": "3250 Digital Drive",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21703",
    "latitude": 39.323946,
    "longitude": -77.485582,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 4,
    "site_acres": null,
    "utility": "Potomac Edison",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified in reviewed air-permit records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": 99,
    "backup_generator_capacity_mw": 257.75,
    "backup_generator_detail": "92 generators at 2.75 MW, 6 at 0.75 MW, and 1 at 0.25 MW",
    "ups_technology": null,
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": "The permit identifies a building that treats incoming cooling water; withdrawal and consumption quantities were not found.",
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "strong documented opposition",
    "public_sentiment_score": -2,
    "public_sentiment_label": "strongly opposed",
    "sentiment_basis": "MDE's response-to-comments record contains extensive organized objections concerning cumulative air pollution, noise, water, grid and residential-rate effects. This is a record-based assessment, not a population poll.",
    "sentiment_source_ids": [
      "mde-amazon-final-determination-2026"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "high",
    "hardware_detail": "Four-building hyperscale campus with extensive diesel backup generation and support systems for large-scale compute, storage, and networking. Public records reviewed for Frederick do not disclose server generations, accelerator counts, or rack densities.",
    "likely_workflows_detail": "Likely AWS cloud infrastructure for elastic compute, storage, databases, internal platform services, and potentially AI capacity. That is inferred from the operator identity and hyperscale campus pattern rather than a Frederick-specific workload disclosure.",
    "hardware_workflow_basis": "Permit and application records establish campus scale and backup plant. Workflow description is a conservative AWS operator inference informed by Amazon's public global-infrastructure model.",
    "profile_source_ids": [
      "aws-global-infrastructure",
      "mde-amazon-issued-air-permit-2026",
      "mde-amazon-air-permit-application",
      "mde-frederick-data-center-hub",
      "frederick-oed-data-centers-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "mde-amazon-issued-air-permit-2026",
      "mde-amazon-final-determination-2026",
      "mde-amazon-air-permit-application",
      "mde-frederick-data-center-hub",
      "frederick-oed-data-centers-2026",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS technology and rating",
      "current and committed site employment",
      "facility capital investment",
      "facility-specific tax benefits",
      "cooling-water withdrawal and consumption"
    ],
    "notes": "Emergency-generator nameplate capacity is not normal data-center load.",
    "power_scale_class": "very-large",
    "power_scale_label": "Very large",
    "power_scale_mw": 160.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated normal grid draw from the 257.75 MW permitted backup-generator fleet across four Amazon buildings. Backup nameplate is used only as an order-of-magnitude proxy, not as actual demand.",
    "power_scale_tag": "Estimated draw: 100 MW or more",
    "power_scale_source_ids": [
      "mde-amazon-air-permit-application",
      "mde-amazon-issued-air-permit-2026"
    ],
    "contestation_score": 4,
    "contestation_label": "very high",
    "contestation_category": "public, permitting, and legal",
    "contestation_basis": "Amazon's Bauxite I permit for 99 diesel backup generators was highly contested, and the project lies within the Quantum Frederick campus that prompted a 21,000-signature referendum campaign, court proceedings, and a county pause. The referendum concerned the wider data-center zone, not only Amazon.",
    "contestation_source_ids": [
      "mde-amazon-final-determination-2026",
      "fnp-amazon-99-generators-2026",
      "wypr-frederick-referendum-ruling-2026"
    ],
    "salient_news_source_ids": [
      "fnp-amazon-99-generators-2026",
      "wypr-frederick-referendum-ruling-2026"
    ],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 160.0,
    "estimated_power_draw_basis": "Estimated normal grid draw from the 257.75 MW permitted backup-generator fleet across four Amazon buildings. Backup nameplate is used only as an order-of-magnitude proxy, not as actual demand.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "mde-amazon-air-permit-application",
      "mde-amazon-issued-air-permit-2026"
    ],
    "projected_power_demand_mw": 160.0,
    "projected_power_demand_basis": "Estimated normal grid draw from the 257.75 MW permitted backup-generator fleet across four Amazon buildings. Backup nameplate is used only as an order-of-magnitude proxy, not as actual demand.",
    "projected_power_demand_confidence": "medium",
    "projected_power_demand_source_ids": [
      "mde-amazon-air-permit-application",
      "mde-amazon-issued-air-permit-2026"
    ],
    "funding_summary": "No facility-specific public award was identified. Eligibility for Maryland's general data-center sales-tax program is not evidence of an award.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $211,378,176 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 1405440.0,
    "estimated_annual_electricity_cost_usd": 211378176,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 160.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 211378176,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 160.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "mde-amazon-air-permit-application",
          "mde-amazon-issued-air-permit-2026"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "mde-amazon-air-permit-application",
      "mde-amazon-issued-air-permit-2026"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "annapolis-state-data-center",
    "record_type": "data_center",
    "technology_tags": [
      "Mainframe",
      "Private cloud",
      "Data storage"
    ],
    "name": "Annapolis Data Center",
    "operator": "Comptroller of Maryland",
    "owner": "State of Maryland",
    "campus": null,
    "status": "operating",
    "year_built": 1988,
    "year_built_status": "documented",
    "year_built_basis": "Maryland DGS identifies 1988 as the year built for the Annapolis Data Center.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed primary records",
    "status_tags": [
      "Built 1988",
      "Operating",
      "State owned"
    ],
    "year_built_source_ids": [
      "maryland-dgs-annapolis-data-center"
    ],
    "status_source_ids": [
      "maryland-dgs-annapolis-data-center",
      "maryland-doit-cloud-hosting"
    ],
    "plan_detail": "State mainframe and hosting facility serving the Comptroller and other Maryland agencies.",
    "permit_detail": "No current project-specific permit package was located; the state facility record confirms the building and use.",
    "financing_detail": "Publicly owned state facility; facility-level operating and capital budget amounts were not isolated in the reviewed sources.",
    "street_address": "108 Carroll Street",
    "city": "Annapolis",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21401",
    "latitude": 38.979392,
    "longitude": -76.493758,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Baltimore Gas and Electric",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not yet researched",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": null,
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": null,
    "ups_technology": null,
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": "State-owned and operated; no facility-specific appropriation amount identified in this review.",
    "public_opposition_status": "no reliable facility-specific evidence located",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No facility-specific hearing, petition, survey, or organized campaign was located in the reviewed sources.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "insufficient",
    "hardware_detail": "State enterprise hardware with a documented mainframe role plus private-cloud hosting and backup/storage infrastructure for Maryland agencies. Public sources confirm the facility function but do not disclose the current processor, storage-array, network, or UPS inventory.",
    "likely_workflows_detail": "Runs state tax, accounting, and other agency workloads that need mainframe processing, enterprise hosting, backup, storage, and continuity services for government systems.",
    "hardware_workflow_basis": "This profile comes from Maryland facility, procurement, and DoIT cloud-service documents. It reflects public service descriptions, not an audited rack inventory.",
    "profile_source_ids": [
      "maryland-dgs-annapolis-data-center",
      "maryland-doit-cloud-hosting",
      "maryland-comptroller-adc-rfp"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "maryland-dgs-annapolis-data-center",
      "maryland-doit-cloud-hosting",
      "maryland-comptroller-adc-rfp",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "generation and UPS systems",
      "facility employment",
      "facility-level operating and capital budget"
    ],
    "notes": "DGS reports a 63,600-square-foot building constructed in 1988; this is a government enterprise facility, not a commercial colocation listing.",
    "power_scale_class": "small",
    "power_scale_label": "Small",
    "power_scale_mw": 1.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a small legacy government data center because reviewed budget and facility records do not publish IT load, service capacity, or metered demand.",
    "power_scale_tag": "Estimated draw: 1 to under 5 MW",
    "power_scale_source_ids": [
      "maryland-dgs-annapolis-data-center",
      "mdp-sdat-parcel-property"
    ],
    "contestation_score": 1,
    "contestation_label": "low",
    "contestation_category": "government modernization policy",
    "contestation_basis": "The reviewed dispute concerns proposed legislation mandating retirement of the state's legacy mainframe environment, not local opposition to the Annapolis facility or its land use.",
    "contestation_source_ids": [
      "mdh-hb1167-opposition-2026"
    ],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 1.0,
    "estimated_power_draw_basis": "Estimated as a small legacy government data center because reviewed budget and facility records do not publish IT load, service capacity, or metered demand.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "maryland-dgs-annapolis-data-center",
      "mdp-sdat-parcel-property"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "funding_summary": "State-owned and operated Maryland facility; reviewed records did not isolate facility-level capital or operating funding.",
    "funding_total_known_usd": null,
    "funding_breakdown": [
      {
        "funder": "Maryland Department of General Services / Maryland DoIT",
        "amount_usd": null,
        "amount_status": "amount not isolated",
        "basis": "Responsible state agencies identified; facility-level budget amount not isolated in reviewed sources.",
        "source_ids": [
          "maryland-dgs-annapolis-data-center",
          "maryland-doit-cloud-hosting"
        ]
      }
    ],
    "funding_source_ids": [
      "maryland-dgs-annapolis-data-center",
      "maryland-doit-cloud-hosting"
    ],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $1,321,114 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 8784.0,
    "estimated_annual_electricity_cost_usd": 1321114,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 1.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 1321114,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 1.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "maryland-dgs-annapolis-data-center",
          "mdp-sdat-parcel-property"
        ]
      },
      {
        "label": "Public budget or grant context",
        "amount_usd": null,
        "amount_status": "capital context; not operating cost",
        "basis": "State-owned and operated; no facility-specific appropriation amount identified in this review.",
        "source_ids": [
          "maryland-dgs-annapolis-data-center",
          "maryland-doit-cloud-hosting"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "maryland-dgs-annapolis-data-center",
      "mdp-sdat-parcel-property"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Annapolis",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "tierpoint-baltimore-bal",
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "N+1 UPS",
      "Private cloud",
      "Carrier connectivity",
      "Managed security",
      "Redundant generators"
    ],
    "name": "TierPoint Baltimore (BAL)",
    "operator": "TierPoint, LLC",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": 1955,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 1955 for the structure at 1401 Russell Street; this is the building year, not necessarily the first year of data-center service.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "Baltimore's 2026 moratorium concerns new approvals; no project-specific dispute involving this operating facility was identified",
    "status_tags": [
      "Built 1955",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "tierpoint-baltimore",
      "baltimore-ordinance-26-128"
    ],
    "plan_detail": "Commercial colocation and managed-services facility with 28,000+ square feet and 14,000+ square feet of production space.",
    "permit_detail": "No current project-specific government permit package was located; operator documentation confirms active operation.",
    "financing_detail": "Private financing; no facility-specific public grant, loan, or tax award identified.",
    "street_address": "1401 Russell Street",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21230",
    "latitude": 39.275394,
    "longitude": -76.625805,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Baltimore Gas and Electric",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified in reviewed operator specifications",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "not stated; operator lists redundant generators",
    "backup_generator_count": 2,
    "backup_generator_capacity_mw": 3,
    "backup_generator_detail": "Two redundant 1.5 MW generators; nameplate total is not normal load.",
    "ups_technology": "true N+1 redundant UPS systems; chemistry not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "no reliable facility-specific evidence located",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "The 2026 citywide moratorium demonstrates broader policy concern but does not establish sentiment toward this long-operating facility.",
    "sentiment_source_ids": [
      "baltimore-ordinance-26-128"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "insufficient",
    "hardware_detail": "Enterprise colocation floor space with redundant generators, N+1 UPS, carrier connectivity, and operator-managed private-cloud and security infrastructure. Public materials do not enumerate specific server, storage, or accelerator platforms at the BAL site.",
    "likely_workflows_detail": "Likely mixed enterprise workloads such as colocation, disaster recovery, private cloud, managed hosting, security services, and latency-sensitive regional application hosting.",
    "hardware_workflow_basis": "Profile is based on TierPoint's Baltimore facility page and spec sheet, which describe service mix and resilience features but not customer hardware inventories.",
    "profile_source_ids": [
      "tierpoint-baltimore",
      "tierpoint-baltimore-spec"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "tierpoint-baltimore",
      "tierpoint-baltimore-spec",
      "baltimore-ordinance-26-128",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "owner",
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS rating and chemistry",
      "facility employment",
      "financing"
    ],
    "notes": "Operator specifications are primary for current marketed configuration but are not regulatory verification.",
    "power_scale_class": "small",
    "power_scale_label": "Small",
    "power_scale_mw": 1.5,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from a documented 3 MW backup-generator envelope for an operating colocation site.",
    "power_scale_tag": "Estimated draw: 1 to under 5 MW",
    "power_scale_source_ids": [
      "tierpoint-baltimore",
      "tierpoint-baltimore-spec"
    ],
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 1.5,
    "estimated_power_draw_basis": "Estimated from a documented 3 MW backup-generator envelope for an operating colocation site.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "tierpoint-baltimore",
      "tierpoint-baltimore-spec"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "funding_summary": "Private financing; no facility-specific public grant, loan, or tax award identified.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $1,981,670 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 13176.0,
    "estimated_annual_electricity_cost_usd": 1981670,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 1.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 1981670,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 1.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "tierpoint-baltimore",
          "tierpoint-baltimore-spec"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "tierpoint-baltimore",
      "tierpoint-baltimore-spec"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "tierpoint-baltimore-bwi",
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Raised-floor data hall",
      "2N UPS",
      "Private cloud",
      "Managed services",
      "Redundant generators"
    ],
    "name": "TierPoint Baltimore (BWI)",
    "operator": "TierPoint, LLC",
    "owner": null,
    "campus": "BWI Technology Park",
    "status": "operating",
    "year_built": 2013,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 2013 for the structure at 809 Pinnacle Drive; TierPoint announced the data-center conversion in 2017 for expected 2018 availability.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 2013",
      "Data center since 2018",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property",
      "tierpoint-bwi-investment"
    ],
    "status_source_ids": [
      "tierpoint-bwi",
      "tierpoint-bwi-investment"
    ],
    "plan_detail": "Commercial colocation and managed-services facility with 34,000+ total square feet and 13,000+ square feet of raised floor.",
    "permit_detail": "No current project-specific government permit package was located; operator documentation confirms active operation.",
    "financing_detail": "TierPoint announced an initial private investment exceeding $10 million in 2017; no facility-specific public award was identified.",
    "street_address": "813 Pinnacle Drive",
    "city": "Linthicum Heights",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21090",
    "latitude": 39.2134,
    "longitude": -76.68276,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Baltimore Gas and Electric",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified in reviewed operator specifications",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "not stated; operator lists redundant generators",
    "backup_generator_count": 2,
    "backup_generator_capacity_mw": 2.5,
    "backup_generator_detail": "Two redundant 1.25 MW generators; nameplate total is not normal load.",
    "ups_technology": "true 2N UPS system; chemistry not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": 10000000,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "no reliable facility-specific evidence located",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No facility-specific hearing, petition, survey, or organized campaign was located.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "insufficient",
    "hardware_detail": "Regional colocation facility with raised floor, 2N UPS, redundant generators, and support for private-cloud and managed-service stacks. Public sources do not disclose tenant server models or whether any customer has installed dense AI accelerators.",
    "likely_workflows_detail": "Likely regional colocation, private cloud, disaster recovery, and managed-enterprise hosting. A documented Anne Arundel Medical Center deployment points to continuity and regulated-workload use cases.",
    "hardware_workflow_basis": "TierPoint operator materials establish the facility design and service mix. The healthcare continuity angle is supported by TierPoint's public customer announcement, not by a full tenant list.",
    "profile_source_ids": [
      "tierpoint-bwi",
      "tierpoint-bwi-spec",
      "tierpoint-bwi-investment"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "tierpoint-bwi",
      "tierpoint-bwi-spec",
      "tierpoint-bwi-investment",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "owner",
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS rating and chemistry",
      "facility employment",
      "public incentives"
    ],
    "notes": "The announced investment is described as more than $10 million; the numeric field stores the disclosed floor, not a precise total.",
    "power_scale_class": "small",
    "power_scale_label": "Small",
    "power_scale_mw": 1.25,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from a documented 2.5 MW backup-generator envelope for an operating colocation site.",
    "power_scale_tag": "Estimated draw: 1 to under 5 MW",
    "power_scale_source_ids": [
      "tierpoint-bwi",
      "tierpoint-bwi-spec"
    ],
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 1.25,
    "estimated_power_draw_basis": "Estimated from a documented 2.5 MW backup-generator envelope for an operating colocation site.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "tierpoint-bwi",
      "tierpoint-bwi-spec"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "funding_summary": "TierPoint announced an initial facility investment exceeding $10 million. The public record reviewed does not identify a facility-specific government award.",
    "funding_total_known_usd": 10000000,
    "funding_breakdown": [
      {
        "funder": "TierPoint",
        "amount_usd": 10000000,
        "amount_status": "reported minimum",
        "basis": "Announced initial private facility investment exceeding $10 million; chart uses $10 million as a conservative floor.",
        "source_ids": [
          "tierpoint-bwi-investment"
        ]
      }
    ],
    "funding_source_ids": [
      "tierpoint-bwi-investment"
    ],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $1,651,392 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 10980.0,
    "estimated_annual_electricity_cost_usd": 1651392,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 1.25 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 1651392,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 1.25 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "tierpoint-bwi",
          "tierpoint-bwi-spec"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "tierpoint-bwi",
      "tierpoint-bwi-spec"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Linthicum Heights",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "expedient-tide-point",
    "record_type": "data_center",
    "technology_tags": [
      "Raised-floor data hall",
      "2N UPS",
      "Diesel backup generation",
      "Cloud computing",
      "Colocation"
    ],
    "name": "Expedient Baltimore Tide Point",
    "operator": "Expedient",
    "owner": null,
    "campus": "Tide Point",
    "status": "operating",
    "year_built": 1929,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 1929 for the Tide Point structure; Expedient documents its expanded data-center grand opening in 2012.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "Baltimore's 2026 moratorium concerns new approvals; no project-specific dispute involving this operating facility was identified",
    "status_tags": [
      "Built 1929",
      "Data center since 2012",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property",
      "expedient-baltimore-investment-2013"
    ],
    "status_source_ids": [
      "expedient-tide-point-spec",
      "baltimore-ordinance-26-128"
    ],
    "plan_detail": "Commercial data center with 23,000 square feet, 8,900 square feet raised floor, and 1.5 MW stated critical IT load.",
    "permit_detail": "No current project-specific government permit package was located; operator documentation confirms active operation.",
    "financing_detail": "Expedient reported more than $6 million of private upgrades and expansions during 2011\u20132013; no public award identified.",
    "street_address": "1050 Hull Street, Suite 150",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21230",
    "latitude": 39.274797,
    "longitude": -76.590922,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Baltimore Gas and Electric",
    "reported_power_capacity_mw": 1.5,
    "reported_power_capacity_basis": "operator-stated critical IT load",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified; operator specifies diesel backup",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": 4,
    "backup_generator_capacity_mw": 3.6,
    "backup_generator_detail": "Four auto-cutover diesel generators; operator reports 3.6 MW total.",
    "ups_technology": "2N UPS configuration; chemistry not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": 6000000,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "no reliable facility-specific evidence located",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "The citywide moratorium is broader than this facility and cannot be scored as site-specific opposition.",
    "sentiment_source_ids": [
      "baltimore-ordinance-26-128"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "insufficient",
    "hardware_detail": "Raised-floor enterprise facility with 1.5 MW stated critical IT load, 2N UPS, diesel backup, and infrastructure used for Expedient cloud and colocation services. Public sources do not break out the exact CPU, storage, network-fabric, or accelerator hardware installed here.",
    "likely_workflows_detail": "Likely enterprise cloud, colocation, disaster recovery, managed services, data-management, edge, and some AI-oriented workloads because Expedient positions Baltimore as one of its cloud availability zones.",
    "hardware_workflow_basis": "Facility hardware facts come from the Tide Point spec sheet; workload characterization uses Expedient's current Baltimore data-center page and remains service-level rather than customer-specific.",
    "profile_source_ids": [
      "expedient-tide-point-spec",
      "expedient-baltimore",
      "expedient-baltimore-investment-2013"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "expedient-tide-point-spec",
      "expedient-baltimore-investment-2013",
      "baltimore-ordinance-26-128",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "owner",
      "annual electricity use",
      "PUE",
      "UPS rating and chemistry",
      "facility employment",
      "public incentives"
    ],
    "notes": "The operator calls 1.5 MW critical IT load; it is not metered demand or annual consumption. Numeric investment is the disclosed minimum.",
    "power_scale_class": "small",
    "power_scale_label": "Small",
    "power_scale_mw": 1.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated operating draw from the operator-stated 1.5 MW critical IT load, using a partial-utilization proxy because measured utility demand is not public.",
    "power_scale_tag": "Estimated draw: 1 to under 5 MW",
    "power_scale_source_ids": [
      "expedient-tide-point-spec"
    ],
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 1.0,
    "estimated_power_draw_basis": "Estimated operating draw from the operator-stated 1.5 MW critical IT load, using a partial-utilization proxy because measured utility demand is not public.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "expedient-tide-point-spec"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "funding_summary": "Expedient reported more than $6 million of upgrades and expansions for its Baltimore data-center footprint during 2011\u20132013.",
    "funding_total_known_usd": 6000000,
    "funding_breakdown": [
      {
        "funder": "Expedient",
        "amount_usd": 6000000,
        "amount_status": "reported minimum",
        "basis": "Reported upgrades and expansions exceeded $6 million; chart uses $6 million as a conservative floor.",
        "source_ids": [
          "expedient-baltimore-investment-2013"
        ]
      }
    ],
    "funding_source_ids": [
      "expedient-baltimore-investment-2013"
    ],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $1,321,114 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 8784.0,
    "estimated_annual_electricity_cost_usd": 1321114,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 1.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 1321114,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 1.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "expedient-tide-point-spec"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "expedient-tide-point-spec"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "expedient-owings-mills",
    "record_type": "data_center",
    "technology_tags": [
      "Raised-floor data hall",
      "2N UPS",
      "Diesel backup generation",
      "Cloud computing",
      "Colocation"
    ],
    "name": "Expedient Baltimore Owings Mills",
    "operator": "Expedient",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": 1999,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 1999 for the structure at 11155 Red Run Boulevard; Expedient documents opening the previously private-use data center in 2013.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 1999",
      "Data center since 2013",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property",
      "expedient-baltimore-investment-2013"
    ],
    "status_source_ids": [
      "expedient-owings-mills-spec",
      "expedient-baltimore-investment-2013"
    ],
    "plan_detail": "Commercial data center with 22,000 square feet, 8,800 square feet raised floor, and 800 kW stated critical IT load.",
    "permit_detail": "No current project-specific government permit package was located; operator documentation confirms active operation.",
    "financing_detail": "Expedient announced several million dollars of private upgrades before its 2013 opening; no exact total or public award identified.",
    "street_address": "11155 Red Run Boulevard, Suite 200",
    "city": "Owings Mills",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21117",
    "latitude": 39.427125,
    "longitude": -76.811776,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Baltimore Gas and Electric",
    "reported_power_capacity_mw": 0.8,
    "reported_power_capacity_basis": "operator-stated critical IT load",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified; operator specifies diesel backup",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": 2,
    "backup_generator_capacity_mw": 3.5,
    "backup_generator_detail": "Two auto-cutover diesel generators; operator reports 3.5 MW total.",
    "ups_technology": "2N UPS configuration; chemistry not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "no reliable facility-specific evidence located",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No facility-specific hearing, petition, survey, or organized campaign was located.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "insufficient",
    "hardware_detail": "Raised-floor enterprise facility with 800 kW stated critical IT load, 2N UPS, diesel backup, and networked cloud infrastructure tied into Expedient's broader platform. Public sources do not disclose tenant rack contents or any specific GPU deployment at Owings Mills.",
    "likely_workflows_detail": "Likely enterprise cloud, colocation, disaster recovery, managed services, edge, and regulated-business workloads needing a second Baltimore-area site for failover or locality.",
    "hardware_workflow_basis": "Hardware facts come from the Owings Mills spec sheet; likely workflows come from Expedient's Baltimore service positioning and the role of a secondary regional facility.",
    "profile_source_ids": [
      "expedient-owings-mills-spec",
      "expedient-baltimore",
      "expedient-baltimore-investment-2013"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "expedient-owings-mills-spec",
      "expedient-baltimore-investment-2013",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "owner",
      "annual electricity use",
      "PUE",
      "UPS rating and chemistry",
      "facility employment",
      "exact investment",
      "public incentives"
    ],
    "notes": "The operator calls 800 kW critical IT load; it is not metered demand or annual consumption.",
    "power_scale_class": "sub-megawatt",
    "power_scale_label": "Sub-megawatt",
    "power_scale_mw": 0.55,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated operating draw from the operator-stated 0.8 MW critical IT load, using a partial-utilization proxy because measured utility demand is not public.",
    "power_scale_tag": "Estimated draw: under 1 MW",
    "power_scale_source_ids": [
      "expedient-owings-mills-spec"
    ],
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 0.55,
    "estimated_power_draw_basis": "Estimated operating draw from the operator-stated 0.8 MW critical IT load, using a partial-utilization proxy because measured utility demand is not public.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "expedient-owings-mills-spec"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "funding_summary": "Expedient announced several million dollars of private upgrades before its 2013 opening; no exact total or public award identified.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $726,612 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 4831.2,
    "estimated_annual_electricity_cost_usd": 726612,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 0.55 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 726612,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 0.55 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "expedient-owings-mills-spec"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "expedient-owings-mills-spec"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Owings Mills",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "databank-bwi1-baltimore",
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "N+1 UPS",
      "Battery-backed UPS",
      "Managed hosting",
      "Cloud computing",
      "Diesel backup generation"
    ],
    "name": "DataBank BWI1",
    "operator": "DataBank / AiNET / Lumen",
    "owner": null,
    "campus": "300 West Lexington carrier hotel",
    "status": "operating",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "The intersecting official SDAT parcel record does not publish a YEARBLT value, and the reviewed operator specification sheets do not state a construction year.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "Baltimore's 2026 moratorium concerns new approvals; no project-specific dispute involving this operating facility was identified",
    "status_tags": [
      "Year unknown",
      "Operating",
      "Directory listed"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property",
      "databank-bwi1-2020"
    ],
    "status_source_ids": [
      "databank-bwi1-2020",
      "baltimore-ordinance-26-128",
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "Multi-tenant downtown facility with 10,000 square feet raised floor and a stated Tier III design.",
    "permit_detail": "No current project-specific government permit package was located; operator documentation confirms active operation.",
    "financing_detail": "No facility-specific financing or public award identified.",
    "street_address": "300 West Lexington Street",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21201",
    "latitude": 39.2917,
    "longitude": -76.620038,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Baltimore Gas and Electric",
    "reported_power_capacity_mw": 0.6,
    "reported_power_capacity_basis": "operator-stated critical power; separate fact sheet value is 1.5 MW site power",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified in reviewed operator specification",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "not disclosed",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Operator states a backup generation plan and 72-hour fuel capacity but does not enumerate units in the reviewed fact sheet.",
    "ups_technology": "N+1 UPS with N+1+1 battery backup; chemistry not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "no reliable facility-specific evidence located",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "The citywide moratorium is broader than this existing carrier-hotel facility.",
    "sentiment_source_ids": [
      "baltimore-ordinance-26-128"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "insufficient",
    "hardware_detail": "Carrier-hotel style multitenant hardware environment with dense network connectivity, 600 kW stated critical power, N+1 UPS with battery backup, and infrastructure for managed hosting, cloud, and dedicated platforms. The public fact sheet does not identify specific server or accelerator generations.",
    "likely_workflows_detail": "Likely interconnection-heavy managed hosting, IaaS, PaaS, dedicated servers, compliance-oriented workloads, and edge-style regional services that benefit from downtown carrier access.",
    "hardware_workflow_basis": "Both hardware and workflow descriptions come from DataBank's Baltimore fact sheet; the language reflects marketed service classes and compliance targets rather than a live tenant census.",
    "profile_source_ids": [
      "databank-bwi1-2020",
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "databank-bwi1-2020",
      "baltimore-ordinance-26-128",
      "esri-world-geocoder",
      "datacentermap-baltimore-2026"
    ],
    "not_disclosed_fields": [
      "owner",
      "annual electricity use",
      "PUE",
      "generator count and rating",
      "UPS rating and chemistry",
      "facility employment",
      "financing",
      "facility grid demand",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "The 2020 sheet reports 600 kW critical power and 1.5 MW site power; the record uses critical power, not total site service, in reported_grid_demand_mw. Shares the 300 West Lexington carrier-hotel building with other listed providers; retained as a separate operator/listing record. Merged physical facility alias: ainet-one-market-center-baltimore (AiNET One Market Center). Shares the 300 West Lexington carrier-hotel building with other listed providers; retained as a separate provider/listing record. Merged physical facility alias: lumen-baltimore (Lumen Baltimore). Collapsed duplicate tenant/provider listings into one physical facility record. Aliases: ainet-one-market-center-baltimore, lumen-baltimore",
    "power_scale_class": "sub-megawatt",
    "power_scale_label": "Sub-megawatt",
    "power_scale_mw": 0.4,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated operating draw from the published 600 kW critical-power figure. The separate 1.5 MW site-power figure is not used as normal demand.",
    "power_scale_tag": "Estimated draw: under 1 MW",
    "power_scale_source_ids": [
      "databank-bwi1-2020"
    ],
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 0.4,
    "estimated_power_draw_basis": "Estimated operating draw from the published 600 kW critical-power figure. The separate 1.5 MW site-power figure is not used as normal demand.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "databank-bwi1-2020"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "funding_summary": "No facility-specific financing or public award identified.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $528,445 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 3513.6,
    "estimated_annual_electricity_cost_usd": 528445,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 0.4 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 528445,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 0.4 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "databank-bwi1-2020",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "databank-bwi1-2020",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "facility_alias_ids": [
      "ainet-one-market-center-baltimore",
      "lumen-baltimore"
    ],
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "databridge-silver-spring",
    "record_type": "data_center",
    "technology_tags": [
      "UPS",
      "Standby generators",
      "Managed hosting",
      "Data storage",
      "Networking"
    ],
    "name": "DataBridge Sites Silver Spring",
    "operator": "DataBridge Sites",
    "owner": "PDC Property / Priseda",
    "campus": null,
    "status": "operating",
    "year_built": 2009,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 2009 for the structure at 12401 Prosperity Drive; this is the building year, not necessarily the first year of data-center service.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 2009",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "databridge-home",
      "databridge-services"
    ],
    "plan_detail": "Commercial colocation and managed-services facility; operator reports 10 MW power capacity with expansion room.",
    "permit_detail": "No current project-specific government permit package was located; operator documentation confirms active operation.",
    "financing_detail": "No facility-specific financing or public award identified.",
    "street_address": "12401 Prosperity Drive",
    "city": "Silver Spring",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20904",
    "latitude": 39.058682,
    "longitude": -76.964745,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Pepco",
    "reported_power_capacity_mw": 10,
    "reported_power_capacity_basis": "operator-marketed site power capacity",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified; operator describes standby generators",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "not disclosed",
    "backup_generator_count": 6,
    "backup_generator_capacity_mw": 14.4,
    "backup_generator_detail": "Operator reports six 2.4 MW standby generators; nameplate total is not normal load.",
    "ups_technology": "redundant UPS systems; chemistry and rating not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "no reliable facility-specific evidence located",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "Countywide data-center restrictions do not establish sentiment toward this operating facility.",
    "sentiment_source_ids": [
      "montgomery-zta-26-01"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "insufficient",
    "hardware_detail": "Commercial facility with operator-stated 10 MW capacity, redundant UPS, six large standby generators, and managed space, power, cooling, server, storage, and networking support. Public materials do not disclose the installed virtualization stack, storage arrays, or accelerator inventory.",
    "likely_workflows_detail": "Likely colocation, private cloud hosting, cloud disaster recovery, and fully managed IT workloads, especially for regulated organizations that need resilient on-prem-style infrastructure in Maryland.",
    "hardware_workflow_basis": "Profile is drawn from DataBridge's infrastructure and service pages. Workflow characterization follows its marketed product lines and compliance-oriented messaging, not disclosed customer deployments.",
    "profile_source_ids": [
      "databridge-home",
      "databridge-services"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "databridge-home",
      "databridge-services",
      "montgomery-zta-26-01",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "annual electricity use",
      "PUE",
      "generator fuel",
      "UPS rating and chemistry",
      "facility employment",
      "financing"
    ],
    "notes": "The 10 MW figure is marketed capacity, not metered demand; it remains labeled as reported rather than estimated.",
    "power_scale_class": "medium",
    "power_scale_label": "Medium",
    "power_scale_mw": 6.5,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from the marketed 10 MW site-power capacity using a partial-utilization proxy.",
    "power_scale_tag": "Estimated draw: 5 to under 20 MW",
    "power_scale_source_ids": [
      "databridge-home"
    ],
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 6.5,
    "estimated_power_draw_basis": "Estimated from the marketed 10 MW site-power capacity using a partial-utilization proxy.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "databridge-home"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "funding_summary": "No facility-specific financing or public award identified.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $8,587,238 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 57096.0,
    "estimated_annual_electricity_cost_usd": 8587238,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 6.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 8587238,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 6.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "databridge-home",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "databridge-home",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Silver Spring",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "atmosphere-dickerson",
    "record_type": "data_center",
    "technology_tags": [
      "Hyperscale computing",
      "Battery energy storage"
    ],
    "name": "Atmosphere Data Centers Dickerson proposal",
    "operator": "Atmosphere Data Centers",
    "owner": "Terra Energy",
    "campus": "Former Dickerson Generating Station site",
    "status": "proposed / zoning prohibition enacted",
    "year_built": null,
    "year_built_status": "not built",
    "year_built_basis": "The proposal is not built. The parcel's existing power-plant structures are not the proposed data center and are therefore not used as its built year.",
    "development_status": "proposed / not built",
    "permit_status": "conditional-use and NPDES applications entered review; no building permit identified",
    "air_permit_status": "no approved data-center air permit identified in the reviewed records",
    "legal_status": "DCD reports Atmosphere challenged Montgomery County's six-month data-center permit moratorium after County Executive Marc Elrich issued it on June 12, 2026. Montgomery County also enacted Ordinance 20-35 prohibiting data centers in all zones effective August 17, 2026; its transition rule reaches applications without a building permit before that date.",
    "status_tags": [
      "Not built",
      "Proposed",
      "Applications under review",
      "Legal restriction enacted",
      "Effective Aug 17 2026"
    ],
    "year_built_source_ids": [
      "montgomery-dickerson-case"
    ],
    "status_source_ids": [
      "montgomery-dickerson-case",
      "mde-atmosphere-npdes",
      "montgomery-zta-26-01",
      "dcd-atmosphere-moratorium-challenge-2026"
    ],
    "plan_detail": "Proposed 360 MW hyperscale campus at the former Dickerson Power Plant site. DCD reports five 226,850-square-foot data-center buildings, and the existing record also tracks the paired battery-energy-storage component described in county and state review materials.",
    "permit_detail": "A Montgomery County conditional-use case and MDE NPDES application 26-DP-3903 entered review. DCD reports the moratorium stopped processing of the stormwater management concept plan and fire access plan; on July 28, 2026 the County Council approved ZTA 26-01 prohibiting large data centers countywide, including this proposal.",
    "financing_detail": "Private financing details were not disclosed in reviewed records; proposed annual county tax-revenue claims are forecasts, not financing.",
    "street_address": "21200 Martinsburg Road",
    "city": "Dickerson",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20842",
    "latitude": 39.210243,
    "longitude": -77.463848,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 5,
    "site_acres": null,
    "utility": "Potomac Edison / PJM interconnection under review",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified; a battery energy storage system was proposed",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": "proposed battery energy storage, rating not verified",
    "backup_generation_fuel": null,
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": null,
    "ups_technology": null,
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": 0,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "strong documented opposition",
    "public_sentiment_score": -2,
    "public_sentiment_label": "strongly opposed",
    "sentiment_basis": "Formal testimony, organized advocacy, an enacted permit pause, and the unanimous countywide zoning prohibition show sustained opposition; some officials also cited possible economic benefits.",
    "sentiment_source_ids": [
      "montgomery-dickerson-case",
      "montgomery-zta-26-01",
      "montgomery-data-center-pause-2026"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "high",
    "hardware_detail": "Proposed 360 MW hyperscale campus with five 226,850-square-foot data-center buildings at the former Dickerson Power Plant. DCD reports the owner Terra Energy first submitted plans in 2023. Public filings reviewed do not disclose rack density, server classes, or cooling architecture.",
    "likely_workflows_detail": "Likely hyperscale cloud, storage, and possibly AI training or inference workloads because the proposal was framed as a large data-center redevelopment of a former generating-station site, but no tenant or service catalog was publicly identified.",
    "hardware_workflow_basis": "This is a proposal-stage inference from land-use and permit materials. It should be read as likely intended use, not confirmed installed hardware or contracted workloads.",
    "profile_source_ids": [
      "montgomery-dickerson-case",
      "mde-atmosphere-npdes",
      "dcd-atmosphere-moratorium-challenge-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "montgomery-dickerson-case",
      "mde-atmosphere-npdes",
      "montgomery-zta-26-01",
      "dcd-atmosphere-moratorium-challenge-2026",
      "montgomery-data-center-pause-2026",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "building count",
      "site area",
      "verified grid demand",
      "annual electricity use",
      "PUE",
      "backup and UPS systems",
      "committed employment",
      "investment and financing"
    ],
    "notes": "Zero current employees reflects a proposal that is not operating; it is not an employment forecast.",
    "power_scale_class": "very-large",
    "power_scale_label": "Very large",
    "power_scale_mw": 360.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from the proposal's published 360 MW campus scale; it is planning demand, not operating load.",
    "power_scale_tag": "Estimated draw: 100 MW or more",
    "power_scale_source_ids": [
      "montgomery-zta-26-01",
      "dcd-atmosphere-moratorium-challenge-2026"
    ],
    "contestation_score": 4,
    "contestation_label": "very high",
    "contestation_category": "public, permitting, and legal",
    "contestation_basis": "The proposed 360 MW campus generated organized testimony and county action, was stopped by a permit moratorium and zoning prohibition, and its developer challenged the county's treatment of pending approvals.",
    "contestation_source_ids": [
      "montgomery-zta-26-01",
      "dcd-atmosphere-moratorium-challenge-2026",
      "montgomery-data-center-pause-2026"
    ],
    "salient_news_source_ids": [
      "dcd-atmosphere-moratorium-challenge-2026",
      "montgomery-data-center-pause-2026"
    ],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 360.0,
    "estimated_power_draw_basis": "Estimated from the proposal's published 360 MW campus scale; it is planning demand, not operating load.",
    "estimated_power_draw_confidence": "high",
    "estimated_power_draw_source_ids": [
      "montgomery-zta-26-01",
      "dcd-atmosphere-moratorium-challenge-2026"
    ],
    "projected_power_demand_mw": 360.0,
    "projected_power_demand_basis": "Estimated from the proposal's published 360 MW campus scale; it is planning demand, not operating load.",
    "projected_power_demand_confidence": "high",
    "projected_power_demand_source_ids": [
      "montgomery-zta-26-01",
      "dcd-atmosphere-moratorium-challenge-2026"
    ],
    "funding_summary": "Private financing details were not disclosed in reviewed records; proposed annual county tax-revenue claims are forecasts, not financing.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $475,600,896 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 3162240.0,
    "estimated_annual_electricity_cost_usd": 475600896,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 360.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 475600896,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 360.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "dcd-atmosphere-moratorium-challenge-2026",
          "eia-retail-sales-md-all-sectors-2024",
          "montgomery-zta-26-01"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "dcd-atmosphere-moratorium-challenge-2026",
      "eia-retail-sales-md-all-sectors-2024",
      "montgomery-zta-26-01"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Dickerson",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "brightseat-tech-park-landover",
    "record_type": "data_center",
    "technology_tags": [
      "Hyperscale computing"
    ],
    "name": "Brightseat Tech Park / former Landover Mall proposal",
    "operator": null,
    "owner": "Lerner Enterprises affiliate",
    "campus": "Former Landover Mall",
    "status": "concept / permits paused",
    "year_built": null,
    "year_built_status": "not built",
    "year_built_basis": "The data-center concept is not built. Existing structures on the parcel are unrelated and are not treated as the project's built year.",
    "development_status": "concept / planning",
    "permit_status": "qualified-data-center permit processing paused by county executive order",
    "air_permit_status": "no project-specific air-permit application or approval identified in the reviewed records",
    "legal_status": "Prince George's County Executive Order 2026-15 continues an administrative moratorium on accepting, considering, or processing covered data-center permits",
    "status_tags": [
      "Not built",
      "Planning",
      "Permits paused",
      "Administrative moratorium",
      "Contested publicly"
    ],
    "year_built_source_ids": [
      "pg-central-avenue-kickoff"
    ],
    "status_source_ids": [
      "pg-qualified-data-centers",
      "pg-executive-orders-2026"
    ],
    "plan_detail": "Property-owner concept for a five-building hyperscale campus on the 88-acre former mall site; no operator or issued construction permit was identified.",
    "permit_detail": "Prince George's County paused data-center use and occupancy approvals and extended the moratorium through Executive Order 2026-15 while its task-force recommendations are considered.",
    "financing_detail": "A reported $5 billion private development concept and tax-revenue forecasts are not executed financing; no public award identified.",
    "street_address": "2000 Brightseat Road",
    "city": "Landover",
    "county": "Prince George's",
    "state": "MD",
    "postal_code": "20785",
    "latitude": 38.917368,
    "longitude": -76.861048,
    "coordinate_method": "Esri World Geocoding Service point-address match for former mall site",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 5,
    "site_acres": 88,
    "utility": "Pepco",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not disclosed in reviewed concept materials",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": null,
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": null,
    "ups_technology": null,
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": 0,
    "employees_committed": null,
    "capital_investment_usd": 5000000000,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "public_opposition_status": "strong documented opposition",
    "public_sentiment_score": -2,
    "public_sentiment_label": "strongly opposed",
    "sentiment_basis": "A site-specific petition exceeded 20,000 signatures, residents held a rally, and more than 60 organizations and local groups signed an opposition letter. The score measures documented activity, not every resident's view.",
    "sentiment_source_ids": [
      "axios-landover-opposition-2025",
      "pg-qualified-data-centers",
      "pg-executive-orders-2026"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "high",
    "hardware_detail": "Concept-only five-building hyperscale campus on a former mall property. Public reporting describes the scale and redevelopment plan but does not disclose rack design, cooling system, backup plant, or tenant hardware.",
    "likely_workflows_detail": "Likely hyperscale cloud, storage, and AI-adjacent workloads because the project was marketed as a multibillion-dollar data-center campus, but no operator or service profile has been publicly confirmed.",
    "hardware_workflow_basis": "This record has no named operator and no issued construction permit. Hardware and workflow statements are therefore limited to concept-stage inference from planning and reporting.",
    "profile_source_ids": [
      "pg-central-avenue-kickoff",
      "wbj-landover-concept-2024",
      "pg-qualified-data-centers"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "pg-central-avenue-kickoff",
      "pg-qualified-data-centers",
      "pg-executive-orders-2026",
      "wbj-landover-concept-2024",
      "axios-landover-opposition-2025",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "operator",
      "verified design and load",
      "annual electricity use",
      "PUE",
      "generation and UPS systems",
      "committed employment",
      "executed financing and incentives"
    ],
    "notes": "Building count, acreage, and investment are reported concept figures, not permitted construction.",
    "power_scale_class": "very-large",
    "power_scale_label": "Very large",
    "power_scale_mw": 300.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as five large data-center buildings on an 88-acre concept plan, using 60 MW per building as a planning-scale proxy because utility demand and IT load are not public.",
    "power_scale_tag": "Estimated draw: 100 MW or more",
    "power_scale_source_ids": [
      "axios-landover-opposition-2025",
      "pg-executive-orders-2026"
    ],
    "contestation_score": 4,
    "contestation_label": "very high",
    "contestation_category": "organized public and political",
    "contestation_basis": "Nearly 24,000 petition signatures, rallies, sustained resident opposition, and county moratoria make this one of Maryland's most contested proposals. The evidence is unusually site-specific to the former Landover Mall plan.",
    "contestation_source_ids": [
      "banner-landover-moratorium-2026",
      "axios-landover-opposition-2025",
      "pg-executive-orders-2026"
    ],
    "salient_news_source_ids": [
      "banner-landover-moratorium-2026",
      "axios-landover-opposition-2025"
    ],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 300.0,
    "estimated_power_draw_basis": "Estimated as five large data-center buildings on an 88-acre concept plan, using 60 MW per building as a planning-scale proxy because utility demand and IT load are not public.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "axios-landover-opposition-2025",
      "pg-executive-orders-2026"
    ],
    "projected_power_demand_mw": 300.0,
    "projected_power_demand_basis": "Estimated as five large data-center buildings on an 88-acre concept plan, using 60 MW per building as a planning-scale proxy because utility demand and IT load are not public.",
    "projected_power_demand_confidence": "low",
    "projected_power_demand_source_ids": [
      "axios-landover-opposition-2025",
      "pg-executive-orders-2026"
    ],
    "funding_summary": "The former Landover Mall concept was reported as a $5 billion development proposal. The reviewed records do not name executed funders or a public award.",
    "funding_total_known_usd": 5000000000,
    "funding_breakdown": [
      {
        "funder": "Unnamed Brightseat Tech Park development sponsor",
        "amount_usd": 5000000000,
        "amount_status": "reported concept value",
        "basis": "Reported $5 billion development concept; not evidence of closed project financing.",
        "source_ids": [
          "wbj-landover-concept-2024"
        ]
      }
    ],
    "funding_source_ids": [
      "wbj-landover-concept-2024"
    ],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $396,334,080 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 2635200.0,
    "estimated_annual_electricity_cost_usd": 396334080,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 300.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 396334080,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 300.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "axios-landover-opposition-2025",
          "eia-retail-sales-md-all-sectors-2024",
          "pg-executive-orders-2026"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "axios-landover-opposition-2025",
      "eia-retail-sales-md-all-sectors-2024",
      "pg-executive-orders-2026"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Prince George's County",
      "Landover",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "jhu-bayview-research-data-center",
    "record_type": "data_center",
    "technology_tags": [
      "High-performance computing",
      "Data storage",
      "Research networking"
    ],
    "name": "Johns Hopkins Bayview research data center",
    "operator": "Johns Hopkins University",
    "owner": "Johns Hopkins University",
    "campus": "Johns Hopkins Bayview Medical Center",
    "status": "planned / publicly funded",
    "year_built": null,
    "year_built_status": "not built",
    "year_built_basis": "The announced research data center is not built. Existing Bayview campus structures are unrelated and are not used as the project's built year.",
    "development_status": "planned / not built",
    "permit_status": "project-level building, air, and utility permits not identified in the reviewed records",
    "air_permit_status": "no project-specific air-permit application or approval identified in the reviewed records",
    "legal_status": "Baltimore enacted a one-year data-center approval moratorium, but its higher-education and biomedical-research exclusions may apply; no project-specific interpretation or ruling was identified",
    "status_tags": [
      "Not built",
      "Planned",
      "Publicly funded",
      "Permits not identified",
      "Moratorium applicability unresolved"
    ],
    "year_built_source_ids": [
      "jhu-bayview-project-2026"
    ],
    "status_source_ids": [
      "jhu-bayview-project-2026",
      "jhu-bayview-state-grant-2026",
      "baltimore-ordinance-26-128"
    ],
    "plan_detail": "Proposed university research-computing facility supporting life sciences, biomedical research, data science, AI, public health, engineering, physics, and astronomy.",
    "permit_detail": "Project-level building, air, and utility permits were not identified in the reviewed sources; Baltimore's temporary moratorium contains exemptions that require project-specific legal review.",
    "financing_detail": "Reported total project cost is $196 million. Maryland's Board of Public Works approved a $9 million state grant on May 6, 2026.",
    "street_address": "4940 Eastern Avenue",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.290471,
    "longitude": -76.547194,
    "coordinate_method": "Esri World Geocoding Service campus-address match; marker is approximate",
    "coordinate_checked_date": "2026-08-07",
    "building_count": 1,
    "site_acres": null,
    "utility": "Baltimore Gas and Electric",
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "on_site_natural_gas_power_plant": "not identified in reviewed project reporting",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": null,
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": null,
    "ups_technology": null,
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": 0,
    "employees_committed": null,
    "capital_investment_usd": 196000000,
    "tax_incentive_detail": null,
    "public_funding_detail": "$9 million Maryland capital grant approved by the Board of Public Works on May 6, 2026.",
    "public_opposition_status": "mixed / indirect evidence",
    "public_sentiment_score": 0,
    "public_sentiment_label": "mixed or unclear",
    "sentiment_basis": "The project received a public grant while Baltimore enacted a citywide pause amid broad concerns. No representative poll or large project-specific campaign was located.",
    "sentiment_source_ids": [
      "jhu-bayview-project-2026",
      "jhu-bayview-state-grant-2026",
      "baltimore-ordinance-26-128"
    ],
    "sentiment_assessed_date": "2026-08-07",
    "sentiment_confidence": "low",
    "hardware_detail": "Planned academic research-computing hardware likely centered on HPC clusters, high-throughput storage, and advanced research networking. Public Johns Hopkins materials for ARCH at Bayview describe shared high-performance computing resources and reliable data storage, but not the exact hardware to be installed in the new facility.",
    "likely_workflows_detail": "Likely computational biology, biomedical simulation, public-health analytics, physics and astronomy workloads, data-intensive science, and AI or machine-learning research for university users.",
    "hardware_workflow_basis": "This profile combines public reporting on the new Bayview project with Johns Hopkins' current description of ARCH's Bayview-based HPC mission. It is a mission-level inference, not a published bill of materials for the planned building.",
    "profile_source_ids": [
      "jhu-bayview-project-2026",
      "jhu-bayview-state-grant-2026",
      "jhu-arch-about"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "jhu-bayview-project-2026",
      "jhu-bayview-state-grant-2026",
      "baltimore-ordinance-26-128",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "exact project parcel",
      "site area",
      "grid demand",
      "annual electricity use",
      "PUE",
      "generation and UPS systems",
      "committed employment",
      "remaining financing sources"
    ],
    "notes": "Campus-address marker is approximate. Public grant and reported total cost are separate figures.",
    "power_scale_class": "medium",
    "power_scale_label": "Medium",
    "power_scale_mw": 5.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a university research data center because public funding records identify the project but do not disclose utility demand or IT load.",
    "power_scale_tag": "Estimated draw: 5 to under 20 MW",
    "power_scale_source_ids": [
      "jhu-bayview-state-grant-2026"
    ],
    "contestation_score": 1,
    "contestation_label": "low / indirect",
    "contestation_category": "citywide policy context",
    "contestation_basis": "The project received public funding while Baltimore debated and enacted a broader pause. No substantial project-specific opposition campaign or legal challenge was found, and statutory research and higher-education exclusions may apply.",
    "contestation_source_ids": [
      "jhu-bayview-state-grant-2026",
      "baltimore-ordinance-26-128"
    ],
    "salient_news_source_ids": [
      "jhu-bayview-state-grant-2026"
    ],
    "contestation_assessed_date": "2026-08-09",
    "estimated_power_draw_mw": 5.0,
    "estimated_power_draw_basis": "Estimated as a university research data center because public funding records identify the project but do not disclose utility demand or IT load.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "jhu-bayview-state-grant-2026"
    ],
    "projected_power_demand_mw": 5.0,
    "projected_power_demand_basis": "Estimated as a university research data center because public funding records identify the project but do not disclose utility demand or IT load.",
    "projected_power_demand_confidence": "low",
    "projected_power_demand_source_ids": [
      "jhu-bayview-state-grant-2026"
    ],
    "funding_summary": "The project was reported at $196 million, including a $9 million Maryland capital grant approved by the Board of Public Works; the remainder is not broken down by funder in the reviewed record.",
    "funding_total_known_usd": 196000000,
    "funding_breakdown": [
      {
        "funder": "Maryland Board of Public Works / State of Maryland",
        "amount_usd": 9000000,
        "amount_status": "approved grant",
        "basis": "Board of Public Works approval reported for a Maryland capital grant.",
        "source_ids": [
          "jhu-bayview-state-grant-2026"
        ]
      },
      {
        "funder": "Johns Hopkins project funds and other non-itemized sources",
        "amount_usd": 187000000,
        "amount_status": "derived remainder",
        "basis": "Reported total project cost less the identified $9 million Maryland grant; reviewed records did not publish a more specific funder split.",
        "source_ids": [
          "jhu-bayview-state-grant-2026"
        ]
      }
    ],
    "funding_source_ids": [
      "jhu-bayview-state-grant-2026"
    ],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $6,605,568 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 43920.0,
    "estimated_annual_electricity_cost_usd": 6605568,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 5.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 6605568,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 5.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "jhu-bayview-state-grant-2026"
        ]
      },
      {
        "label": "Public budget or grant context",
        "amount_usd": null,
        "amount_status": "capital context; not operating cost",
        "basis": "$9 million Maryland capital grant approved by the Board of Public Works on May 6, 2026.",
        "source_ids": [
          "jhu-bayview-state-grant-2026"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "jhu-bayview-state-grant-2026"
    ],
    "facility_alias_ids": [],
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ],
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null
  },
  {
    "id": "cogent-elkridge",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Cogent Elkridge",
    "operator": "Cogent Communications (facility service materials remain published after the June 2026 property sale)",
    "owner": "I Squared Capital-sponsored entity; exact legal entity not disclosed in the reviewed closing announcement",
    "campus": null,
    "status": "operating",
    "year_built": 1985,
    "year_built_status": "documented",
    "year_built_basis": "A Cogent sale listing reported by Data Center Dynamics identifies 1985 as the building year; SDAT does not publish a YEARBLT value for this parcel.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 1985",
      "Operating",
      "Ownership changed 2026"
    ],
    "year_built_source_ids": [
      "dcd-cogent-elkridge-2025",
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "cogent-elkridge-brochure-2025",
      "cogent-elkridge-sale-closing-2026"
    ],
    "plan_detail": "Carrier-neutral retail and wholesale colocation facility serving the Baltimore-Washington corridor.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "Cogent sold this facility with nine others to an I Squared Capital-sponsored entity for $225 million in aggregate; no facility allocation was disclosed.",
    "street_address": "6050 Race Road",
    "city": "Elkridge",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21075",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Elkridge",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ],
    "latitude": 39.203478,
    "longitude": -76.712408,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": 1,
    "site_acres": 5.1,
    "utility": "CPV Retail Energy / BGE identified in Cogent wholesale materials",
    "reported_power_capacity_mw": 7.5,
    "reported_power_capacity_basis": "Cogent reports 7.50 MW of facility power and 6.17 MW of protected power; neither value is measured grid demand.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 5.0,
    "estimated_power_draw_basis": "Estimated from Cogent's 7.50 MW facility-power and 6.17 MW protected-power disclosures using a partial-utilization proxy; the disclosed values are capacity, not metered draw.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "cogent-elkridge-wholesale-2025",
      "cogent-elkridge-brochure-2025"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Operator brochure documents multiple diesel generators in 750 kW and 1,500 kW configurations without unit counts.",
    "ups_technology": "Two 250 kVA UPS units with multiple strings of East Penn AVR95-23 batteries",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": "Operator brochure lists multiple HVAC chillers plus water and air handling units; consumption is not disclosed.",
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "Cogent sold this facility as part of a ten-property, $225 million portfolio sale to an I Squared Capital-sponsored entity. No Elkridge-specific allocation was disclosed.",
    "funding_total_known_usd": null,
    "funding_breakdown": [
      {
        "funder": "I Squared Capital-sponsored acquiring entity",
        "amount_usd": null,
        "amount_status": "portfolio amount not facility allocated",
        "aggregate_amount_usd": 225000000,
        "basis": "Aggregate ten-property transaction value was disclosed; no facility allocation was published.",
        "source_ids": [
          "cogent-elkridge-sale-closing-2026"
        ]
      }
    ],
    "funding_source_ids": [
      "cogent-elkridge-sale-closing-2026"
    ],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $6,605,568 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 43920.0,
    "estimated_annual_electricity_cost_usd": 6605568,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 5.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 6605568,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 5.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "cogent-elkridge-brochure-2025",
          "cogent-elkridge-wholesale-2025",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "cogent-elkridge-brochure-2025",
      "cogent-elkridge-wholesale-2025",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "61,734-square-foot secure facility with 29,182 square feet of raised floor, 10,131 square feet of non-raised technical space, APC cabinets, wave service, and carrier-neutral connectivity.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Operator service descriptions support the facility functions; tenant hardware is not publicly inventoried.",
    "profile_source_ids": [
      "cogent-elkridge-brochure-2025",
      "cogent-elkridge-wholesale-2025"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "cogent-elkridge-brochure-2025",
      "cogent-elkridge-wholesale-2025",
      "cogent-elkridge-sale-closing-2026",
      "dcd-cogent-elkridge-2025",
      "peeringdb-md-facilities",
      "mdp-sdat-parcel-property",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "The June 29, 2026 sale transferred the real estate to an unnamed I Squared Capital-sponsored entity. Cogent's current facility materials remain the best public service description, but the post-closing operating arrangement is not disclosed.",
    "power_scale_class": "medium",
    "power_scale_label": "Medium",
    "power_scale_mw": 5.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from Cogent's 7.50 MW facility-power and 6.17 MW protected-power disclosures using a partial-utilization proxy; the disclosed values are capacity, not metered draw.",
    "power_scale_tag": "Estimated draw: 5 to under 20 MW",
    "power_scale_source_ids": [
      "cogent-elkridge-wholesale-2025"
    ]
  },
  {
    "id": "atlantech-rockville",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Atlantech Online Rockville Data Center",
    "operator": "Atlantech Online, Inc.",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": 1984,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 1984 for the structure at 1201 Seven Locks Road; this is not necessarily the first year of data-center service.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 1984",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "atlantech-data-centers",
      "atlantech-rockville"
    ],
    "plan_detail": "Commercial colocation and hosting facility within the Montrose West property.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "1201 Seven Locks Road",
    "city": "Rockville",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20854",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Rockville",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ],
    "latitude": 39.064239,
    "longitude": -77.160231,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 0.75,
    "estimated_power_draw_basis": "Estimated as a small regional colocation facility because reviewed operator pages disclose redundant power and generators but not rack count, utility demand, or IT load.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "atlantech-data-centers",
      "atlantech-rockville"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $990,835 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 6588.0,
    "estimated_annual_electricity_cost_usd": 990835,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 0.75 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 990835,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 0.75 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "atlantech-data-centers",
          "atlantech-rockville",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "atlantech-data-centers",
      "atlantech-rockville",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Operator documents colocation, redundant power and cooling, private cages, biometric access, diesel generation, UPS, and carrier connectivity; rack and power totals are not disclosed.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Operator service descriptions support the facility functions; tenant hardware is not publicly inventoried.",
    "profile_source_ids": [
      "atlantech-data-centers",
      "atlantech-rockville"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "atlantech-data-centers",
      "atlantech-rockville",
      "peeringdb-md-facilities",
      "mdp-sdat-parcel-property",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "sub-megawatt",
    "power_scale_label": "Sub-megawatt",
    "power_scale_mw": 0.75,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a small regional colocation facility because reviewed operator pages disclose redundant power and generators but not rack count, utility demand, or IT load.",
    "power_scale_tag": "Estimated draw: under 1 MW",
    "power_scale_source_ids": [
      "atlantech-data-centers",
      "atlantech-rockville"
    ]
  },
  {
    "id": "atlantech-silver-spring",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Atlantech Online Silver Spring Data Center",
    "operator": "Atlantech Online, Inc.",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": 1987,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 1987 for the structure at 1010 Wayne Avenue; this is not necessarily the first year of data-center service.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 1987",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "atlantech-data-centers",
      "atlantech-colocation-terms"
    ],
    "plan_detail": "Commercial colocation and hosting facility; Atlantech's service terms identify this as its default colocation facility.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "1010 Wayne Avenue, Suite 630",
    "city": "Silver Spring",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20910",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Silver Spring",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ],
    "latitude": 38.993604,
    "longitude": -77.027789,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 0.5,
    "estimated_power_draw_basis": "Estimated as a small regional colocation facility because reviewed operator pages disclose redundant power and generators but not rack count, utility demand, or IT load.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "atlantech-data-centers",
      "atlantech-colocation-terms"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $660,557 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 4392.0,
    "estimated_annual_electricity_cost_usd": 660557,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 0.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 660557,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 0.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "atlantech-colocation-terms",
          "atlantech-data-centers",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "atlantech-colocation-terms",
      "atlantech-data-centers",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Operator documents escorted access, redundant power grids, diesel generation, UPS, environmental controls, colocation, and hosting; site-specific rack and power totals are not disclosed.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Operator service descriptions support the facility functions; tenant hardware is not publicly inventoried.",
    "profile_source_ids": [
      "atlantech-data-centers",
      "atlantech-colocation-terms"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "atlantech-data-centers",
      "atlantech-colocation-terms",
      "peeringdb-md-facilities",
      "mdp-sdat-parcel-property",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "sub-megawatt",
    "power_scale_label": "Sub-megawatt",
    "power_scale_mw": 0.5,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a small regional colocation facility because reviewed operator pages disclose redundant power and generators but not rack count, utility demand, or IT load.",
    "power_scale_tag": "Estimated draw: under 1 MW",
    "power_scale_source_ids": [
      "atlantech-data-centers",
      "atlantech-colocation-terms"
    ]
  },
  {
    "id": "ainet-beltsville",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "AiNET Beltsville Data Center",
    "operator": "AiNET Corporation",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": 1978,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 1978 for the structure at 11700 Montgomery Road; this is not necessarily the first year of data-center service.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 1978",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "ainet-cybernap",
      "peeringdb-md-facilities"
    ],
    "plan_detail": "AiNET colocation and network facility identified by the operator as an existing Maryland data center.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "11700 Montgomery Road",
    "city": "Beltsville",
    "county": "Prince George's",
    "state": "MD",
    "postal_code": "20705",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince George's County",
      "Beltsville",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ],
    "latitude": 39.052828,
    "longitude": -76.925905,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 2.0,
    "estimated_power_draw_basis": "Estimated as a small-to-medium AiNET colocation site because public operator and registry records do not disclose site capacity or metered demand.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $2,642,227 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 17568.0,
    "estimated_annual_electricity_cost_usd": 2642227,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 2.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 2642227,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 2.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "ainet-cybernap",
          "ainet-data-center-services",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 2,
    "contestation_label": "moderate",
    "contestation_category": "operator and federal-contract legal allegation",
    "contestation_basis": "A federal indictment alleges that a company led by AiNET's founder misrepresented the Beltsville data center's certification in an SEC contract. These remain allegations, not a conviction, and are distinct from public opposition to the site's land use.",
    "contestation_source_ids": [
      "doj-beltsville-data-center-indictment-2024",
      "dcd-ainet-beltsville-indictment-2024"
    ],
    "salient_news_source_ids": [
      "dcd-ainet-beltsville-indictment-2024",
      "doj-beltsville-data-center-indictment-2024"
    ],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "AiNET identifies Beltsville as a colocation location with protected power, carrier connectivity, cloud storage access, and support services; site-specific totals are not disclosed.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Operator service descriptions support the facility functions; tenant hardware is not publicly inventoried.",
    "profile_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "ainet-cybernap",
      "ainet-global-cloud-connect",
      "ainet-data-center-services",
      "peeringdb-md-facilities",
      "mdp-sdat-parcel-property",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "small",
    "power_scale_label": "Small",
    "power_scale_mw": 2.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a small-to-medium AiNET colocation site because public operator and registry records do not disclose site capacity or metered demand.",
    "power_scale_tag": "Estimated draw: 1 to under 5 MW",
    "power_scale_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ]
  },
  {
    "id": "ainet-laurel",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "AiNET Laurel Data Center",
    "operator": "AiNET Corporation",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "The operator and registry establish the facility address, but the point did not intersect a published SDAT parcel year and no authoritative construction year was identified.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Operating"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "ainet-cybernap",
      "peeringdb-md-facilities"
    ],
    "plan_detail": "AiNET colocation and network facility identified by the operator as an existing Maryland data center.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "312 Laurel Avenue",
    "city": "Laurel",
    "county": "Prince George's",
    "state": "MD",
    "postal_code": "20707",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince George's County",
      "Laurel",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ],
    "latitude": 39.101395,
    "longitude": -76.84801,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 1.5,
    "estimated_power_draw_basis": "Estimated as a small AiNET colocation site because public operator and registry records do not disclose site capacity or metered demand.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $1,981,670 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 13176.0,
    "estimated_annual_electricity_cost_usd": 1981670,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 1.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 1981670,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 1.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "ainet-cybernap",
          "ainet-data-center-services",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "AiNET identifies Laurel as a colocation location with protected power, carrier connectivity, cloud storage access, and support services; site-specific totals are not disclosed.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Operator service descriptions support the facility functions; tenant hardware is not publicly inventoried.",
    "profile_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "ainet-cybernap",
      "ainet-global-cloud-connect",
      "ainet-data-center-services",
      "peeringdb-md-facilities",
      "mdp-sdat-parcel-property",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "small",
    "power_scale_label": "Small",
    "power_scale_mw": 1.5,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a small AiNET colocation site because public operator and registry records do not disclose site capacity or metered demand.",
    "power_scale_tag": "Estimated draw: 1 to under 5 MW",
    "power_scale_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ]
  },
  {
    "id": "ainet-cybernap-glen-burnie",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "AiNET CyberNAP",
    "operator": "AiNET Corporation",
    "owner": null,
    "campus": null,
    "status": "listed / operating status not independently verified",
    "year_built": 1987,
    "year_built_status": "documented",
    "year_built_basis": "The official SDAT parcel record lists 1987 for the large commercial structure at 7900 Ritchie Highway; the data-center fit-out date is not disclosed.",
    "development_status": "listed / operating status not independently verified",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 1987",
      "Listed facility",
      "Operating status unverified"
    ],
    "year_built_source_ids": [
      "mdp-sdat-parcel-property"
    ],
    "status_source_ids": [
      "ainet-cybernap",
      "peeringdb-md-facilities"
    ],
    "plan_detail": "AiNET describes a 300,000-square-foot carrier-neutral CyberNAP facility with high-density colocation capacity; its operator page retains future-tense opening language, so current operation is not inferred solely from that page.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "7900 Ritchie Highway",
    "city": "Glen Burnie",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21061",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Glen Burnie",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ],
    "latitude": 39.138531,
    "longitude": -76.605979,
    "coordinate_method": "Esri World Geocoding Service point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": 15,
    "utility": null,
    "reported_power_capacity_mw": 80,
    "reported_power_capacity_basis": "AiNET describes two independent 80 MW utility feeds; this is infrastructure capacity, not operating demand or IT load.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 52.0,
    "estimated_power_draw_basis": "Estimated from AiNET's published 80 MW utility-feed capacity using a partial-utilization proxy. The facility's current operating status remains separately marked as not independently verified.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $68,697,907 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 456768.0,
    "estimated_annual_electricity_cost_usd": 68697907,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 52.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 68697907,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 52.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "ainet-cybernap",
          "ainet-data-center-services",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Operator describes a 300,000-square-foot carrier hotel with more than 25 kW-per-cabinet capability, concentric security zones, cloud-storage access, and two independent utility feeds.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Operator service descriptions support the facility functions; tenant hardware is not publicly inventoried.",
    "profile_source_ids": [
      "ainet-cybernap",
      "ainet-data-center-services"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "ainet-cybernap",
      "ainet-global-cloud-connect",
      "ainet-data-center-services",
      "peeringdb-md-facilities",
      "mdp-sdat-parcel-property",
      "esri-world-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "The parcel structure is larger than AiNET's stated data-center area. The operator page uses future-tense opening language while PeeringDB lists the facility; current operating status therefore remains explicitly unverified.",
    "power_scale_class": "large",
    "power_scale_label": "Large",
    "power_scale_mw": 52.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from AiNET's published 80 MW utility-feed capacity using a partial-utilization proxy. The facility's current operating status remains separately marked as not independently verified.",
    "power_scale_tag": "Estimated draw: 20 to under 100 MW",
    "power_scale_source_ids": [
      "ainet-cybernap"
    ]
  },
  {
    "id": "databank-111-market-place",
    "facility_alias_ids": [
      "candler-building-baltimore",
      "crown-castle-baltimore"
    ],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "DataBank - 111 Market Place",
    "operator": "DataBank / Unknown Company / Crown Castle",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Operating",
      "Directory listed"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "Directory-listed downtown Baltimore connectivity facility with metro interconnects to 300 West Lexington.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "111 Market Place",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21202",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ],
    "latitude": 39.2874338,
    "longitude": -76.6063475,
    "coordinate_method": "OpenStreetMap Nominatim point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 0.5,
    "estimated_power_draw_basis": "Estimated as a smaller carrier-hotel interconnection facility because the directory listing discloses connectivity but not metered demand or power capacity.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $660,557 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 4392.0,
    "estimated_annual_electricity_cost_usd": 660557,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 0.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 660557,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 0.5 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "datacentermap-baltimore-2026",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "datacentermap-baltimore-2026",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "DataCenterMap describes direct connections to nine carriers and metro interconnects to DataBank BWI1 at 300 West Lexington; rack count and power totals are not disclosed.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Directory listing supports the connectivity role; power draw is estimated because no metered or capacity figure was found.",
    "profile_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "datacentermap-baltimore-2026",
      "openstreetmap-nominatim-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Shares the Candler Building address with other directory-listed providers; retained separately because DataCenterMap lists it separately. Shares the 111 Market Place / Candler Building location with other provider listings; retained because DataCenterMap lists it separately. Merged physical facility alias: candler-building-baltimore (Candler Building). Shares the 111 Market Place / Candler Building location with other directory listings; retained as a separate provider/listing record. Merged physical facility alias: crown-castle-baltimore (Crown Castle Baltimore). Collapsed duplicate tenant/provider listings into one physical facility record. Aliases: candler-building-baltimore, crown-castle-baltimore",
    "power_scale_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "power_scale_class": "sub-megawatt",
    "power_scale_label": "Sub-megawatt",
    "power_scale_mw": 0.5,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a smaller carrier-hotel interconnection facility because the directory listing discloses connectivity but not metered demand or power capacity.",
    "power_scale_tag": "Estimated draw: under 1 MW"
  },
  {
    "id": "infradms-bal01-baltimore",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "InfraDMS BAL01",
    "operator": "InfraDMS",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Operating",
      "Directory listed"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "Directory-listed infrastructure-services data center at One South Street.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "1 South Street",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21202",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ],
    "latitude": 39.2893325,
    "longitude": -76.6105729,
    "coordinate_method": "OpenStreetMap Nominatim point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": 0.65,
    "reported_power_capacity_basis": "DataCenterMap directory description says facility highlights include up to 650 kW of power; this is capacity, not metered draw.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 0.45,
    "estimated_power_draw_basis": "Estimated from the directory-listed 650 kW power capacity using a partial-utilization proxy; the 650 kW value is capacity, not measured demand.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": 2,
    "backup_generator_capacity_mw": 1.5,
    "backup_generator_detail": "Directory description reports dual 750 kW generators.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $594,501 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 3952.8,
    "estimated_annual_electricity_cost_usd": 594501,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 0.45 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 594501,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 0.45 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "datacentermap-baltimore-2026",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "datacentermap-baltimore-2026",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Directory description reports up to 650 kW of power, dual 750 kW generators, and redundant Liebert systems.",
    "likely_workflows_detail": "Likely regional colocation, network interconnection, managed hosting, private-cloud, and disaster-recovery workloads.",
    "hardware_workflow_basis": "Directory listing supports facility identity and power-envelope figures; measured grid demand remains estimated.",
    "profile_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "datacentermap-baltimore-2026",
      "openstreetmap-nominatim-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "sub-megawatt",
    "power_scale_label": "Sub-megawatt",
    "power_scale_mw": 0.45,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from the directory-listed 650 kW power capacity using a partial-utilization proxy; the 650 kW value is capacity, not measured demand.",
    "power_scale_tag": "Estimated draw: under 1 MW",
    "power_scale_source_ids": [
      "datacentermap-baltimore-2026"
    ]
  },
  {
    "id": "amazon-cronridge-owings-mills",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Amazon AWS - 11550 Cronridge Drive",
    "operator": "Amazon AWS",
    "owner": "Amazon AWS / acquired facility according to directory listing",
    "campus": null,
    "status": "directory listed / operating status not independently verified",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "directory listed / operating status not independently verified",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Directory listed",
      "Operating status unverified"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "DataCenterMap lists the Owings Mills Cronridge Drive property as an Amazon AWS acquired data-center facility.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "11550 Cronridge Drive",
    "city": "Owings Mills",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21117",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Owings Mills",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ],
    "latitude": 39.442891,
    "longitude": -76.7721384,
    "coordinate_method": "OpenStreetMap Nominatim point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 5.0,
    "estimated_power_draw_basis": "Estimated as a small AWS acquired data-center facility because the directory listing identifies the facility but does not disclose power capacity or metered demand.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $6,605,568 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 43920.0,
    "estimated_annual_electricity_cost_usd": 6605568,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 5.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 6605568,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 5.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "datacentermap-baltimore-2026",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "datacentermap-baltimore-2026",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Directory listing identifies an acquired Amazon AWS data-center facility; public rack, generator, and grid-demand details were not found in the reviewed listing.",
    "likely_workflows_detail": "Likely AWS cloud infrastructure if the directory listing is current; workload attribution is an operator inference, not a site-specific disclosure.",
    "hardware_workflow_basis": "Directory listing supports the facility identity; AWS workload description is an operator inference.",
    "profile_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "datacentermap-baltimore-2026",
      "openstreetmap-nominatim-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "medium",
    "power_scale_label": "Medium",
    "power_scale_mw": 5.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a small AWS acquired data-center facility because the directory listing identifies the facility but does not disclose power capacity or metered demand.",
    "power_scale_tag": "Estimated draw: 5 to under 20 MW",
    "power_scale_source_ids": [
      "datacentermap-baltimore-2026"
    ]
  },
  {
    "id": "woodlawn-drive-1500-proposal",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "1500 Woodlawn Drive data center proposal",
    "operator": "Unknown Company",
    "owner": null,
    "campus": null,
    "status": "proposed / directory listed",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "proposed",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Not built",
      "Proposed",
      "Directory listed"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "DataCenterMap describes a proposed 150 MW data-center campus on a 42-acre Baltimore County site with construction expected in June or July 2026.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "1500 Woodlawn Drive",
    "city": "Baltimore",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21241",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Baltimore",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ],
    "latitude": 39.307986,
    "longitude": -76.7385748,
    "coordinate_method": "OpenStreetMap Nominatim point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": 42,
    "utility": null,
    "reported_power_capacity_mw": 150,
    "reported_power_capacity_basis": "DataCenterMap directory description reports a proposed 150 MW campus; this is planning-scale capacity, not measured demand.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 150.0,
    "estimated_power_draw_basis": "Estimated from the directory-listed proposed 150 MW campus scale; this is planning demand, not operating load.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "projected_power_demand_mw": 150.0,
    "projected_power_demand_basis": "Estimated from the directory-listed proposed 150 MW campus scale; this is planning demand, not operating load.",
    "projected_power_demand_confidence": "medium",
    "projected_power_demand_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $198,167,040 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 1317600.0,
    "estimated_annual_electricity_cost_usd": 198167040,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 150.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 198167040,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 150.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "datacentermap-baltimore-2026",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "datacentermap-baltimore-2026",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "not researched beyond directory listing",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No facility-specific public sentiment review has been completed for this newly added directory listing.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Directory description identifies a proposed 150 MW campus and planned donation of five acres for an electrical substation; no tenant hardware was disclosed.",
    "likely_workflows_detail": "Likely hyperscale or large enterprise/cloud workloads if built, inferred from the proposed 150 MW campus scale.",
    "hardware_workflow_basis": "Directory listing supports the proposal scale; workload is a scale-based inference.",
    "profile_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "datacentermap-baltimore-2026",
      "openstreetmap-nominatim-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "very-large",
    "power_scale_label": "Very large",
    "power_scale_mw": 150.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from the directory-listed proposed 150 MW campus scale; this is planning demand, not operating load.",
    "power_scale_tag": "Estimated draw: 100 MW or more",
    "power_scale_source_ids": [
      "datacentermap-baltimore-2026"
    ]
  },
  {
    "id": "comcast-nottingham",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Comcast Nottingham",
    "operator": "Comcast",
    "owner": null,
    "campus": null,
    "status": "operating",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "operating",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Directory listed"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "Directory-listed Comcast facility in Nottingham / White Marsh.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "8031 Corporate Drive",
    "city": "Nottingham",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21236",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Nottingham",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ],
    "latitude": 39.3687901,
    "longitude": -76.4671785,
    "coordinate_method": "OpenStreetMap Nominatim point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 0.75,
    "estimated_power_draw_basis": "Estimated as a Comcast network/edge facility because the directory listing does not disclose power capacity or metered demand.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $990,835 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 6588.0,
    "estimated_annual_electricity_cost_usd": 990835,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 0.75 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 990835,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 0.75 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "datacentermap-baltimore-2026",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "datacentermap-baltimore-2026",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "DataCenterMap lists a Comcast Nottingham profile but does not disclose site-specific power, rack, UPS, or generator details in the Baltimore listing.",
    "likely_workflows_detail": "Likely cable/network headend, transport, edge compute, and enterprise infrastructure support, inferred from Comcast operator identity.",
    "hardware_workflow_basis": "Directory listing supports the facility identity; workflow is an operator inference.",
    "profile_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "datacentermap-baltimore-2026",
      "openstreetmap-nominatim-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "sub-megawatt",
    "power_scale_label": "Sub-megawatt",
    "power_scale_mw": 0.75,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a Comcast network/edge facility because the directory listing does not disclose power capacity or metered demand.",
    "power_scale_tag": "Estimated draw: under 1 MW",
    "power_scale_source_ids": [
      "datacentermap-baltimore-2026"
    ]
  },
  {
    "id": "gi-partners-eternal-rings-laurel",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "9800 South Eternal Rings Drive",
    "operator": "GI Partners",
    "owner": "GI Partners",
    "campus": null,
    "status": "directory listed / hyperscale powered shell",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "directory listed / hyperscale powered shell",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Directory listed",
      "Powered shell"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "DataCenterMap describes a hyperscale powered-shell data center in Laurel, part of a 218,000-square-foot development on 95 acres.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "9800 South Eternal Rings Drive",
    "city": "Laurel",
    "county": "Howard",
    "state": "MD",
    "postal_code": "20723",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Laurel",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ],
    "latitude": 39.1335439,
    "longitude": -76.8515612,
    "coordinate_method": "OpenStreetMap Nominatim point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": 95,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 60.0,
    "estimated_power_draw_basis": "Estimated as a hyperscale powered-shell facility from the directory-listed 218,000-square-foot development scale; no metered demand was disclosed.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $79,266,816 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 527040.0,
    "estimated_annual_electricity_cost_usd": 79266816,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 60.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 79266816,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 60.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "datacentermap-baltimore-2026",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "datacentermap-baltimore-2026",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Directory listing describes a hyperscale powered shell designed for cloud and computing contracts; no public metered demand or tenant hardware inventory was found.",
    "likely_workflows_detail": "Likely hyperscale cloud or high-density compute workloads, inferred from powered-shell scale and directory description.",
    "hardware_workflow_basis": "Directory listing supports the powered-shell identity and scale; power draw and workloads remain estimated.",
    "profile_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "datacentermap-baltimore-2026",
      "openstreetmap-nominatim-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "large",
    "power_scale_label": "Large",
    "power_scale_mw": 60.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a hyperscale powered-shell facility from the directory-listed 218,000-square-foot development scale; no metered demand was disclosed.",
    "power_scale_tag": "Estimated draw: 20 to under 100 MW",
    "power_scale_source_ids": [
      "datacentermap-baltimore-2026"
    ]
  },
  {
    "id": "gi-partners-sandy-farm-severn",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "7665 Sandy Farm Road",
    "operator": "GI Partners",
    "owner": "GI Partners",
    "campus": null,
    "status": "directory listed / hyperscale powered shell",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "directory listed / hyperscale powered shell",
    "permit_status": "historical construction and occupancy permits not researched",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Directory listed",
      "Powered shell",
      "Fully leased"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "plan_detail": "DataCenterMap describes a hyperscale powered-shell data center in Severn developed for cloud and computing contracts and fully leased.",
    "permit_detail": "No current facility-specific government permit package was identified; operator and industry records support the facility listing.",
    "financing_detail": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "street_address": "7665 Sandy Farm Road",
    "city": "Severn",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21144",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Severn",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ],
    "latitude": 39.1485935,
    "longitude": -76.6846043,
    "coordinate_method": "OpenStreetMap Nominatim point-address match",
    "coordinate_checked_date": "2026-08-09",
    "building_count": null,
    "site_acres": null,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": null,
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 60.0,
    "estimated_power_draw_basis": "Estimated as a fully leased hyperscale powered-shell facility from the directory description; no metered demand or power capacity was disclosed.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Backup generators are described by the operator, but a complete count and aggregate rating were not disclosed.",
    "ups_technology": "UPS documented; topology and energy duration not disclosed",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No facility-specific public financing or tax-exemption award was identified in the reviewed records.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $79,266,816 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 527040.0,
    "estimated_annual_electricity_cost_usd": 79266816,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 60.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 79266816,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 60.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "datacentermap-baltimore-2026",
          "eia-retail-sales-md-all-sectors-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "datacentermap-baltimore-2026",
      "eia-retail-sales-md-all-sectors-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Directory listing describes a fully leased hyperscale powered shell for cloud and computing contracts; no public metered demand or tenant hardware inventory was found.",
    "likely_workflows_detail": "Likely hyperscale cloud or high-density compute workloads, inferred from powered-shell scale and directory description.",
    "hardware_workflow_basis": "Directory listing supports the powered-shell identity and lease status; power draw and workloads remain estimated.",
    "profile_source_ids": [
      "datacentermap-baltimore-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "datacentermap-baltimore-2026",
      "openstreetmap-nominatim-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "large",
    "power_scale_label": "Large",
    "power_scale_mw": 60.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated as a fully leased hyperscale powered-shell facility from the directory description; no metered demand or power capacity was disclosed.",
    "power_scale_tag": "Estimated draw: 20 to under 100 MW",
    "power_scale_source_ids": [
      "datacentermap-baltimore-2026"
    ]
  },
  {
    "id": "fannie-mae-urbana-tech-center",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Fannie Mae Urbana Technology Center",
    "operator": "Fannie Mae",
    "owner": "Fannie Mae",
    "campus": null,
    "status": "operating / offered for sale",
    "year_built": 2004,
    "year_built_status": "documented",
    "year_built_basis": "JLL sale materials for the Fannie Mae Tech Center list original construction in 2004.",
    "development_status": "operating / offered for sale",
    "permit_status": "operating facility; no current expansion permit decision identified in the reviewed records",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 2004",
      "Operating",
      "Offered for sale 2026"
    ],
    "year_built_source_ids": [
      "jll-fannie-mae-tech-center-2026"
    ],
    "status_source_ids": [
      "frederick-oed-data-centers-2026",
      "fannie-mae-contact-urbana-tech-center",
      "jll-fannie-mae-tech-center-2026"
    ],
    "plan_detail": "Existing Tier III-equivalent enterprise data center with expansion capacity in the existing improvements and an adjacent undeveloped parcel marketed for possible future data-center development.",
    "permit_detail": "No current facility-specific government expansion permit was identified; JLL describes expansion potential and near-term power availability rather than an issued construction approval.",
    "financing_detail": "JLL states Fannie Mae is migrating operations to the cloud and intends to divest the Tech Center by year-end 2026; no facility-specific public financing was identified.",
    "street_address": "9107 Bennett Creek Boulevard",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21704",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ],
    "latitude": 39.322492,
    "longitude": -77.34973,
    "coordinate_method": "U.S. Census Geocoder street-segment match",
    "coordinate_checked_date": "2026-08-10",
    "building_count": 1,
    "site_acres": 37.26,
    "utility": null,
    "reported_power_capacity_mw": 9.8,
    "reported_power_capacity_basis": "JLL reports 4.3 MW installed critical capacity plus 5.5 MW expansion capacity in existing improvements; this is a facility capacity envelope, not metered demand.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 4.3,
    "estimated_power_draw_basis": "Uses JLL's published 4.3 MW installed critical capacity as the best public operating-load proxy. The separate 5.5 MW expansion capacity is retained as facility capacity and is not treated as current draw.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "jll-fannie-mae-tech-center-2026"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "diesel (reported by earlier technical coverage; current official sale materials reviewed here do not enumerate generators)",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Earlier specialist coverage reported six 2 MW generators; current Fannie Mae and JLL materials reviewed for this update do not publish a generator schedule.",
    "ups_technology": "UPS system present by data-center design implication; topology and rating not disclosed in the reviewed owner/broker materials.",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": "Frederick OED describes redundant utility feeds including water; detailed water consumption was not disclosed.",
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "JLL states Fannie Mae is migrating operations to the cloud and intends to divest the Tech Center by year-end 2026; no facility-specific public financing was identified.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $5,680,788 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 37771.2,
    "estimated_annual_electricity_cost_usd": 5680788,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 4.3 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 5680788,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 4.3 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "jll-fannie-mae-tech-center-2026"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "jll-fannie-mae-tech-center-2026"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Frederick OED describes a 220,000-square-foot facility with 90,000 square feet of office space, 60,000 square feet of data-center space, and a 70,000-square-foot MEP facility. JLL lists 245,000 gross square feet, Tier III-equivalent rating, 4.3 MW installed critical capacity, and 5.5 MW expansion capacity.",
    "likely_workflows_detail": "Enterprise mortgage-finance technology operations and disaster-recovery workloads; JLL states Fannie Mae is migrating operations to the cloud before disposition.",
    "hardware_workflow_basis": "Fannie Mae owns and lists the Urbana Technology Center; Frederick OED and JLL describe it as an existing data center.",
    "profile_source_ids": [
      "frederick-oed-data-centers-2026",
      "fannie-mae-contact-urbana-tech-center",
      "jll-fannie-mae-tech-center-2026"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "frederick-oed-data-centers-2026",
      "fannie-mae-contact-urbana-tech-center",
      "jll-fannie-mae-tech-center-2026",
      "census-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Frederick OED and JLL report different gross-area figures. Both are retained in the narrative rather than collapsed into a single asserted area.",
    "power_scale_class": "small",
    "power_scale_label": "Small",
    "power_scale_mw": 4.3,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Uses JLL's published 4.3 MW installed critical capacity as the best public operating-load proxy. The separate 5.5 MW expansion capacity is retained as facility capacity and is not treated as current draw.",
    "power_scale_tag": "Estimated draw: 1 to under 5 MW",
    "power_scale_source_ids": [
      "jll-fannie-mae-tech-center-2026"
    ]
  },
  {
    "id": "ssa-national-support-center-urbana",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Social Security Administration National Support Center",
    "operator": "Social Security Administration",
    "owner": "U.S. General Services Administration",
    "campus": null,
    "status": "operating",
    "year_built": 2014,
    "year_built_status": "documented",
    "year_built_basis": "Public project profiles and 2014 opening coverage identify the facility as newly opened in 2014.",
    "development_status": "operating",
    "permit_status": "operating federal facility; no current local data-center expansion permit identified in the reviewed records",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "no project-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Built 2014",
      "Operating",
      "Federal facility",
      "LEED Gold"
    ],
    "year_built_source_ids": [
      "southland-ssa-national-support-center",
      "som-ssa-national-support-center"
    ],
    "status_source_ids": [
      "frederick-oed-data-centers-2026",
      "southland-ssa-national-support-center"
    ],
    "plan_detail": "Federal Tier III National Support Center replacing the former National Computer Center and supporting core SSA data operations.",
    "permit_detail": "No current facility-specific air-permit or development dispute was identified; this is an established federal facility.",
    "financing_detail": "Federal facility delivered for the U.S. General Services Administration; no local data-center incentive award was identified in the reviewed records.",
    "street_address": "8999 Bennett Creek Boulevard",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21704",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ],
    "latitude": 39.316723,
    "longitude": -77.351526,
    "coordinate_method": "U.S. Census Geocoder street-segment match",
    "coordinate_checked_date": "2026-08-10",
    "building_count": 1,
    "site_acres": 63,
    "utility": null,
    "reported_power_capacity_mw": 10,
    "reported_power_capacity_basis": "Southland reports the facility supports approximately 10 MW of IT server load; this is a published IT-load figure, not metered utility demand.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 10.0,
    "estimated_power_draw_basis": "Uses Southland's published approximately 10 MW IT server-load figure as the best public load proxy. This is not a metered utility-demand value.",
    "estimated_power_draw_confidence": "medium",
    "estimated_power_draw_source_ids": [
      "southland-ssa-national-support-center"
    ],
    "projected_power_demand_mw": null,
    "projected_power_demand_basis": null,
    "projected_power_demand_confidence": null,
    "projected_power_demand_source_ids": [],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "not disclosed in reviewed records",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "Project profiles identify an energy center and resilient federal data-center design but do not disclose a generator count or aggregate generator rating.",
    "ups_technology": "Tier III data-center UPS equivalent expected; topology and rating not disclosed in reviewed records.",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": "Southland reports five independent 100,000-gallon below-grade cooling-tower make-up-water sumps, designed to provide at least three days of cooling-tower make-up water if main water service fails.",
    "employees_current": 80,
    "employees_committed": 80,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "Federal facility delivered for the U.S. General Services Administration; the reviewed records did not isolate a facility-level funding amount.",
    "funding_total_known_usd": null,
    "funding_breakdown": [
      {
        "funder": "U.S. General Services Administration",
        "amount_usd": null,
        "amount_status": "amount not isolated",
        "basis": "Responsible federal owner/delivery agency identified; facility-level funding amount not isolated in reviewed sources.",
        "source_ids": [
          "southland-ssa-national-support-center",
          "som-ssa-national-support-center"
        ]
      }
    ],
    "funding_source_ids": [
      "southland-ssa-national-support-center",
      "som-ssa-national-support-center"
    ],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $13,211,136 (operating planning proxy). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 87840.0,
    "estimated_annual_electricity_cost_usd": 13211136,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 10.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 13211136,
        "amount_status": "operating planning proxy",
        "basis": "Estimated as 10.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "southland-ssa-national-support-center"
        ]
      },
      {
        "label": "Published site personnel",
        "amount_usd": null,
        "amount_status": "80 people; payroll cost not published",
        "basis": "Headcount is carried from the facility profile; wages, benefits, contractors, and operating payroll were not isolated.",
        "source_ids": [
          "frederick-oed-data-centers-2026",
          "southland-ssa-national-support-center",
          "som-ssa-national-support-center"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "southland-ssa-national-support-center"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 0,
    "contestation_label": "none identified",
    "contestation_category": "none identified",
    "contestation_basis": "A renewed search found no credible facility-specific public, regulatory, or legal controversy. Broader jurisdictional policy debates are not attributed to an established facility without site-specific evidence.",
    "contestation_source_ids": [],
    "salient_news_source_ids": [],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Southland describes a 275,000-square-foot Tier III data center with IT white space, office building, access-control center, approximately 10 MW of IT server load, and roughly 80 employees. SOM describes a 285,000-square-foot facility on 63 acres.",
    "likely_workflows_detail": "Federal demographic, wage, earnings, benefits, and payment-support data processing for Social Security Administration operations.",
    "hardware_workflow_basis": "Frederick OED and Southland state the facility maintains earnings, wage, demographic, and benefits information and processes high-volume SSA transactions.",
    "profile_source_ids": [
      "frederick-oed-data-centers-2026",
      "southland-ssa-national-support-center",
      "som-ssa-national-support-center"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "frederick-oed-data-centers-2026",
      "southland-ssa-national-support-center",
      "som-ssa-national-support-center",
      "census-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Frederick OED, Southland, DBIA, and SOM publish slightly different floor-area figures; this record uses Southland's 275,000-square-foot operational profile and retains SOM's 285,000-square-foot figure in the narrative.",
    "power_scale_class": "medium",
    "power_scale_label": "Medium",
    "power_scale_mw": 10.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Uses Southland's published approximately 10 MW IT server-load figure as the best public load proxy. This is not a metered utility-demand value.",
    "power_scale_tag": "Estimated draw: 5 to under 20 MW",
    "power_scale_source_ids": [
      "southland-ssa-national-support-center"
    ]
  },
  {
    "id": "rowan-bauxite-ii-frederick",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Rowan Bauxite II Data Center",
    "operator": "Rowan Digital Infrastructure",
    "owner": "Rowan Digital Infrastructure",
    "campus": "Quantum Frederick",
    "status": "site plan approved / planned",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "site plan approved / planned",
    "permit_status": "Frederick County Planning Commission agenda identified a site-plan decision for SP22-04 / AP SP276740 on December 11, 2024; no facility-specific MDE air permit package was identified in the reviewed records.",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "campus-wide referendum litigation resolved against referendum petitioners; no Bauxite II-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Planning approved",
      "Planned",
      "Quantum Frederick"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "mde-frederick-data-center-hub"
    ],
    "plan_detail": "Frederick County Planning Commission agenda describes Bauxite II Data Center, Quantum Frederick Section 1, Lot 302, as an 822,620-square-foot Critical Digital Infrastructure Facility on a 111.50-acre site south and west of New Design Road and Manor Woods Road.",
    "permit_detail": "Local site-plan decision documented; MDE's Frederick data-center hub lists Rowan Bauxite environmental documents but no Bauxite II air-permit decision in the reviewed index.",
    "financing_detail": "No Bauxite II-specific public financing record was identified in the reviewed records; DCD attributes the project to Rowan at Quantum Frederick.",
    "street_address": "New Design Road and Manor Woods Road",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21703",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ],
    "latitude": 39.331036,
    "longitude": -77.454889,
    "coordinate_method": "U.S. Census Geocoder intersection match for planning-agenda location",
    "coordinate_checked_date": "2026-08-10",
    "building_count": 4,
    "site_acres": 111.5,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": "No Bauxite II-specific power capacity was found in the reviewed official agenda or MDE hub.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 205.7,
    "estimated_power_draw_basis": "Estimated from the Frederick Planning Commission's 822,620-square-foot planned facility area using a 0.25 kW-per-square-foot hyperscale planning proxy. No Bauxite II-specific public MW capacity or metered demand was found.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024"
    ],
    "projected_power_demand_mw": 205.7,
    "projected_power_demand_basis": "Estimated from the Frederick Planning Commission's 822,620-square-foot planned facility area using a 0.25 kW-per-square-foot hyperscale planning proxy. No Bauxite II-specific public MW capacity or metered demand was found.",
    "projected_power_demand_confidence": "low",
    "projected_power_demand_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024"
    ],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "not disclosed in reviewed records",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "No facility-specific backup-generator count or rating was identified in the reviewed Bauxite II records.",
    "ups_technology": "UPS likely for hyperscale data-center design, but topology and rating were not disclosed in the reviewed records.",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No Bauxite II-specific public financing record was identified in the reviewed records; DCD attributes the project to Rowan at Quantum Frederick.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $271,753,068 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 1806868.8,
    "estimated_annual_electricity_cost_usd": 271753068,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 205.7 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 271753068,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 205.7 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "frederick-planning-bauxite-ii-iii-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "frederick-planning-bauxite-ii-iii-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 3,
    "contestation_label": "high",
    "contestation_category": "campus-wide public and legal",
    "contestation_basis": "No Bauxite II-specific litigation was identified, but it is part of the Quantum Frederick campus that generated a 21,000-signature referendum campaign, litigation, and county development restrictions. DCD also notes the applications advanced through a public Planning Commission process.",
    "contestation_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "wypr-frederick-referendum-ruling-2026"
    ],
    "salient_news_source_ids": [
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "wypr-frederick-referendum-ruling-2026"
    ],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Planned 822,620-square-foot critical digital infrastructure facility; DCD reports it as Rowan's second adjacent Bauxite project at Quantum Frederick.",
    "likely_workflows_detail": "Likely hyperscale cloud or AI infrastructure for a large tenant; tenant and hardware inventory not disclosed.",
    "hardware_workflow_basis": "Inferred from Rowan hyperscale campus context and critical digital infrastructure site-plan description.",
    "profile_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "mde-frederick-data-center-hub"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "frederick-oed-data-centers-2026",
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "mde-frederick-data-center-hub",
      "census-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "very-large",
    "power_scale_label": "Very large",
    "power_scale_mw": 205.7,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from the Frederick Planning Commission's 822,620-square-foot planned facility area using a 0.25 kW-per-square-foot hyperscale planning proxy. No Bauxite II-specific public MW capacity or metered demand was found.",
    "power_scale_tag": "Estimated draw: 100 MW or more",
    "power_scale_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024"
    ]
  },
  {
    "id": "rowan-bauxite-iii-frederick",
    "facility_alias_ids": [],
    "record_type": "data_center",
    "technology_tags": [
      "Colocation",
      "Carrier connectivity",
      "Diesel backup generation"
    ],
    "name": "Rowan Bauxite III Data Center",
    "operator": "Rowan Digital Infrastructure",
    "owner": "Rowan Digital Infrastructure",
    "campus": "Quantum Frederick",
    "status": "site plan approved / planned",
    "year_built": null,
    "year_built_status": "unknown",
    "year_built_basis": "No authoritative construction year was identified in the reviewed records.",
    "development_status": "site plan approved / planned",
    "permit_status": "Frederick County Planning Commission agenda identified a site-plan decision for SP22-04 / AP SP276843 on December 11, 2024; MDE lists Bauxite III environmental management and sampling documents.",
    "air_permit_status": "no facility-specific air-permit decision identified in the reviewed records",
    "legal_status": "campus-wide referendum litigation resolved against referendum petitioners; no Bauxite III-specific legal dispute identified in the reviewed records",
    "status_tags": [
      "Year unknown",
      "Planning approved",
      "Planned",
      "Quantum Frederick",
      "Environmental management plan"
    ],
    "year_built_source_ids": [],
    "status_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "mde-frederick-data-center-hub"
    ],
    "plan_detail": "Frederick County Planning Commission agenda describes Bauxite III Data Center, Quantum Frederick Section 1, Lot 102, as a 591,913-square-foot Critical Digital Infrastructure Facility on a 55.08-acre site south and east of Ballenger Creek Pike and Manor Woods Road.",
    "permit_detail": "Local site-plan decision documented. MDE states Bauxite III is the only Rowan Bauxite parcel within the former Eastalco operations boundary and has state-overseen environmental management plans for remediation and redevelopment.",
    "financing_detail": "No Bauxite III-specific public financing record was identified in the reviewed records; DCD attributes the project to Rowan at Quantum Frederick.",
    "street_address": "Ballenger Creek Pike and Manor Woods Road",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21703",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ],
    "latitude": 39.321172,
    "longitude": -77.488391,
    "coordinate_method": "Approximate intersection point from published Bauxite III vicinity descriptions and U.S. Census Geocoder",
    "coordinate_checked_date": "2026-08-10",
    "building_count": 3,
    "site_acres": 55.08,
    "utility": null,
    "reported_power_capacity_mw": null,
    "reported_power_capacity_basis": "No Bauxite III-specific power capacity was found in the reviewed official agenda or MDE hub.",
    "reported_grid_demand_mw": null,
    "reported_annual_energy_mwh": null,
    "reported_pue": null,
    "estimated_power_draw_mw": 148.0,
    "estimated_power_draw_basis": "Estimated from the Frederick Planning Commission's 591,913-square-foot planned facility area using a 0.25 kW-per-square-foot hyperscale planning proxy. No Bauxite III-specific public MW capacity or metered demand was found.",
    "estimated_power_draw_confidence": "low",
    "estimated_power_draw_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024"
    ],
    "projected_power_demand_mw": 148.0,
    "projected_power_demand_basis": "Estimated from the Frederick Planning Commission's 591,913-square-foot planned facility area using a 0.25 kW-per-square-foot hyperscale planning proxy. No Bauxite III-specific public MW capacity or metered demand was found.",
    "projected_power_demand_confidence": "low",
    "projected_power_demand_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024"
    ],
    "on_site_natural_gas_power_plant": "not identified in reviewed records",
    "on_site_generation_capacity_mw": null,
    "on_site_generation_technology": null,
    "backup_generation_fuel": "not disclosed in reviewed records",
    "backup_generator_count": null,
    "backup_generator_capacity_mw": null,
    "backup_generator_detail": "No facility-specific backup-generator count or rating was identified in the reviewed Bauxite III records.",
    "ups_technology": "UPS likely for hyperscale data-center design, but topology and rating were not disclosed in the reviewed records.",
    "ups_capacity_mw": null,
    "ups_energy_mwh": null,
    "cooling_water_detail": null,
    "employees_current": null,
    "employees_committed": null,
    "capital_investment_usd": null,
    "tax_incentive_detail": null,
    "public_funding_detail": null,
    "funding_summary": "No Bauxite III-specific public financing record was identified in the reviewed records; DCD attributes the project to Rowan at Quantum Frederick.",
    "funding_total_known_usd": null,
    "funding_breakdown": [],
    "funding_source_ids": [],
    "operational_finance_summary": "Estimated annual electricity energy-charge proxy is $195,524,813 (if built / fully energized). Facility-specific operating revenue, property-tax payments, demand charges, negotiated utility tariffs, and power-purchase terms were not isolated in reviewed records.",
    "estimated_annual_electricity_use_mwh": 1300032.0,
    "estimated_annual_electricity_cost_usd": 195524813,
    "electricity_cost_rate_cents_per_kwh": 15.04,
    "electricity_cost_basis": "Estimated as 148.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
    "operational_finance_items": [
      {
        "label": "Electricity energy charge proxy",
        "amount_usd": 195524813,
        "amount_status": "if built / fully energized",
        "basis": "Estimated as 148.0 MW average draw multiplied by 8,784 hours in 2024. This is a planning proxy, not metered consumption. Cost applies Maryland's 2024 all-sector average retail electricity price of 15.04\u00a2/kWh. It excludes demand charges, riders, taxes, capacity charges, transmission-service terms, negotiated tariffs, and power-purchase agreements.",
        "source_ids": [
          "eia-retail-sales-md-all-sectors-2024",
          "frederick-planning-bauxite-ii-iii-2024"
        ]
      }
    ],
    "operational_finance_source_ids": [
      "eia-retail-sales-md-all-sectors-2024",
      "frederick-planning-bauxite-ii-iii-2024"
    ],
    "public_opposition_status": "no facility-specific evidence identified",
    "public_sentiment_score": null,
    "public_sentiment_label": "insufficient evidence",
    "sentiment_basis": "No representative facility-specific public sentiment record was identified.",
    "sentiment_source_ids": [],
    "sentiment_assessed_date": "2026-08-09",
    "sentiment_confidence": "insufficient",
    "contestation_score": 3,
    "contestation_label": "high",
    "contestation_category": "campus-wide public, legal, and environmental-management context",
    "contestation_basis": "No Bauxite III-specific litigation was identified, but it is part of the Quantum Frederick campus that generated a 21,000-signature referendum campaign, litigation, and county development restrictions. MDE also identifies Bauxite III as the Rowan parcel within the former Eastalco operations boundary with environmental management plans.",
    "contestation_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "mde-frederick-data-center-hub",
      "wypr-frederick-referendum-ruling-2026"
    ],
    "salient_news_source_ids": [
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "wypr-frederick-referendum-ruling-2026"
    ],
    "contestation_assessed_date": "2026-08-09",
    "hardware_detail": "Planned 591,913-square-foot critical digital infrastructure facility; DCD reports it as Rowan's third adjacent Bauxite project at Quantum Frederick.",
    "likely_workflows_detail": "Likely hyperscale cloud or AI infrastructure for a large tenant; tenant and hardware inventory not disclosed.",
    "hardware_workflow_basis": "Inferred from Rowan hyperscale campus context and critical digital infrastructure site-plan description.",
    "profile_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "mde-frederick-data-center-hub"
    ],
    "last_verified_date": "2026-08-09",
    "source_ids": [
      "frederick-oed-data-centers-2026",
      "frederick-planning-bauxite-ii-iii-2024",
      "dcd-rowan-bauxite-ii-iii-approval-2024",
      "mde-frederick-data-center-hub",
      "census-geocoder"
    ],
    "not_disclosed_fields": [
      "facility grid demand",
      "annual electricity use",
      "PUE",
      "UPS energy duration",
      "current and committed site employment",
      "facility-specific tax benefits",
      "facility-specific funder breakdown",
      "facility-specific operating revenue",
      "facility-specific tax payments",
      "facility-specific power purchase agreement or tariff"
    ],
    "notes": "Building age and total property area do not establish the age or footprint of the data-center installation within the structure.",
    "power_scale_class": "very-large",
    "power_scale_label": "Very large",
    "power_scale_mw": 148.0,
    "power_scale_value_kind": "estimated grid demand",
    "power_scale_detail": "Estimated from the Frederick Planning Commission's 591,913-square-foot planned facility area using a 0.25 kW-per-square-foot hyperscale planning proxy. No Bauxite III-specific public MW capacity or metered demand was found.",
    "power_scale_tag": "Estimated draw: 100 MW or more",
    "power_scale_source_ids": [
      "frederick-planning-bauxite-ii-iii-2024"
    ]
  },
  {
    "id": "eia-67214",
    "record_type": "power_plant",
    "eia_plant_code": 67214,
    "name": "Jade Meadow LLC",
    "operator": "Jade Meadow LLC",
    "street_address": "20100 Klondike Road SW",
    "city": "Midland",
    "county": "Allegany",
    "state": "MD",
    "postal_code": "21542",
    "latitude": 39.598,
    "longitude": -78.951,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 19.8,
    "generator_count": 1,
    "net_generation_mwh": 29063.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 3.318,
    "annual_capacity_factor": 0.1676,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24001",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Allegany County",
      "Midland",
      "Census state 24",
      "Census county 24001",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64502",
    "record_type": "power_plant",
    "eia_plant_code": 64502,
    "name": "7448 Candlewood Road",
    "operator": "Hartz Solar, LLC",
    "street_address": "7448 Candlewood Road",
    "city": "Hanover",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21076",
    "latitude": 39.16,
    "longitude": -76.7,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2254.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 2,
    "longitude_decimal_places": 1,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.257,
    "annual_capacity_factor": 0.1715,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Hanover",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60681",
    "record_type": "power_plant",
    "eia_plant_code": 60681,
    "name": "Annapolis Solar Park, LLC",
    "operator": "Annapolis Solar Park, LLC",
    "street_address": "470 Defense Highway",
    "city": "Annapolis",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21401",
    "latitude": 38.992144,
    "longitude": -76.573773,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 12.0,
    "generator_count": 1,
    "net_generation_mwh": 21567.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 2.462,
    "annual_capacity_factor": 0.2052,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Annapolis",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62407",
    "record_type": "power_plant",
    "eia_plant_code": 62407,
    "name": "Anne Arundel County Public Schools",
    "operator": "Standard Solar",
    "street_address": "9034 Fort Smallwood Rd",
    "city": "Pasadena",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "20841",
    "latitude": 39.13728,
    "longitude": -76.498041,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1797.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2017,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.205,
    "annual_capacity_factor": 0.2051,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Pasadena",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-602",
    "record_type": "power_plant",
    "eia_plant_code": 602,
    "name": "Brandon Shores",
    "operator": "Brandon Shores LLC",
    "street_address": "2030 Brandon Shores Road",
    "city": "Baltimore",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21226",
    "latitude": 39.182073,
    "longitude": -76.537151,
    "primary_technology": "Conventional Steam Coal",
    "technology_tags": [
      "Conventional Steam Coal"
    ],
    "energy_source_codes": [
      "BIT"
    ],
    "nameplate_capacity_mw": 1370.2,
    "generator_count": 2,
    "net_generation_mwh": 2168466.959,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "BIT",
      "DFO",
      "RC"
    ],
    "year_built": 1984,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 247.542,
    "annual_capacity_factor": 0.1807,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Baltimore",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-69088",
    "record_type": "power_plant",
    "eia_plant_code": 69088,
    "name": "Cromwell",
    "operator": "Madison Energy Investments LLC",
    "street_address": "7383 Baltimore Annapolis Boule",
    "city": "Glen Burnie",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21061",
    "latitude": 39.172222,
    "longitude": -76.631944,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.8,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Glen Burnie",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-68335",
    "record_type": "power_plant",
    "eia_plant_code": 68335,
    "name": "Fairhaven",
    "operator": "Baltimore Gas & Electric Co",
    "street_address": "50 Fairhaven Rd",
    "city": "Tracys Landing",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "20779",
    "latitude": 38.7538,
    "longitude": -76.589401,
    "primary_technology": "Batteries",
    "technology_tags": [
      "Batteries"
    ],
    "energy_source_codes": [
      "MWH"
    ],
    "nameplate_capacity_mw": 2.5,
    "generator_count": 1,
    "net_generation_mwh": -128.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "MWH"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Tracys Landing",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1554",
    "record_type": "power_plant",
    "eia_plant_code": 1554,
    "name": "Herbert A Wagner",
    "operator": "H.A. Wagner LLC",
    "street_address": "1000 Brandon Shores Rd",
    "city": "Baltimore",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21226",
    "latitude": 39.1781,
    "longitude": -76.5268,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 922.5,
    "generator_count": 4,
    "net_generation_mwh": 158717.005,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO",
      "NG",
      "BIT",
      "RC",
      "RFO"
    ],
    "year_built": 1956,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 18.118,
    "annual_capacity_factor": 0.0196,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Baltimore",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58246",
    "record_type": "power_plant",
    "eia_plant_code": 58246,
    "name": "Millersville LFG",
    "operator": "LES Operations Services LLC",
    "street_address": "389 Burns Crossing Road",
    "city": "Severn",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "21144",
    "latitude": 39.084722,
    "longitude": -76.676389,
    "primary_technology": "Landfill Gas",
    "technology_tags": [
      "Landfill Gas"
    ],
    "energy_source_codes": [
      "LFG"
    ],
    "nameplate_capacity_mw": 3.2,
    "generator_count": 2,
    "net_generation_mwh": 18415.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "LFG"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 2.102,
    "annual_capacity_factor": 0.6569,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Severn",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64790",
    "record_type": "power_plant",
    "eia_plant_code": 64790,
    "name": "OER Checkerspot",
    "operator": "Standard Solar",
    "street_address": "5963 Franklin Gibson Rd",
    "city": "Tracy's Landing",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "20779",
    "latitude": 38.783572,
    "longitude": -76.574153,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2728.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.311,
    "annual_capacity_factor": 0.2076,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Tracy's Landing",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65358",
    "record_type": "power_plant",
    "eia_plant_code": 65358,
    "name": "OER Patuxent CSG",
    "operator": "Standard Solar",
    "street_address": "4913 Sands Rd",
    "city": "Lothian",
    "county": "Anne Arundel",
    "state": "MD",
    "postal_code": "20711",
    "latitude": 38.838642,
    "longitude": -76.683089,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 4252.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.485,
    "annual_capacity_factor": 0.2427,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24003",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Anne Arundel County",
      "Lothian",
      "Census state 24",
      "Census county 24003",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62876",
    "record_type": "power_plant",
    "eia_plant_code": 62876,
    "name": "Amazon Maryland DCA1",
    "operator": "Westbound Solar LLC",
    "street_address": "1700 Sparrows Point Boulevard",
    "city": "Sparrows Point",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21219",
    "latitude": 39.222576,
    "longitude": -76.469011,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.3,
    "generator_count": 1,
    "net_generation_mwh": 2264.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.258,
    "annual_capacity_factor": 0.1988,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Sparrows Point",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63072",
    "record_type": "power_plant",
    "eia_plant_code": 63072,
    "name": "BTC2 Solar (CSG)",
    "operator": "Nautilus Solar Solutions",
    "street_address": "11956 Philadelphia Road",
    "city": "Kingsville",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21087",
    "latitude": 39.41805,
    "longitude": -76.39772,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3751.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.428,
    "annual_capacity_factor": 0.2141,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Kingsville",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64606",
    "record_type": "power_plant",
    "eia_plant_code": 64606,
    "name": "Burns Solar One LLC",
    "operator": "Nautilus Solar Solutions",
    "street_address": "715 Westminster Pike",
    "city": "Reisterstown",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21136",
    "latitude": 39.47653,
    "longitude": -76.85446,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3852.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.44,
    "annual_capacity_factor": 0.2199,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Reisterstown",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-56571",
    "record_type": "power_plant",
    "eia_plant_code": 56571,
    "name": "Eastern Landfill Gas LLC",
    "operator": "NextEra Renewable Fuels, LLC",
    "street_address": "Days Cove Road",
    "city": "White Marsh",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21162",
    "latitude": 39.389728,
    "longitude": -76.392006,
    "primary_technology": "Landfill Gas",
    "technology_tags": [
      "Landfill Gas"
    ],
    "energy_source_codes": [
      "LFG"
    ],
    "nameplate_capacity_mw": 4.0,
    "generator_count": 4,
    "net_generation_mwh": 25257.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "LFG"
    ],
    "year_built": 2006,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 2.883,
    "annual_capacity_factor": 0.7208,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "White Marsh",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67297",
    "record_type": "power_plant",
    "eia_plant_code": 67297,
    "name": "FFP - MD Foxhall",
    "operator": "FFP MD Freeland Project1, LLC",
    "street_address": "20450 Middletown Road",
    "city": "Freeland",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21053",
    "latitude": 39.683539,
    "longitude": -76.739094,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 4046.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.462,
    "annual_capacity_factor": 0.2309,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Freeland",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59841",
    "record_type": "power_plant",
    "eia_plant_code": 59841,
    "name": "General Motors Corp at White Marsh MD",
    "operator": "Luminace Solar Maryland, LLC",
    "street_address": "10301 Philadelphia Rd",
    "city": "White Marsh",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21162",
    "latitude": 39.3716,
    "longitude": -76.4405,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2011,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "White Marsh",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61465",
    "record_type": "power_plant",
    "eia_plant_code": 61465,
    "name": "IGS Solar I - BWI2",
    "operator": "Madison Energy Holdings LLC",
    "street_address": "2010 Broening Highway",
    "city": "Baltimore",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.267,
    "longitude": -76.548,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.4,
    "generator_count": 1,
    "net_generation_mwh": 2546.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2017,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.291,
    "annual_capacity_factor": 0.2076,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Baltimore",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61358",
    "record_type": "power_plant",
    "eia_plant_code": 61358,
    "name": "IGS Solar I - BWI5",
    "operator": "CleanCapital Holdings",
    "street_address": "5501 Holabird Avenue",
    "city": "Baltimore",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.27,
    "longitude": -76.548,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.1,
    "generator_count": 1,
    "net_generation_mwh": 1990.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 2,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.227,
    "annual_capacity_factor": 0.2065,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Baltimore",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67392",
    "record_type": "power_plant",
    "eia_plant_code": 67392,
    "name": "Lion One",
    "operator": "Nautilus Solar Solutions",
    "street_address": "2320 Ridge Rd",
    "city": "Baltimore",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.3273,
    "longitude": -76.781,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2494.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.285,
    "annual_capacity_factor": 0.1424,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Baltimore",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61185",
    "record_type": "power_plant",
    "eia_plant_code": 61185,
    "name": "Pfeffers",
    "operator": "Terraform Arcadia",
    "street_address": "11121 Pfeffers Rd",
    "city": "Kingsville",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21087",
    "latitude": 39.42757,
    "longitude": -76.393562,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1886.53,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.215,
    "annual_capacity_factor": 0.2154,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Kingsville",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60447",
    "record_type": "power_plant",
    "eia_plant_code": 60447,
    "name": "Presbyterian Senior Living Service",
    "operator": "Terraform Arcadia",
    "street_address": "11630 Glen Arms Road",
    "city": "Glen Arm",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21057",
    "latitude": 39.4476,
    "longitude": -76.516324,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2013,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Glen Arm",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66770",
    "record_type": "power_plant",
    "eia_plant_code": 66770,
    "name": "THD Baltimore DC - 5830 Project Tiger",
    "operator": "Distributed Solar Development, LLC",
    "street_address": "6311 Tradepoint Ave",
    "city": "Edgemere",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21219",
    "latitude": 39.22355,
    "longitude": -76.48349,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.6,
    "generator_count": 1,
    "net_generation_mwh": 1620.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.185,
    "annual_capacity_factor": 0.1156,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Edgemere",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67270",
    "record_type": "power_plant",
    "eia_plant_code": 67270,
    "name": "THD Baltimore DCs - 5829 Project Lion",
    "operator": "Distributed Solar Development, LLC",
    "street_address": "6301 Tradepoint Avenue",
    "city": "Edgemere",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21219",
    "latitude": 39.221979,
    "longitude": -76.483169,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 3.8,
    "generator_count": 1,
    "net_generation_mwh": 3680.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.42,
    "annual_capacity_factor": 0.1106,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Edgemere",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63904",
    "record_type": "power_plant",
    "eia_plant_code": 63904,
    "name": "Timonium Fairgrounds",
    "operator": "Madison Energy Holdings LLC",
    "street_address": "2200 York Road",
    "city": "Timonium",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21093",
    "latitude": 39.447,
    "longitude": -76.63,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.9,
    "generator_count": 1,
    "net_generation_mwh": 2761.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.315,
    "annual_capacity_factor": 0.1659,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Timonium",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63085",
    "record_type": "power_plant",
    "eia_plant_code": 63085,
    "name": "White CSG",
    "operator": "Nautilus Solar Solutions",
    "street_address": "9155 Old Court Road",
    "city": "Baltimore",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21244",
    "latitude": 39.205804,
    "longitude": -76.480453,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2952.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.337,
    "annual_capacity_factor": 0.1685,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Baltimore",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63289",
    "record_type": "power_plant",
    "eia_plant_code": 63289,
    "name": "White Marsh Mall",
    "operator": "White Marsh Mall",
    "street_address": "8200 Perry Hall Blvd",
    "city": "Baltimore",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21236",
    "latitude": 39.37614,
    "longitude": -76.46813,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.1,
    "generator_count": 1,
    "net_generation_mwh": 1042.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.119,
    "annual_capacity_factor": 0.1081,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "Baltimore",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64644",
    "record_type": "power_plant",
    "eia_plant_code": 64644,
    "name": "White Marsh Solar",
    "operator": "Nautilus Solar Solutions",
    "street_address": "10790 Raphel Road",
    "city": "White Marsh",
    "county": "Baltimore",
    "state": "MD",
    "postal_code": "21087",
    "latitude": 39.4167,
    "longitude": -76.403,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2617.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.299,
    "annual_capacity_factor": 0.1992,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24005",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore County",
      "White Marsh",
      "Census state 24",
      "Census county 24005",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59026",
    "record_type": "power_plant",
    "eia_plant_code": 59026,
    "name": "Back River Waste Water Treatment",
    "operator": "Mayor and City Council of Baltimore City",
    "street_address": "8201 Eastern Ave",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.299722,
    "longitude": -76.494167,
    "primary_technology": "Other Waste Biomass",
    "technology_tags": [
      "Other Waste Biomass",
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "OBG",
      "SUN"
    ],
    "nameplate_capacity_mw": 3.0,
    "generator_count": 3,
    "net_generation_mwh": 594.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN",
      "OBG"
    ],
    "year_built": 2009,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating with out-of-service generators",
    "generator_status_codes": [
      "OP",
      "OS"
    ],
    "status_tags": [
      "Operating",
      "Out of service"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.068,
    "annual_capacity_factor": 0.0226,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66536",
    "record_type": "power_plant",
    "eia_plant_code": 66536,
    "name": "CPG - Duke 5300A Holabird",
    "operator": "Solar DG MD Holabird Broening ACC, LLC",
    "street_address": "5003 Holabird Ave",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.270749,
    "longitude": -76.550534,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2412.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.275,
    "annual_capacity_factor": 0.1836,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66537",
    "record_type": "power_plant",
    "eia_plant_code": 66537,
    "name": "CPG - Duke 5300B Holabird",
    "operator": "Solar DG MD Holabird Broening ACC, LLC",
    "street_address": "5003 Holabird Ave",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.270749,
    "longitude": -76.551326,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2395.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.273,
    "annual_capacity_factor": 0.1823,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66538",
    "record_type": "power_plant",
    "eia_plant_code": 66538,
    "name": "CPG - Duke 5900 Holabird",
    "operator": "Solar DG MD Holabird AJCFB, LLC",
    "street_address": "5900 Holabird Ave",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.273131,
    "longitude": -76.545994,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2145.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.245,
    "annual_capacity_factor": 0.1632,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66539",
    "record_type": "power_plant",
    "eia_plant_code": 66539,
    "name": "CPG - Duke 6000 Holabird",
    "operator": "Solar DG MD Holabird AJCFB, LLC",
    "street_address": "6000 Holabird Ave",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21224",
    "latitude": 39.273278,
    "longitude": -76.544434,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2151.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.246,
    "annual_capacity_factor": 0.1637,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-54795",
    "record_type": "power_plant",
    "eia_plant_code": 54795,
    "name": "Domino Sugar Baltimore",
    "operator": "American Sugar Refining, Inc.",
    "street_address": "1100 Key Highway East",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21230",
    "latitude": 39.2744,
    "longitude": -76.5956,
    "primary_technology": "Natural Gas Steam Turbine",
    "technology_tags": [
      "Natural Gas Steam Turbine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 17.5,
    "generator_count": 3,
    "net_generation_mwh": 53956.378,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "RFO"
    ],
    "year_built": 1955,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 6.159,
    "annual_capacity_factor": 0.352,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65324",
    "record_type": "power_plant",
    "eia_plant_code": 65324,
    "name": "Hollins Ferry CSG",
    "operator": "ICFTS MD Solar, LLC",
    "street_address": "4803 Hollins Ferry Road",
    "city": "Halethorpe",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21227",
    "latitude": 39.225752,
    "longitude": -76.68808,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2443.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.279,
    "annual_capacity_factor": 0.1859,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Halethorpe",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-56050",
    "record_type": "power_plant",
    "eia_plant_code": 56050,
    "name": "Inner Harbor East Heating",
    "operator": "Trigen Inner Harbor East, LLC",
    "street_address": "1001 Fleet Street",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21202",
    "latitude": 39.283677,
    "longitude": -76.59941,
    "primary_technology": "Natural Gas Internal Combustion Engine",
    "technology_tags": [
      "Natural Gas Internal Combustion Engine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 2.1,
    "generator_count": 1,
    "net_generation_mwh": null,
    "generation_year": 2024,
    "generation_fuel_codes": [],
    "year_built": 2004,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "standby / backup",
    "generator_status_codes": [
      "SB"
    ],
    "status_tags": [
      "Standby"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": null,
    "annual_capacity_factor": null,
    "planning_output_basis": "No annual net-generation value is available to calculate annual-average planning output.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1557",
    "record_type": "power_plant",
    "eia_plant_code": 1557,
    "name": "Philadelphia",
    "operator": "Constellation Power Source Generation, LLC",
    "street_address": "3914 Pulaski Highway",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21205",
    "latitude": 39.2986,
    "longitude": -76.5636,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 82.8,
    "generator_count": 4,
    "net_generation_mwh": 4940.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO"
    ],
    "year_built": 1970,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.564,
    "annual_capacity_factor": 0.0068,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-10629",
    "record_type": "power_plant",
    "eia_plant_code": 10629,
    "name": "Wheelabrator Baltimore Refuse",
    "operator": "Wheelabrator Environmental Systems",
    "street_address": "1801 Annapolis Rd",
    "city": "Baltimore",
    "county": "Baltimore City",
    "state": "MD",
    "postal_code": "21230",
    "latitude": 39.266041,
    "longitude": -76.629653,
    "primary_technology": "Municipal Solid Waste",
    "technology_tags": [
      "Municipal Solid Waste"
    ],
    "energy_source_codes": [
      "MSW"
    ],
    "nameplate_capacity_mw": 64.5,
    "generator_count": 2,
    "net_generation_mwh": 317574.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "MSN",
      "MSB"
    ],
    "year_built": 1984,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 36.253,
    "annual_capacity_factor": 0.5621,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24510",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Baltimore City",
      "Baltimore",
      "Census state 24",
      "Census county 24510",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-6011",
    "record_type": "power_plant",
    "eia_plant_code": 6011,
    "name": "Calvert Cliffs Nuclear Power Plant",
    "operator": "Constellation Nuclear",
    "street_address": "1650 Calvert Cliffs Parkway",
    "city": "Lusby",
    "county": "Calvert",
    "state": "MD",
    "postal_code": "20657",
    "latitude": 38.4344,
    "longitude": -76.4417,
    "primary_technology": "Nuclear",
    "technology_tags": [
      "Nuclear"
    ],
    "energy_source_codes": [
      "NUC"
    ],
    "nameplate_capacity_mw": 1850.4,
    "generator_count": 2,
    "net_generation_mwh": 14724068.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NUC"
    ],
    "year_built": 1975,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "Operating under renewed facility operating licenses (DPR-53 for Unit 1, DPR-69 for Unit 2) with active NRC amendments as of 2024-2025",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final",
      "kimi-u-s-nuclear-regulatory-commission-ead70a6fe8",
      "kimi-u-s-nuclear-regulatory-commission-e85d9490c4",
      "kimi-u-s-nuclear-regulatory-commission-76a184ad58"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 1680.83,
    "annual_capacity_factor": 0.9084,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24009",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Calvert County",
      "Lusby",
      "Census state 24",
      "Census county 24009",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66499",
    "record_type": "power_plant",
    "eia_plant_code": 66499,
    "name": "Federalsburg Energy Storage 1 LLC",
    "operator": "Convergent Energy and Power LP",
    "street_address": "6435 Reliance Road",
    "city": "Federaslburg",
    "county": "Caroline",
    "state": "MD",
    "postal_code": "21632",
    "latitude": 38.64022,
    "longitude": -75.711068,
    "primary_technology": "Batteries",
    "technology_tags": [
      "Batteries",
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "MWH",
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 2,
    "net_generation_mwh": 1299.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN",
      "MWH"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.148,
    "annual_capacity_factor": 0.0741,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24011",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Caroline County",
      "Federaslburg",
      "Census state 24",
      "Census county 24011",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65281",
    "record_type": "power_plant",
    "eia_plant_code": 65281,
    "name": "Bomber CSG",
    "operator": "Hampstead Solar, LLC",
    "street_address": "630 Hanover Pike",
    "city": "Hampstead",
    "county": "Carroll",
    "state": "MD",
    "postal_code": "21074",
    "latitude": 39.59902,
    "longitude": -76.8526,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 6.0,
    "generator_count": 1,
    "net_generation_mwh": 9238.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 1.055,
    "annual_capacity_factor": 0.1758,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24013",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Carroll County",
      "Hampstead",
      "Census state 24",
      "Census county 24013",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65359",
    "record_type": "power_plant",
    "eia_plant_code": 65359,
    "name": "Shepherds Mill CSG",
    "operator": "Standard Solar",
    "street_address": "303 Shepherds Mill Rd",
    "city": "Union Bridge",
    "county": "Carroll",
    "state": "MD",
    "postal_code": "21791",
    "latitude": 39.562305,
    "longitude": -77.161771,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3291.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.376,
    "annual_capacity_factor": 0.1878,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24013",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Carroll County",
      "Union Bridge",
      "Census state 24",
      "Census county 24013",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67145",
    "record_type": "power_plant",
    "eia_plant_code": 67145,
    "name": "Union Bridge Solar",
    "operator": "Citizens Enterprises Corporation",
    "street_address": "536 green Valley Road",
    "city": "Union Bridge",
    "county": "Carroll",
    "state": "MD",
    "postal_code": "21791",
    "latitude": 39.563,
    "longitude": -77.183,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 8.2,
    "generator_count": 1,
    "net_generation_mwh": 12289.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 1.403,
    "annual_capacity_factor": 0.1711,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24013",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Carroll County",
      "Union Bridge",
      "Census state 24",
      "Census county 24013",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60353",
    "record_type": "power_plant",
    "eia_plant_code": 60353,
    "name": "Cecil County CCVT HS",
    "operator": "SunE DB42, LLC",
    "street_address": "912 Appleton Rd",
    "city": "Elkton",
    "county": "Cecil",
    "state": "MD",
    "postal_code": "21921",
    "latitude": 39.651002,
    "longitude": -75.808331,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3425.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.391,
    "annual_capacity_factor": 0.1955,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24015",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Cecil County",
      "Elkton",
      "Census state 24",
      "Census county 24015",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60089",
    "record_type": "power_plant",
    "eia_plant_code": 60089,
    "name": "Elkton Solar",
    "operator": "SunE DB27, LLC",
    "street_address": "205 W. Pulaski Highway",
    "city": "Elkton",
    "county": "Cecil",
    "state": "MD",
    "postal_code": "21921",
    "latitude": 39.603531,
    "longitude": -75.836235,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.6,
    "generator_count": 1,
    "net_generation_mwh": 2562.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.292,
    "annual_capacity_factor": 0.1828,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24015",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Cecil County",
      "Elkton",
      "Census state 24",
      "Census county 24015",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-7835",
    "record_type": "power_plant",
    "eia_plant_code": 7835,
    "name": "Essential Power Rock Springs LLC",
    "operator": "Essential Power Operating Services LLC",
    "street_address": "1423 Rising Sun Road",
    "city": "Rising Sun",
    "county": "Cecil",
    "state": "MD",
    "postal_code": "21911",
    "latitude": 39.71901,
    "longitude": -76.15976,
    "primary_technology": "Natural Gas Fired Combustion Turbine",
    "technology_tags": [
      "Natural Gas Fired Combustion Turbine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 795.6,
    "generator_count": 4,
    "net_generation_mwh": 178967.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG"
    ],
    "year_built": 2003,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 20.43,
    "annual_capacity_factor": 0.0257,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24015",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Cecil County",
      "Rising Sun",
      "Census state 24",
      "Census county 24015",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58014",
    "record_type": "power_plant",
    "eia_plant_code": 58014,
    "name": "IKEA Perryville 460",
    "operator": "IKEA Property Inc",
    "street_address": "100 IKEA Way",
    "city": "Perryville",
    "county": "Cecil",
    "state": "MD",
    "postal_code": "21903",
    "latitude": 39.560833,
    "longitude": -76.055278,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.1,
    "generator_count": 1,
    "net_generation_mwh": 3233.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2013,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.369,
    "annual_capacity_factor": 0.1757,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24015",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Cecil County",
      "Perryville",
      "Census state 24",
      "Census county 24015",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64645",
    "record_type": "power_plant",
    "eia_plant_code": 64645,
    "name": "Mason Solar One LLC",
    "operator": "Nautilus Solar Solutions",
    "street_address": "3300 Telegraph Road",
    "city": "Elkton",
    "county": "Cecil",
    "state": "MD",
    "postal_code": "21921",
    "latitude": 39.69196,
    "longitude": -75.91848,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1836.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.21,
    "annual_capacity_factor": 0.2096,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24015",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Cecil County",
      "Elkton",
      "Census state 24",
      "Census county 24015",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67397",
    "record_type": "power_plant",
    "eia_plant_code": 67397,
    "name": "Meeting House",
    "operator": "Nautilus Solar Solutions",
    "street_address": "2745 Telegraph Rd",
    "city": "North East",
    "county": "Cecil",
    "state": "MD",
    "postal_code": "21901",
    "latitude": 39.70381,
    "longitude": -75.94323,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3908.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.446,
    "annual_capacity_factor": 0.2231,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24015",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Cecil County",
      "North East",
      "Census state 24",
      "Census county 24015",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59220",
    "record_type": "power_plant",
    "eia_plant_code": 59220,
    "name": "Wildcat Point Generation Facility",
    "operator": "Old Dominion Electric Coop",
    "street_address": "179 Old Mill Road",
    "city": "Conowingo",
    "county": "Cecil",
    "state": "MD",
    "postal_code": "21918",
    "latitude": 39.719364,
    "longitude": -76.161625,
    "primary_technology": "Natural Gas Fired Combined Cycle",
    "technology_tags": [
      "Natural Gas Fired Combined Cycle"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 1113.6,
    "generator_count": 3,
    "net_generation_mwh": 2968185.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 338.834,
    "annual_capacity_factor": 0.3043,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24015",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Cecil County",
      "Conowingo",
      "Census state 24",
      "Census county 24015",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-56846",
    "record_type": "power_plant",
    "eia_plant_code": 56846,
    "name": "CPV St Charles Energy Center",
    "operator": "CPV Maryland LLC",
    "street_address": "5025 Thomas Edison Drive",
    "city": "Waldorf",
    "county": "Charles",
    "state": "MD",
    "postal_code": "20602",
    "latitude": 38.5686,
    "longitude": -76.8919,
    "primary_technology": "Natural Gas Fired Combined Cycle",
    "technology_tags": [
      "Natural Gas Fired Combined Cycle"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 775.3,
    "generator_count": 3,
    "net_generation_mwh": 3628467.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG"
    ],
    "year_built": 2017,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 414.209,
    "annual_capacity_factor": 0.5343,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24017",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Charles County",
      "Waldorf",
      "Census state 24",
      "Census county 24017",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58463",
    "record_type": "power_plant",
    "eia_plant_code": 58463,
    "name": "Herbert Farm Solar",
    "operator": "SMECO Solar LLC",
    "street_address": "7761 Leonardtown Rd",
    "city": "Hughesville",
    "county": "Charles",
    "state": "MD",
    "postal_code": "20637",
    "latitude": 38.545556,
    "longitude": -76.799444,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 5.5,
    "generator_count": 1,
    "net_generation_mwh": 7320.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.836,
    "annual_capacity_factor": 0.1519,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24017",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Charles County",
      "Hughesville",
      "Census state 24",
      "Census county 24017",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1573",
    "record_type": "power_plant",
    "eia_plant_code": 1573,
    "name": "Morgantown Generating Plant",
    "operator": "Lanyard Power Holdings, LLC",
    "street_address": "12620 Crain Highway",
    "city": "Newburg",
    "county": "Charles",
    "state": "MD",
    "postal_code": "20664",
    "latitude": 38.3592,
    "longitude": -76.9767,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 130.0,
    "generator_count": 2,
    "net_generation_mwh": 905.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO",
      "BIT"
    ],
    "year_built": 1973,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.103,
    "annual_capacity_factor": 0.0008,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24017",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Charles County",
      "Newburg",
      "Census state 24",
      "Census county 24017",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66203",
    "record_type": "power_plant",
    "eia_plant_code": 66203,
    "name": "Ripley",
    "operator": "MN8 Energy LLC",
    "street_address": "Ripley Road",
    "city": "La Plata",
    "county": "Charles",
    "state": "MD",
    "postal_code": "20646",
    "latitude": 38.535,
    "longitude": -77.097,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 27.5,
    "generator_count": 1,
    "net_generation_mwh": 51880.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 5.922,
    "annual_capacity_factor": 0.2154,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24017",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Charles County",
      "La Plata",
      "Census state 24",
      "Census county 24017",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59811",
    "record_type": "power_plant",
    "eia_plant_code": 59811,
    "name": "Rockfish Solar LLC",
    "operator": "Rockfish Solar LLC",
    "street_address": "4370 Renner Road",
    "city": "Waldorf",
    "county": "Charles",
    "state": "MD",
    "postal_code": "20602",
    "latitude": 38.591545,
    "longitude": -76.87486,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 10.3,
    "generator_count": 1,
    "net_generation_mwh": 14170.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 1.618,
    "annual_capacity_factor": 0.157,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24017",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Charles County",
      "Waldorf",
      "Census state 24",
      "Census county 24017",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59842",
    "record_type": "power_plant",
    "eia_plant_code": 59842,
    "name": "CNE at Cambridge MD",
    "operator": "Luminace Solar Maryland II, LLC",
    "street_address": "4919 Bucktown Road",
    "city": "Cambridge",
    "county": "Dorchester",
    "state": "MD",
    "postal_code": "21613",
    "latitude": 38.5158,
    "longitude": -76.0192,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 3.2,
    "generator_count": 1,
    "net_generation_mwh": 5516.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.63,
    "annual_capacity_factor": 0.1968,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24019",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Dorchester County",
      "Cambridge",
      "Census state 24",
      "Census county 24019",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67399",
    "record_type": "power_plant",
    "eia_plant_code": 67399,
    "name": "Mustang One",
    "operator": "Nautilus Solar Solutions",
    "street_address": "2237 Hudson Rd",
    "city": "Cambridge",
    "county": "Dorchester",
    "state": "MD",
    "postal_code": "21613",
    "latitude": 38.56654,
    "longitude": -76.10953,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2952.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.337,
    "annual_capacity_factor": 0.2247,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24019",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Dorchester County",
      "Cambridge",
      "Census state 24",
      "Census county 24019",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64690",
    "record_type": "power_plant",
    "eia_plant_code": 64690,
    "name": "Todd Solar",
    "operator": "Invenergy Services LLC",
    "street_address": "6102 Palmer Mill Road",
    "city": "Hurlock",
    "county": "Dorchester",
    "state": "MD",
    "postal_code": "21643",
    "latitude": 38.613328,
    "longitude": -75.835207,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 20.0,
    "generator_count": 1,
    "net_generation_mwh": 33921.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 3.872,
    "annual_capacity_factor": 0.1936,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24019",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Dorchester County",
      "Hurlock",
      "Census state 24",
      "Census county 24019",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62405",
    "record_type": "power_plant",
    "eia_plant_code": 62405,
    "name": "UMCES Ground Mount",
    "operator": "Standard Solar",
    "street_address": "2020 Horns Point Rd",
    "city": "Cambridge",
    "county": "Dorchester",
    "state": "MD",
    "postal_code": "21613",
    "latitude": 38.583064,
    "longitude": -76.13475,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3451.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.394,
    "annual_capacity_factor": 0.197,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24019",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Dorchester County",
      "Cambridge",
      "Census state 24",
      "Census county 24019",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1564",
    "record_type": "power_plant",
    "eia_plant_code": 1564,
    "name": "Vienna Operations",
    "operator": "NRG Vienna Operations Inc",
    "street_address": "Chapel of Ease Road",
    "city": "Vienna",
    "county": "Dorchester",
    "state": "MD",
    "postal_code": "21869",
    "latitude": 38.4878,
    "longitude": -75.8208,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO",
      "RFO"
    ],
    "nameplate_capacity_mw": 180.6,
    "generator_count": 2,
    "net_generation_mwh": 4559.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "RFO",
      "DFO"
    ],
    "year_built": 1968,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.52,
    "annual_capacity_factor": 0.0029,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24019",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Dorchester County",
      "Vienna",
      "Census state 24",
      "Census county 24019",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61519",
    "record_type": "power_plant",
    "eia_plant_code": 61519,
    "name": "Baker Point",
    "operator": "Cypress Creek Renewables",
    "street_address": "12303 Old Frederick Road",
    "city": "Thurmont",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21788",
    "latitude": 39.570338,
    "longitude": -77.363415,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 9.0,
    "generator_count": 1,
    "net_generation_mwh": 13341.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 1.523,
    "annual_capacity_factor": 0.1692,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Thurmont",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66867",
    "record_type": "power_plant",
    "eia_plant_code": 66867,
    "name": "Cannonball Solar (CSG)",
    "operator": "AES Clean Energy",
    "street_address": "11533 Hessong Bridge Road",
    "city": "Thurmont",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21788",
    "latitude": 39.5463,
    "longitude": -77.4164,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 1464.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.167,
    "annual_capacity_factor": 0.0836,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Thurmont",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60849",
    "record_type": "power_plant",
    "eia_plant_code": 60849,
    "name": "Emmitsburg Solar Arrays",
    "operator": "UGI Energy Services, LLC",
    "street_address": "16707 Creamery Road",
    "city": "Emmitsburg",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21727",
    "latitude": 39.69373,
    "longitude": -77.314427,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.7,
    "generator_count": 1,
    "net_generation_mwh": 2545.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2014,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.291,
    "annual_capacity_factor": 0.1709,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Emmitsburg",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61552",
    "record_type": "power_plant",
    "eia_plant_code": 61552,
    "name": "Fort Detrick Solar PV",
    "operator": "Montevue Lane Solar, LLC",
    "street_address": "Fort Detrick USAG Area B , Mon",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21702",
    "latitude": 39.44,
    "longitude": -77.45,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic",
      "Batteries"
    ],
    "energy_source_codes": [
      "MWH",
      "SUN"
    ],
    "nameplate_capacity_mw": 21.7,
    "generator_count": 2,
    "net_generation_mwh": 20558.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN",
      "MWH"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 2,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 2.347,
    "annual_capacity_factor": 0.1081,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63253",
    "record_type": "power_plant",
    "eia_plant_code": 63253,
    "name": "Francis Scott Key Mall",
    "operator": "Francis Scott Key Mall",
    "street_address": "5500 Buckeystown Pike",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21703",
    "latitude": 39.38588,
    "longitude": -77.40947,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.6,
    "generator_count": 1,
    "net_generation_mwh": 1343.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.153,
    "annual_capacity_factor": 0.0958,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63496",
    "record_type": "power_plant",
    "eia_plant_code": 63496,
    "name": "Frederick County - Landfill",
    "operator": "Tesla Inc.",
    "street_address": "9031 Reichs Ford Rd",
    "city": "Frederick",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21704",
    "latitude": 39.373263,
    "longitude": -77.34985,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2257.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.258,
    "annual_capacity_factor": 0.1288,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Frederick",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-57758",
    "record_type": "power_plant",
    "eia_plant_code": 57758,
    "name": "Mount Saint Mary's",
    "operator": "Constellation Solar Horizons LLC",
    "street_address": "16300 Old Emmitsburg Road",
    "city": "Emmitsburg",
    "county": "Frederick",
    "state": "MD",
    "postal_code": "21727",
    "latitude": 39.675,
    "longitude": -77.345,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 13.7,
    "generator_count": 1,
    "net_generation_mwh": 17870.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 2.04,
    "annual_capacity_factor": 0.1489,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24021",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Frederick County",
      "Emmitsburg",
      "Census state 24",
      "Census county 24021",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-57300",
    "record_type": "power_plant",
    "eia_plant_code": 57300,
    "name": "Criterion",
    "operator": "Criterion Power Partners LLC",
    "street_address": "1295 Eagle Rock Road",
    "city": "Oakland",
    "county": "GARRETT",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.4047,
    "longitude": -79.29,
    "primary_technology": "Onshore Wind Turbine",
    "technology_tags": [
      "Onshore Wind Turbine"
    ],
    "energy_source_codes": [
      "WND"
    ],
    "nameplate_capacity_mw": 70.0,
    "generator_count": 1,
    "net_generation_mwh": 242319.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "WND"
    ],
    "year_built": 2010,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 27.662,
    "annual_capacity_factor": 0.3952,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "GARRETT County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1567",
    "record_type": "power_plant",
    "eia_plant_code": 1567,
    "name": "Deep Creek",
    "operator": "BP Piney & Deep Creek LLC",
    "street_address": "14 River View Terrace",
    "city": "Oakland",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.523,
    "longitude": -79.413,
    "primary_technology": "Conventional Hydroelectric",
    "technology_tags": [
      "Conventional Hydroelectric"
    ],
    "energy_source_codes": [
      "WAT"
    ],
    "nameplate_capacity_mw": 20.0,
    "generator_count": 2,
    "net_generation_mwh": 17053.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "WAT"
    ],
    "year_built": 1925,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 1.947,
    "annual_capacity_factor": 0.0973,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59147",
    "record_type": "power_plant",
    "eia_plant_code": 59147,
    "name": "Fair Wind",
    "operator": "Fair Wind Power Partners, LLC",
    "street_address": "1295 Eagle Rock Road",
    "city": "Oakland",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.404564,
    "longitude": -79.291143,
    "primary_technology": "Onshore Wind Turbine",
    "technology_tags": [
      "Onshore Wind Turbine"
    ],
    "energy_source_codes": [
      "WND"
    ],
    "nameplate_capacity_mw": 30.0,
    "generator_count": 1,
    "net_generation_mwh": 83710.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "WND"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 9.556,
    "annual_capacity_factor": 0.3185,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58904",
    "record_type": "power_plant",
    "eia_plant_code": 58904,
    "name": "Fourmile Ridge",
    "operator": "Fourmile Wind Energy, LLC",
    "street_address": "853 St John's Rock Rd.",
    "city": "Frostburg",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21532",
    "latitude": 39.641111,
    "longitude": -79.011111,
    "primary_technology": "Onshore Wind Turbine",
    "technology_tags": [
      "Onshore Wind Turbine"
    ],
    "energy_source_codes": [
      "WND"
    ],
    "nameplate_capacity_mw": 40.0,
    "generator_count": 1,
    "net_generation_mwh": 113077.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "WND"
    ],
    "year_built": 2014,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 12.908,
    "annual_capacity_factor": 0.3227,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Frostburg",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60847",
    "record_type": "power_plant",
    "eia_plant_code": 60847,
    "name": "Garrett County - DPU Treatment Plant",
    "operator": "Tesla Inc.",
    "street_address": "762 Mayhew Inn Rd",
    "city": "Oakland",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.505187,
    "longitude": -79.392991,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.2,
    "generator_count": 1,
    "net_generation_mwh": 1713.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2017,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.196,
    "annual_capacity_factor": 0.163,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65339",
    "record_type": "power_plant",
    "eia_plant_code": 65339,
    "name": "MD - CS - Potomac Edison Co - GA25 TPE (",
    "operator": "Distributed Solar Development, LLC",
    "street_address": "1567 Aiken Miller Road",
    "city": "Accident",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21520",
    "latitude": 39.608072,
    "longitude": -79.32824,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3571.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.408,
    "annual_capacity_factor": 0.2038,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Accident",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64180",
    "record_type": "power_plant",
    "eia_plant_code": 64180,
    "name": "MD - CS - Potomac Edison Co - GA29 TPE",
    "operator": "Forefront Power, LLC",
    "street_address": "2415 Friendsville Road",
    "city": "Friendsville",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21531",
    "latitude": 39.59535,
    "longitude": -79.387898,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3790.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.433,
    "annual_capacity_factor": 0.2163,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Friendsville",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-68779",
    "record_type": "power_plant",
    "eia_plant_code": 68779,
    "name": "MD CDG 001",
    "operator": "MD CDG 001 LLC",
    "street_address": "844 Jasper Riley Road",
    "city": "Oakland",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.373488,
    "longitude": -79.397636,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-68780",
    "record_type": "power_plant",
    "eia_plant_code": 68780,
    "name": "MD CDG 002",
    "operator": "MD CDG 002 LLC",
    "street_address": "184 Jasper Riley Road",
    "city": "Oakland",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.375049,
    "longitude": -79.403994,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-57240",
    "record_type": "power_plant",
    "eia_plant_code": 57240,
    "name": "Roth Rock North Wind Farm, LLC",
    "operator": "Roth Rock Wind Farm LLC",
    "street_address": "AP-Substation 2325 Wind Pk Wy",
    "city": "Oakland",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.287222,
    "longitude": -79.434444,
    "primary_technology": "Onshore Wind Turbine",
    "technology_tags": [
      "Onshore Wind Turbine"
    ],
    "energy_source_codes": [
      "WND"
    ],
    "nameplate_capacity_mw": 10.0,
    "generator_count": 1,
    "net_generation_mwh": 23843.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "WND"
    ],
    "year_built": 2011,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 2.722,
    "annual_capacity_factor": 0.2722,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-57239",
    "record_type": "power_plant",
    "eia_plant_code": 57239,
    "name": "Roth Rock Wind Farm LLC",
    "operator": "Roth Rock Wind Farm LLC",
    "street_address": "2860 Wind Park Way",
    "city": "Oakland",
    "county": "Garrett",
    "state": "MD",
    "postal_code": "21550",
    "latitude": 39.254444,
    "longitude": -79.467222,
    "primary_technology": "Onshore Wind Turbine",
    "technology_tags": [
      "Onshore Wind Turbine"
    ],
    "energy_source_codes": [
      "WND"
    ],
    "nameplate_capacity_mw": 40.0,
    "generator_count": 1,
    "net_generation_mwh": 95371.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "WND"
    ],
    "year_built": 2011,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 10.887,
    "annual_capacity_factor": 0.2722,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24023",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Garrett County",
      "Oakland",
      "Census state 24",
      "Census county 24023",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61282",
    "record_type": "power_plant",
    "eia_plant_code": 61282,
    "name": "APG Combined Heat and Power Plant",
    "operator": "US Dept of Army, Garrison, APG",
    "street_address": "2100 Bush River Road, Aberdeen",
    "city": "Edgewood",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21010",
    "latitude": 39.3975,
    "longitude": -76.2991,
    "primary_technology": "Natural Gas Fired Combustion Turbine",
    "technology_tags": [
      "Natural Gas Fired Combustion Turbine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 7.9,
    "generator_count": 1,
    "net_generation_mwh": 53000.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 6.05,
    "annual_capacity_factor": 0.7659,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Edgewood",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62629",
    "record_type": "power_plant",
    "eia_plant_code": 62629,
    "name": "APG New Chesapeake",
    "operator": "Onyx Asset Services Group",
    "street_address": "McCloskey Road",
    "city": "Aberdeen",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21005",
    "latitude": 39.493704,
    "longitude": -76.146701,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.3,
    "generator_count": 1,
    "net_generation_mwh": 4086.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.466,
    "annual_capacity_factor": 0.2028,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Aberdeen",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62628",
    "record_type": "power_plant",
    "eia_plant_code": 62628,
    "name": "APG Old Bayside",
    "operator": "Onyx Asset Services Group",
    "street_address": "Garden Drive",
    "city": "Aberdeen",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21005",
    "latitude": 39.498961,
    "longitude": -76.146055,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.7,
    "generator_count": 1,
    "net_generation_mwh": 2964.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.338,
    "annual_capacity_factor": 0.199,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Aberdeen",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60662",
    "record_type": "power_plant",
    "eia_plant_code": 60662,
    "name": "Archdiocese of Baltimore J",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.445,
    "longitude": -76.217,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3261.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.372,
    "annual_capacity_factor": 0.1861,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60663",
    "record_type": "power_plant",
    "eia_plant_code": 60663,
    "name": "Archdiocese of Baltimore L",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.445,
    "longitude": -76.217,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3270.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.373,
    "annual_capacity_factor": 0.1866,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60664",
    "record_type": "power_plant",
    "eia_plant_code": 60664,
    "name": "Baltimore City B",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.436,
    "longitude": -76.22,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2017.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 7 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 7,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.23,
    "annual_capacity_factor": 0.1151,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60665",
    "record_type": "power_plant",
    "eia_plant_code": 60665,
    "name": "Baltimore City D",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.436,
    "longitude": -76.22,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3065.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 7 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 7,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.35,
    "annual_capacity_factor": 0.1749,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60666",
    "record_type": "power_plant",
    "eia_plant_code": 60666,
    "name": "Baltimore City F",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.436,
    "longitude": -76.22,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3052.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 7 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 7,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.348,
    "annual_capacity_factor": 0.1742,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60667",
    "record_type": "power_plant",
    "eia_plant_code": 60667,
    "name": "Baltimore City G",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.436,
    "longitude": -76.22,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2937.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 7 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 7,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.335,
    "annual_capacity_factor": 0.1676,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60668",
    "record_type": "power_plant",
    "eia_plant_code": 60668,
    "name": "City of Havre De Grace C",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.436,
    "longitude": -76.22,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3324.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 7 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 7,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.379,
    "annual_capacity_factor": 0.1897,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1574",
    "record_type": "power_plant",
    "eia_plant_code": 1574,
    "name": "Conowingo",
    "operator": "Constellation Power, Inc",
    "street_address": "2569 Shures Landing Rd.",
    "city": "Darlington",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21034",
    "latitude": 39.6572,
    "longitude": -76.1752,
    "primary_technology": "Conventional Hydroelectric",
    "technology_tags": [
      "Conventional Hydroelectric"
    ],
    "energy_source_codes": [
      "WAT"
    ],
    "nameplate_capacity_mw": 530.8,
    "generator_count": 11,
    "net_generation_mwh": 1831180.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "WAT"
    ],
    "year_built": 1928,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 209.039,
    "annual_capacity_factor": 0.3938,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Darlington",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-68262",
    "record_type": "power_plant",
    "eia_plant_code": 68262,
    "name": "Fairview Farms",
    "operator": "Madison Energy Investments LLC",
    "street_address": "2000 Calvary Rd",
    "city": "Bel Air",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21015",
    "latitude": 39.516944,
    "longitude": -76.273611,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 30.0,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Bel Air",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60708",
    "record_type": "power_plant",
    "eia_plant_code": 60708,
    "name": "Havre de Grace II - E at Perryman",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.436,
    "longitude": -76.22,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.4,
    "generator_count": 1,
    "net_generation_mwh": 1916.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 7 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 7,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.219,
    "annual_capacity_factor": 0.1562,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62323",
    "record_type": "power_plant",
    "eia_plant_code": 62323,
    "name": "Macy's MD Joppa Solar Project",
    "operator": "Northstar Macy's Maryland 2015, LLC",
    "street_address": "3300 Fashion Way",
    "city": "Joppa",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21085",
    "latitude": 39.44752,
    "longitude": -76.32095,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.8,
    "generator_count": 1,
    "net_generation_mwh": 221.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.025,
    "annual_capacity_factor": 0.014,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Joppa",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-57646",
    "record_type": "power_plant",
    "eia_plant_code": 57646,
    "name": "McCormick & Co. Inc. at Belcamp",
    "operator": "Luminace Solar Maryland, LLC",
    "street_address": "4607 McCormick Dr.",
    "city": "Belcamp",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21017",
    "latitude": 39.4836,
    "longitude": -76.2292,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.4,
    "generator_count": 1,
    "net_generation_mwh": 2249.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2010,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.257,
    "annual_capacity_factor": 0.1834,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Belcamp",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1556",
    "record_type": "power_plant",
    "eia_plant_code": 1556,
    "name": "Perryman",
    "operator": "Constellation Power Source Generation, LLC",
    "street_address": "Bush River Neck Rd",
    "city": "Harford County",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.442836,
    "longitude": -76.221761,
    "primary_technology": "Natural Gas Fired Combustion Turbine",
    "technology_tags": [
      "Natural Gas Fired Combustion Turbine",
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO",
      "NG"
    ],
    "nameplate_capacity_mw": 492.3,
    "generator_count": 5,
    "net_generation_mwh": 152386.001,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO"
    ],
    "year_built": 1972,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 17.396,
    "annual_capacity_factor": 0.0353,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60669",
    "record_type": "power_plant",
    "eia_plant_code": 60669,
    "name": "Sod Run WTP A",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "800 Chelsea Road",
    "city": "Perryman",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21130",
    "latitude": 39.436,
    "longitude": -76.22,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3277.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 7 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 7,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.374,
    "annual_capacity_factor": 0.187,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Perryman",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60461",
    "record_type": "power_plant",
    "eia_plant_code": 60461,
    "name": "The Clorox Company",
    "operator": "Tesla Inc.",
    "street_address": "1467 Perryman Rd",
    "city": "Aberdeen",
    "county": "Harford",
    "state": "MD",
    "postal_code": "21001",
    "latitude": 39.472128,
    "longitude": -76.201342,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.6,
    "generator_count": 1,
    "net_generation_mwh": 2415.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.276,
    "annual_capacity_factor": 0.1723,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24025",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Harford County",
      "Aberdeen",
      "Census state 24",
      "Census county 24025",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64343",
    "record_type": "power_plant",
    "eia_plant_code": 64343,
    "name": "6685 Santa Barbara Ct",
    "operator": "6685 Santa Barbara Ct",
    "street_address": "6685 Santa Barbara Ct",
    "city": "Elkridge",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21075",
    "latitude": 39.189589,
    "longitude": -76.743011,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1624.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.185,
    "annual_capacity_factor": 0.1854,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Elkridge",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58252",
    "record_type": "power_plant",
    "eia_plant_code": 58252,
    "name": "Alpha Ridge LFG",
    "operator": "Howard County - Maryland",
    "street_address": "2350 Marriottsville Road",
    "city": "Marriottsville",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21104",
    "latitude": 39.305,
    "longitude": -76.901944,
    "primary_technology": "Landfill Gas",
    "technology_tags": [
      "Landfill Gas"
    ],
    "energy_source_codes": [
      "LFG"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 258.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "LFG"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.029,
    "annual_capacity_factor": 0.0295,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Marriottsville",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60036",
    "record_type": "power_plant",
    "eia_plant_code": 60036,
    "name": "CCBC-Catonsville",
    "operator": "Luminace Solar Holding, LLC",
    "street_address": "800 S Rolling Road",
    "city": "Catonsville",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21228",
    "latitude": 39.2525,
    "longitude": -76.735,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.6,
    "generator_count": 1,
    "net_generation_mwh": 2538.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.29,
    "annual_capacity_factor": 0.1811,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Catonsville",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-68942",
    "record_type": "power_plant",
    "eia_plant_code": 68942,
    "name": "Chaberton Solar Catherine",
    "operator": "Pivot Energy",
    "street_address": "14196 Frederick Rd.",
    "city": "Cooksville",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21723",
    "latitude": 39.316996,
    "longitude": -77.005852,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3106.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.355,
    "annual_capacity_factor": 0.1773,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Cooksville",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59743",
    "record_type": "power_plant",
    "eia_plant_code": 59743,
    "name": "Chimes West Friendship (Nixon Farms)",
    "operator": "SunE SEM 1, LLC",
    "street_address": "2800 Nixon Farms Lane",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21792",
    "latitude": 39.296749,
    "longitude": -76.957413,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.2,
    "generator_count": 1,
    "net_generation_mwh": 1705.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2014,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.195,
    "annual_capacity_factor": 0.1622,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66160",
    "record_type": "power_plant",
    "eia_plant_code": 66160,
    "name": "Friendship I",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "13300 Frederick Rd",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.30953,
    "longitude": -76.979147,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 4404.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.503,
    "annual_capacity_factor": 0.2514,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66162",
    "record_type": "power_plant",
    "eia_plant_code": 66162,
    "name": "Friendship II",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "1330 Frederick Rd",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.309529,
    "longitude": -76.979146,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 4401.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.502,
    "annual_capacity_factor": 0.2512,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66655",
    "record_type": "power_plant",
    "eia_plant_code": 66655,
    "name": "KDC Solar CV Animal Control LLC",
    "operator": "KDC Solar CV Animal Control LLC",
    "street_address": "13370 Route 144",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.314718,
    "longitude": -76.978872,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3144.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.359,
    "annual_capacity_factor": 0.1795,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66652",
    "record_type": "power_plant",
    "eia_plant_code": 66652,
    "name": "KDC Solar CV Ascend One LLC",
    "operator": "KDC Solar CV Ascend One LLC",
    "street_address": "13370 Route 11",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.31771,
    "longitude": -76.984541,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3681.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.42,
    "annual_capacity_factor": 0.2101,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66653",
    "record_type": "power_plant",
    "eia_plant_code": 66653,
    "name": "KDC Solar CV Cedar Lane Park LLC",
    "operator": "KDC Solar CV Cedar Lane Park LLC",
    "street_address": "13370 Route 144",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.314718,
    "longitude": -76.978872,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3100.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.354,
    "annual_capacity_factor": 0.1769,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66654",
    "record_type": "power_plant",
    "eia_plant_code": 66654,
    "name": "KDC Solar CV Central MD Regional Transit",
    "operator": "KDC Solar CV Central MD Regional Transit LLC",
    "street_address": "13370 Frederick Rd",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.311,
    "longitude": -76.978,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2929.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.334,
    "annual_capacity_factor": 0.1672,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66656",
    "record_type": "power_plant",
    "eia_plant_code": 66656,
    "name": "KDC Solar CV O'Donnell Property LLC",
    "operator": "KDC Solar CV O'Donnell Property LLC",
    "street_address": "13370 Frederick Rd",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.311,
    "longitude": -76.978,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3013.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.344,
    "annual_capacity_factor": 0.172,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65984",
    "record_type": "power_plant",
    "eia_plant_code": 65984,
    "name": "KDC Solar TC Blandair Park LLC",
    "operator": "CleanCapital Holdings",
    "street_address": "12855 Frederick Road",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.300615,
    "longitude": -76.960961,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3739.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.427,
    "annual_capacity_factor": 0.2134,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65983",
    "record_type": "power_plant",
    "eia_plant_code": 65983,
    "name": "KDC Solar TC George Howard LLC",
    "operator": "CleanCapital Holdings",
    "street_address": "12855 Frederick Road",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.300067,
    "longitude": -76.957131,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3402.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.388,
    "annual_capacity_factor": 0.1942,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65982",
    "record_type": "power_plant",
    "eia_plant_code": 65982,
    "name": "KDC Solar TC Little Patuxent WWTP LLC",
    "operator": "CleanCapital Holdings",
    "street_address": "12855 Frederick Road",
    "city": "West Friendship",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21794",
    "latitude": 39.299137,
    "longitude": -76.959953,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3814.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.435,
    "annual_capacity_factor": 0.2177,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "West Friendship",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-69069",
    "record_type": "power_plant",
    "eia_plant_code": 69069,
    "name": "MD - CPG - Ten Oaks",
    "operator": "Solar DG MD Ten Oaks LLC",
    "street_address": "3950 Ten Oaks Rd,",
    "city": "Glenelg",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21737",
    "latitude": 39.261126,
    "longitude": -76.986173,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Glenelg",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67670",
    "record_type": "power_plant",
    "eia_plant_code": 67670,
    "name": "MD JESSUP 7950 OCEANO AVE",
    "operator": "PFMD LL Jessup LLC",
    "street_address": "7950 OCEANO AVE",
    "city": "Jessup",
    "county": "Howard",
    "state": "MD",
    "postal_code": "20794",
    "latitude": 39.157496,
    "longitude": -76.787253,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 623.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.071,
    "annual_capacity_factor": 0.0474,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Jessup",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64241",
    "record_type": "power_plant",
    "eia_plant_code": 64241,
    "name": "Maryland Bioenergy Center (Jessup)",
    "operator": "Bioenergy DevCo",
    "street_address": "7900 Oceano Drive",
    "city": "Jessup",
    "county": "Howard",
    "state": "MD",
    "postal_code": "20794",
    "latitude": 39.1578,
    "longitude": -76.78042,
    "primary_technology": "Natural Gas Fired Combustion Turbine",
    "technology_tags": [
      "Natural Gas Fired Combustion Turbine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 1.1,
    "generator_count": 1,
    "net_generation_mwh": 1863.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.213,
    "annual_capacity_factor": 0.1933,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Jessup",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63237",
    "record_type": "power_plant",
    "eia_plant_code": 63237,
    "name": "Old Court Rd Solar",
    "operator": "Old Court Rd Solar, LLC",
    "street_address": "10021 Old Court Road",
    "city": "Woodstock",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21163",
    "latitude": 39.34167,
    "longitude": -76.8351,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2915.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.333,
    "annual_capacity_factor": 0.1664,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Woodstock",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64642",
    "record_type": "power_plant",
    "eia_plant_code": 64642,
    "name": "P52ES 1755 Henryton Rd Phase 1 LLC CSG",
    "operator": "Nautilus Solar Solutions",
    "street_address": "1825 Sand Hill Road",
    "city": "Marriottsville",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21104",
    "latitude": 39.32015,
    "longitude": -76.92965,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.9,
    "generator_count": 1,
    "net_generation_mwh": 3374.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.385,
    "annual_capacity_factor": 0.2027,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Marriottsville",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64643",
    "record_type": "power_plant",
    "eia_plant_code": 64643,
    "name": "P52ES 1755 Henryton Rd Phase 2 LLC",
    "operator": "Nautilus Solar Solutions",
    "street_address": "1825 Sand Hill Road",
    "city": "Marriottsville",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21104",
    "latitude": 39.32015,
    "longitude": -76.92965,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.9,
    "generator_count": 1,
    "net_generation_mwh": 3768.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.43,
    "annual_capacity_factor": 0.2264,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Marriottsville",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65612",
    "record_type": "power_plant",
    "eia_plant_code": 65612,
    "name": "Snowden River CSG",
    "operator": "Snowden River Parkway, LLC",
    "street_address": "9325 Snowden River Parkway",
    "city": "Columbia",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21046",
    "latitude": 39.175364,
    "longitude": -76.837373,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.9,
    "generator_count": 1,
    "net_generation_mwh": 3189.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.364,
    "annual_capacity_factor": 0.1916,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Columbia",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67334",
    "record_type": "power_plant",
    "eia_plant_code": 67334,
    "name": "Ten Oaks",
    "operator": "Nautilus Solar Solutions",
    "street_address": "6160 Ten Oaks Road",
    "city": "Clarksville",
    "county": "Howard",
    "state": "MD",
    "postal_code": "21029",
    "latitude": 39.2028,
    "longitude": -76.9561,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2899.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.331,
    "annual_capacity_factor": 0.1655,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24027",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Howard County",
      "Clarksville",
      "Census state 24",
      "Census county 24027",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62332",
    "record_type": "power_plant",
    "eia_plant_code": 62332,
    "name": "Blue Star",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "12213 Galena Road",
    "city": "Massey",
    "county": "Kent",
    "state": "MD",
    "postal_code": "21650",
    "latitude": 39.35,
    "longitude": -75.85,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 7.5,
    "generator_count": 1,
    "net_generation_mwh": 11450.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 2,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 1.307,
    "annual_capacity_factor": 0.1743,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24029",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Kent County",
      "Massey",
      "Census state 24",
      "Census county 24029",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58243",
    "record_type": "power_plant",
    "eia_plant_code": 58243,
    "name": "Kent County - Worton Complex",
    "operator": "Terraform Arcadia",
    "street_address": "11401 Worton Road",
    "city": "Worton",
    "county": "Kent",
    "state": "MD",
    "postal_code": "21678",
    "latitude": 39.280833,
    "longitude": -76.090833,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1369.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.156,
    "annual_capacity_factor": 0.1563,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24029",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Kent County",
      "Worton",
      "Census state 24",
      "Census county 24029",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58239",
    "record_type": "power_plant",
    "eia_plant_code": 58239,
    "name": "Kent County-Kennedyville",
    "operator": "Terraform Arcadia",
    "street_address": "11651 Kennedyville Road",
    "city": "Kennedyville",
    "county": "Kent",
    "state": "MD",
    "postal_code": "21645",
    "latitude": 39.297222,
    "longitude": -75.982222,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1544.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.176,
    "annual_capacity_factor": 0.1763,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24029",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Kent County",
      "Kennedyville",
      "Census state 24",
      "Census county 24029",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58241",
    "record_type": "power_plant",
    "eia_plant_code": 58241,
    "name": "Rock Hall",
    "operator": "Terraform Arcadia",
    "street_address": "6015 N Main Street",
    "city": "Rock Hall",
    "county": "Kent",
    "state": "MD",
    "postal_code": "21661",
    "latitude": 39.144369,
    "longitude": -76.231644,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1588.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.181,
    "annual_capacity_factor": 0.1813,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24029",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Kent County",
      "Rock Hall",
      "Census state 24",
      "Census county 24029",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60096",
    "record_type": "power_plant",
    "eia_plant_code": 60096,
    "name": "Town of Chestertown- Chestertown WWTP",
    "operator": "Tesla Inc.",
    "street_address": "25792 John Hanson Rd",
    "city": "Chestertown",
    "county": "Kent",
    "state": "MD",
    "postal_code": "21620",
    "latitude": 39.199453,
    "longitude": -76.076693,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1701.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.194,
    "annual_capacity_factor": 0.1942,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24029",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Kent County",
      "Chestertown",
      "Census state 24",
      "Census county 24029",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67458",
    "record_type": "power_plant",
    "eia_plant_code": 67458,
    "name": "Boyd Soccerplex",
    "operator": "Madison Energy Investments LLC",
    "street_address": "18031 Central Park Circle",
    "city": "Boyds",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20841",
    "latitude": 39.152794,
    "longitude": -77.311359,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 354.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.04,
    "annual_capacity_factor": 0.0404,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Boyds",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65945",
    "record_type": "power_plant",
    "eia_plant_code": 65945,
    "name": "Brookville Smart Bus Depot Microgrid",
    "operator": "AlphaStruxure Service Co LP",
    "street_address": "8710 Brookville Rd",
    "city": "Silver Spring",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20910",
    "latitude": 38.99903,
    "longitude": -77.058,
    "primary_technology": "Natural Gas Internal Combustion Engine",
    "technology_tags": [
      "Natural Gas Internal Combustion Engine",
      "Solar Photovoltaic",
      "Batteries"
    ],
    "energy_source_codes": [
      "MWH",
      "NG",
      "SUN"
    ],
    "nameplate_capacity_mw": 5.0,
    "generator_count": 5,
    "net_generation_mwh": 2120.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN",
      "NG",
      "MWH"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.242,
    "annual_capacity_factor": 0.0484,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Silver Spring",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58207",
    "record_type": "power_plant",
    "eia_plant_code": 58207,
    "name": "Central Utility Plant at White Oak",
    "operator": "GSA Metropolitan Service Center",
    "street_address": "10903 New Hampshire Ave",
    "city": "Silver Spring",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20903",
    "latitude": 39.039444,
    "longitude": -76.9825,
    "primary_technology": "Natural Gas Fired Combined Cycle",
    "technology_tags": [
      "Natural Gas Fired Combined Cycle",
      "Natural Gas Fired Combustion Turbine",
      "Petroleum Liquids",
      "Natural Gas Internal Combustion Engine"
    ],
    "energy_source_codes": [
      "DFO",
      "NG"
    ],
    "nameplate_capacity_mw": 54.3,
    "generator_count": 12,
    "net_generation_mwh": 74045.08,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO"
    ],
    "year_built": 2003,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating with standby generators",
    "generator_status_codes": [
      "OP",
      "SB"
    ],
    "status_tags": [
      "Operating",
      "Standby"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "The facility has been subject to Maryland Department of the Environment air permitting. An initial Significant Permit to Operate (SPTO) for fuel burning equipment was applied for in 2015-2016 (permit number 2015 031-2552) for the address 10903 New Hampshire Ave, Silver Spring, MD 20903. A Title V (Part 70) operating permit was also under development for the GSA Federal Research Center at White Oak as of a public review docket. Current permit status (active, expired, or renewed) not confirmed in reviewed sources as of 2026-08-16.",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final",
      "kimi-maryland-department-of-the-environment-049b9b1e6a",
      "kimi-maryland-department-of-the-environment-7b8b99999e"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 8.453,
    "annual_capacity_factor": 0.1557,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Silver Spring",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1572",
    "record_type": "power_plant",
    "eia_plant_code": 1572,
    "name": "Dickerson Power",
    "operator": "Dickerson Power, LLC",
    "street_address": "21200 Martinsburg Rd.",
    "city": "Dickerson",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20842",
    "latitude": 39.2097,
    "longitude": -77.4644,
    "primary_technology": "Natural Gas Fired Combustion Turbine",
    "technology_tags": [
      "Natural Gas Fired Combustion Turbine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 326.0,
    "generator_count": 2,
    "net_generation_mwh": 139608.004,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO"
    ],
    "year_built": 1992,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 15.937,
    "annual_capacity_factor": 0.0489,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Dickerson",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62910",
    "record_type": "power_plant",
    "eia_plant_code": 62910,
    "name": "MNCPPC Germantown Solar",
    "operator": "Standard Solar",
    "street_address": "18041 Central Park Circle",
    "city": "Boyds",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20841",
    "latitude": 39.149037,
    "longitude": -77.317948,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1623.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.185,
    "annual_capacity_factor": 0.1853,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Boyds",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65610",
    "record_type": "power_plant",
    "eia_plant_code": 65610,
    "name": "MO32 (CSG)",
    "operator": "TPE MD MO32 LLC",
    "street_address": "2420 Spencerville Road",
    "city": "Spencerville",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20868",
    "latitude": 39.119391,
    "longitude": -76.959758,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3451.3,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.394,
    "annual_capacity_factor": 0.197,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Spencerville",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65611",
    "record_type": "power_plant",
    "eia_plant_code": 65611,
    "name": "MO33 CSG",
    "operator": "TPE MD MO33 LLC",
    "street_address": "5830 Olney-Laytonsville Road",
    "city": "Gaithersburg",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20882",
    "latitude": 39.187812,
    "longitude": -77.119864,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3269.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.373,
    "annual_capacity_factor": 0.1866,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Gaithersburg",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60820",
    "record_type": "power_plant",
    "eia_plant_code": 60820,
    "name": "Montgomery County Correctional Facility",
    "operator": "Tesla Inc.",
    "street_address": "22880 Whelan Ln",
    "city": "Boyds",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20841",
    "latitude": 39.237945,
    "longitude": -77.293217,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.4,
    "generator_count": 1,
    "net_generation_mwh": 1973.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2017,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.225,
    "annual_capacity_factor": 0.1609,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Boyds",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-50657",
    "record_type": "power_plant",
    "eia_plant_code": 50657,
    "name": "Montgomery County Resource Recovery",
    "operator": "Covanta Montgomery, Inc.",
    "street_address": "21204 Martinsburg Rd",
    "city": "Dickerson",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20842",
    "latitude": 39.2006,
    "longitude": -77.4556,
    "primary_technology": "Municipal Solid Waste",
    "technology_tags": [
      "Municipal Solid Waste"
    ],
    "energy_source_codes": [
      "MSW"
    ],
    "nameplate_capacity_mw": 67.8,
    "generator_count": 1,
    "net_generation_mwh": 302213.995,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "MSN",
      "MSB",
      "NG"
    ],
    "year_built": 1995,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 34.499,
    "annual_capacity_factor": 0.5088,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Dickerson",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61608",
    "record_type": "power_plant",
    "eia_plant_code": 61608,
    "name": "Montgomery County Solar",
    "operator": "Montgomery County Solar",
    "street_address": "100 Edison Park Dr.",
    "city": "Gaithersburg",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20878",
    "latitude": 39.113,
    "longitude": -77.236,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.9,
    "generator_count": 1,
    "net_generation_mwh": 2720.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.311,
    "annual_capacity_factor": 0.1634,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Gaithersburg",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-56668",
    "record_type": "power_plant",
    "eia_plant_code": 56668,
    "name": "NIH Cogeneration Facility",
    "operator": "National Institutes of Health",
    "street_address": "9000 Rockville Pike Bldg 11A",
    "city": "Bethesda",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20892",
    "latitude": 39.0,
    "longitude": -77.0939,
    "primary_technology": "Natural Gas Fired Combustion Turbine",
    "technology_tags": [
      "Natural Gas Fired Combustion Turbine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 28.0,
    "generator_count": 1,
    "net_generation_mwh": 155122.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "Operating under a five-year renewable Title V air permit issued by Maryland Department of the Environment (MDE) pursuant to COMAR 26.11.03.01; the NIH Bethesda Campus is classified as a major source due to NOx emissions exceeding the 25-ton threshold in Montgomery County",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final",
      "kimi-nih-environmental-management-system-91aa240c2b"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 1,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 17.708,
    "annual_capacity_factor": 0.6324,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Bethesda",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62208",
    "record_type": "power_plant",
    "eia_plant_code": 62208,
    "name": "NIST Solar",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "100 Bureau Drive",
    "city": "Gaithersburg",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20899",
    "latitude": 39.127,
    "longitude": -77.216,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 4.0,
    "generator_count": 1,
    "net_generation_mwh": 5553.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.634,
    "annual_capacity_factor": 0.1585,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Gaithersburg",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67180",
    "record_type": "power_plant",
    "eia_plant_code": 67180,
    "name": "Oaks Landfill - ANEM",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "6001 Olney Laytonsville Rd",
    "city": "Gaithersburg",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20882",
    "latitude": 39.193672,
    "longitude": -77.118718,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2657.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.303,
    "annual_capacity_factor": 0.1517,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Gaithersburg",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67508",
    "record_type": "power_plant",
    "eia_plant_code": 67508,
    "name": "Oaks Landfill CS 1",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "6001 Olney Laytonsville Road",
    "city": "Gaithersburg",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20882",
    "latitude": 39.193589,
    "longitude": -77.118718,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2645.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.302,
    "annual_capacity_factor": 0.151,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Gaithersburg",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67690",
    "record_type": "power_plant",
    "eia_plant_code": 67690,
    "name": "Oaks Landfill CS 2",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "6001 Olney Laytonsville Rd",
    "city": "Gaithersburg",
    "county": "Montgomery",
    "state": "MD",
    "postal_code": "20882",
    "latitude": 39.193664,
    "longitude": -77.118697,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2722.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.311,
    "annual_capacity_factor": 0.1554,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24031",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Montgomery County",
      "Gaithersburg",
      "Census state 24",
      "Census county 24031",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63323",
    "record_type": "power_plant",
    "eia_plant_code": 63323,
    "name": "Bluefin Origination 1",
    "operator": "Bluefin Origination 1, LLC",
    "street_address": "11503 Cherry Tree Crossing Roa",
    "city": "Brandywine",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20623",
    "latitude": 38.73169,
    "longitude": -76.82843,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3473.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.396,
    "annual_capacity_factor": 0.1982,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Brandywine",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61915",
    "record_type": "power_plant",
    "eia_plant_code": 61915,
    "name": "Bowie State Solar",
    "operator": "Terraform Arcadia",
    "street_address": "14000 Jericho Park Rd.",
    "city": "Bowie",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20715",
    "latitude": 39.019083,
    "longitude": -76.759479,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.3,
    "generator_count": 1,
    "net_generation_mwh": 373.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.043,
    "annual_capacity_factor": 0.0328,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Bowie",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-54832",
    "record_type": "power_plant",
    "eia_plant_code": 54832,
    "name": "Brandywine Power Facility",
    "operator": "KMC Thermo, LLC",
    "street_address": "16400 Mattawoman Drive",
    "city": "Brandywine",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20613",
    "latitude": 38.6681,
    "longitude": -76.8678,
    "primary_technology": "Natural Gas Fired Combined Cycle",
    "technology_tags": [
      "Natural Gas Fired Combined Cycle"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 288.8,
    "generator_count": 3,
    "net_generation_mwh": 561691.997,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO"
    ],
    "year_built": 1996,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 64.12,
    "annual_capacity_factor": 0.222,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Brandywine",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-50060",
    "record_type": "power_plant",
    "eia_plant_code": 50060,
    "name": "Brown Station Road Plant I",
    "operator": "Prince George's County",
    "street_address": "13400 Dille Drive",
    "city": "Upper Marlboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20774",
    "latitude": 38.824863,
    "longitude": -76.773149,
    "primary_technology": "Landfill Gas",
    "technology_tags": [
      "Landfill Gas"
    ],
    "energy_source_codes": [
      "LFG"
    ],
    "nameplate_capacity_mw": 2.7,
    "generator_count": 3,
    "net_generation_mwh": null,
    "generation_year": 2024,
    "generation_fuel_codes": [],
    "year_built": 1987,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "temporarily out of service",
    "generator_status_codes": [
      "OA"
    ],
    "status_tags": [
      "Out of service - return expected"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": null,
    "annual_capacity_factor": null,
    "planning_output_basis": "No annual net-generation value is available to calculate annual-average planning output.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Marlboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-55964",
    "record_type": "power_plant",
    "eia_plant_code": 55964,
    "name": "Brown Station Road Plant II",
    "operator": "Prince George's County",
    "street_address": "3500-C Brown Station Rd.",
    "city": "Upper Marlboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20774",
    "latitude": 38.847585,
    "longitude": -76.785912,
    "primary_technology": "Landfill Gas",
    "technology_tags": [
      "Landfill Gas"
    ],
    "energy_source_codes": [
      "LFG"
    ],
    "nameplate_capacity_mw": 4.0,
    "generator_count": 4,
    "net_generation_mwh": 11.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "LFG"
    ],
    "year_built": 2003,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "temporarily out of service",
    "generator_status_codes": [
      "OA"
    ],
    "status_tags": [
      "Out of service - return expected"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.001,
    "annual_capacity_factor": 0.0003,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Marlboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64647",
    "record_type": "power_plant",
    "eia_plant_code": 64647,
    "name": "Bulldog Solar One, LLC",
    "operator": "Nautilus Solar Solutions",
    "street_address": "17800 Queen Anne Bridge Rd",
    "city": "Bowie",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20716",
    "latitude": 38.9152,
    "longitude": -76.6972,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3746.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.428,
    "annual_capacity_factor": 0.2138,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Bowie",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1571",
    "record_type": "power_plant",
    "eia_plant_code": 1571,
    "name": "Chalk Point Power",
    "operator": "Chalk Point Power, LLC",
    "street_address": "P.O.  10",
    "city": "Aquasco",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20608",
    "latitude": 38.5444,
    "longitude": -76.6861,
    "primary_technology": "Natural Gas Steam Turbine",
    "technology_tags": [
      "Natural Gas Steam Turbine",
      "Natural Gas Fired Combustion Turbine",
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO",
      "NG"
    ],
    "nameplate_capacity_mw": 1825.0,
    "generator_count": 8,
    "net_generation_mwh": 922331.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO",
      "BIT",
      "RFO"
    ],
    "year_built": 1967,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 105.289,
    "annual_capacity_factor": 0.0577,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Aquasco",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65130",
    "record_type": "power_plant",
    "eia_plant_code": 65130,
    "name": "City of Bowie",
    "operator": "Tesla Inc.",
    "street_address": "18509 Central Av",
    "city": "Mitchellville",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20716",
    "latitude": 38.904641,
    "longitude": -76.688773,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 4184.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.478,
    "annual_capacity_factor": 0.2388,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Mitchellville",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-69080",
    "record_type": "power_plant",
    "eia_plant_code": 69080,
    "name": "Claggett Landing",
    "operator": "Madison Energy Investments LLC",
    "street_address": "16900 Claggett Landing Rd",
    "city": "Upper Malboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20774",
    "latitude": 38.880556,
    "longitude": -76.7075,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.6,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Malboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-57747",
    "record_type": "power_plant",
    "eia_plant_code": 57747,
    "name": "FedEx Field Solar Facility",
    "operator": "NW Stadium Solar Plant",
    "street_address": "1600 FedEx Way",
    "city": "Landover",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20785",
    "latitude": 38.907778,
    "longitude": -76.864444,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": null,
    "generation_year": 2024,
    "generation_fuel_codes": [],
    "year_built": 2011,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": null,
    "annual_capacity_factor": null,
    "planning_output_basis": "No annual net-generation value is available to calculate annual-average planning output.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Landover",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62043",
    "record_type": "power_plant",
    "eia_plant_code": 62043,
    "name": "First Baptist Church of Glenarden",
    "operator": "Madison Energy Holdings LLC",
    "street_address": "700 Watkins Park Drive",
    "city": "Upper Marlboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20774",
    "latitude": 38.82,
    "longitude": -76.87,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2953.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 2,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.337,
    "annual_capacity_factor": 0.2247,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Marlboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61738",
    "record_type": "power_plant",
    "eia_plant_code": 61738,
    "name": "GWCC PV Solar Farm",
    "operator": "GWCC PV Solar Farm",
    "street_address": "5601 Sunnyside Ave",
    "city": "Beltsville",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20705",
    "latitude": 39.017238,
    "longitude": -76.908997,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.6,
    "generator_count": 1,
    "net_generation_mwh": 2121.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.242,
    "annual_capacity_factor": 0.1513,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Beltsville",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67486",
    "record_type": "power_plant",
    "eia_plant_code": 67486,
    "name": "Hall Property",
    "operator": "Standard Solar",
    "street_address": "13111 Croom Road",
    "city": "Upper Marlboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20772",
    "latitude": 38.708361,
    "longitude": -76.74585,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2559.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.292,
    "annual_capacity_factor": 0.1461,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Marlboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66819",
    "record_type": "power_plant",
    "eia_plant_code": 66819,
    "name": "Holly Spring Meadows",
    "operator": "Standard Solar",
    "street_address": "5503 Marlboro Pike",
    "city": "District Heights",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20747",
    "latitude": 38.862089,
    "longitude": -76.91249,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.2,
    "generator_count": 1,
    "net_generation_mwh": 1930.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.22,
    "annual_capacity_factor": 0.1836,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "District Heights",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58015",
    "record_type": "power_plant",
    "eia_plant_code": 58015,
    "name": "IKEA College Park 411",
    "operator": "IKEA Property Inc",
    "street_address": "10100 Baltimore Ave.",
    "city": "College Park",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20740",
    "latitude": 39.021,
    "longitude": -76.926,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 2,
    "net_generation_mwh": 2285.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2012,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.261,
    "annual_capacity_factor": 0.1304,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "College Park",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60302",
    "record_type": "power_plant",
    "eia_plant_code": 60302,
    "name": "Keys Energy Center",
    "operator": "PSEG Keys Energy Center, LLC",
    "street_address": "10322 North Keys Road",
    "city": "Brandywine",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20613",
    "latitude": 38.695519,
    "longitude": -76.827785,
    "primary_technology": "Natural Gas Fired Combined Cycle",
    "technology_tags": [
      "Natural Gas Fired Combined Cycle"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 830.6,
    "generator_count": 3,
    "net_generation_mwh": 4916094.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 561.198,
    "annual_capacity_factor": 0.6757,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Brandywine",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64602",
    "record_type": "power_plant",
    "eia_plant_code": 64602,
    "name": "Kirby Road Solar, LLC",
    "operator": "Nautilus Solar Solutions",
    "street_address": "8100 Temple Hill Rd",
    "city": "Clinton",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20735",
    "latitude": 38.77897,
    "longitude": -76.923695,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.3,
    "generator_count": 1,
    "net_generation_mwh": 2543.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.29,
    "annual_capacity_factor": 0.2233,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Clinton",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65340",
    "record_type": "power_plant",
    "eia_plant_code": 65340,
    "name": "MD - CS - BGE - PR24 TPE",
    "operator": "Distributed Solar Development, LLC",
    "street_address": "17205 Mill Branch Place",
    "city": "Mitchellville",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20716",
    "latitude": 38.927431,
    "longitude": -76.699164,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 4040.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.461,
    "annual_capacity_factor": 0.2306,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Mitchellville",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64689",
    "record_type": "power_plant",
    "eia_plant_code": 64689,
    "name": "MD - PR97 (CSG)",
    "operator": "Distributed Solar Development, LLC",
    "street_address": "3111 Mill Branch Road",
    "city": "Bowie",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20716",
    "latitude": 38.934666,
    "longitude": -76.714819,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 4277.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.488,
    "annual_capacity_factor": 0.2441,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Bowie",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64604",
    "record_type": "power_plant",
    "eia_plant_code": 64604,
    "name": "MNCPPC Randall Farm",
    "operator": "Standard Solar",
    "street_address": "4200 Ritchie-Marlboro RD",
    "city": "Upper Marlboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20772",
    "latitude": 38.831624,
    "longitude": -76.803146,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.4,
    "generator_count": 1,
    "net_generation_mwh": 2323.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.265,
    "annual_capacity_factor": 0.1894,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Marlboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61890",
    "record_type": "power_plant",
    "eia_plant_code": 61890,
    "name": "NRG Chalk Point CT",
    "operator": "NRG Chalk Point CT",
    "street_address": "P.O 10",
    "city": "Aquasco",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20608",
    "latitude": 38.5444,
    "longitude": -76.6861,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 94.0,
    "generator_count": 1,
    "net_generation_mwh": 697.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO",
      "NG"
    ],
    "year_built": 1990,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "This EIA coordinate is shared by 2 plant records and cannot distinguish the individual installations; retain wider aerial context.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 2,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.08,
    "annual_capacity_factor": 0.0008,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Aquasco",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65357",
    "record_type": "power_plant",
    "eia_plant_code": 65357,
    "name": "OER Monarch CSG",
    "operator": "Standard Solar",
    "street_address": "6901 Old Crain Hwy",
    "city": "Upper Marlboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20722",
    "latitude": 38.799594,
    "longitude": -76.789482,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3578.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2021,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.408,
    "annual_capacity_factor": 0.2042,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Marlboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63654",
    "record_type": "power_plant",
    "eia_plant_code": 63654,
    "name": "Sheriff Road",
    "operator": "Sheriff Rd Solar LLC",
    "street_address": "6300 Sheriff Road",
    "city": "Hyattsville",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20785",
    "latitude": 38.911287,
    "longitude": -76.894882,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.1,
    "generator_count": 1,
    "net_generation_mwh": null,
    "generation_year": 2024,
    "generation_fuel_codes": [],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": null,
    "annual_capacity_factor": null,
    "planning_output_basis": "No annual net-generation value is available to calculate annual-average planning output.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Hyattsville",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62331",
    "record_type": "power_plant",
    "eia_plant_code": 62331,
    "name": "Sol Phoenix",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "513 Rollins Avenue",
    "city": "Capitol Heights",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20743",
    "latitude": 38.85,
    "longitude": -76.95,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.5,
    "generator_count": 1,
    "net_generation_mwh": 3554.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 2,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.406,
    "annual_capacity_factor": 0.1623,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Capitol Heights",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67490",
    "record_type": "power_plant",
    "eia_plant_code": 67490,
    "name": "Spectrum Solar Hybrid",
    "operator": "Spectrum Solar LLC",
    "street_address": "4700 Full Gospel Blvd",
    "city": "Oxon Hill",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20745",
    "latitude": 38.95,
    "longitude": -76.95,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 5.6,
    "generator_count": 2,
    "net_generation_mwh": 10653.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 2,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 1.216,
    "annual_capacity_factor": 0.2172,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Oxon Hill",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62327",
    "record_type": "power_plant",
    "eia_plant_code": 62327,
    "name": "Synergen Panorama, LLC CSG",
    "operator": "Altus Power America Management, LLC",
    "street_address": "2301 Tucker Road",
    "city": "Fort Washington",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20744",
    "latitude": 38.772107,
    "longitude": -76.973379,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 5.0,
    "generator_count": 1,
    "net_generation_mwh": 7893.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.901,
    "annual_capacity_factor": 0.1802,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Fort Washington",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-56038",
    "record_type": "power_plant",
    "eia_plant_code": 56038,
    "name": "UMCP CHP Plant",
    "operator": "Trigen-Cinergy Solutions College Park",
    "street_address": "UMCP Campus Bldg 001",
    "city": "College Park",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20742",
    "latitude": 38.985844,
    "longitude": -76.935478,
    "primary_technology": "Natural Gas Fired Combustion Turbine",
    "technology_tags": [
      "Natural Gas Fired Combustion Turbine",
      "Natural Gas Steam Turbine"
    ],
    "energy_source_codes": [
      "NG"
    ],
    "nameplate_capacity_mw": 27.4,
    "generator_count": 3,
    "net_generation_mwh": 84391.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO"
    ],
    "year_built": 2003,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 9.634,
    "annual_capacity_factor": 0.3516,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "College Park",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63075",
    "record_type": "power_plant",
    "eia_plant_code": 63075,
    "name": "Upper Marlboro 1 CSG",
    "operator": "Nautilus Solar Solutions",
    "street_address": "7420 South Osborne Road",
    "city": "Upper Marlboro",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20772",
    "latitude": 38.789216,
    "longitude": -76.800911,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3118.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.356,
    "annual_capacity_factor": 0.178,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Upper Marlboro",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65959",
    "record_type": "power_plant",
    "eia_plant_code": 65959,
    "name": "WMATA - Cheverly Metro (CSG)",
    "operator": "MN8 Energy LLC",
    "street_address": "5501 Columbia Park Rd.",
    "city": "Cheverly",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20785",
    "latitude": 38.915643,
    "longitude": -76.917372,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.9,
    "generator_count": 1,
    "net_generation_mwh": 0.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Cheverly",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65960",
    "record_type": "power_plant",
    "eia_plant_code": 65960,
    "name": "WMATA - Naylor Rd. Metro",
    "operator": "MN8 Energy LLC",
    "street_address": "3101 Branch Ave",
    "city": "Temple Hills",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20748",
    "latitude": 38.85034,
    "longitude": -76.9573,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.7,
    "generator_count": 1,
    "net_generation_mwh": 2664.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.304,
    "annual_capacity_factor": 0.1789,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Temple Hills",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65961",
    "record_type": "power_plant",
    "eia_plant_code": 65961,
    "name": "WMATA - S. Ave. Carport (East) (CSG)",
    "operator": "MN8 Energy LLC",
    "street_address": "1422 Southern Ave SE",
    "city": "Hillcrest Heights",
    "county": "Prince Georges",
    "state": "MD",
    "postal_code": "20748",
    "latitude": 38.84066,
    "longitude": -76.9752,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.7,
    "generator_count": 1,
    "net_generation_mwh": 1934.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.221,
    "annual_capacity_factor": 0.1299,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24033",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Georges County",
      "Hillcrest Heights",
      "Census state 24",
      "Census county 24033",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67405",
    "record_type": "power_plant",
    "eia_plant_code": 67405,
    "name": "Beech Road (CSG)",
    "operator": "Nautilus Solar Solutions",
    "street_address": "4981 Beech Road",
    "city": "Temple Hill",
    "county": "Prince Geroges",
    "state": "MD",
    "postal_code": "20748",
    "latitude": 38.82294,
    "longitude": -76.93471,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 3.0,
    "generator_count": 1,
    "net_generation_mwh": 1641.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.187,
    "annual_capacity_factor": 0.0624,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": null,
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Prince Geroges County",
      "Temple Hill",
      "Census state 24",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62074",
    "record_type": "power_plant",
    "eia_plant_code": 62074,
    "name": "Bd of Educ of Queen Anne's Cnty, Cnty HS",
    "operator": "Tesla Inc.",
    "street_address": "125 Ruthsburg Road",
    "city": "Centreville",
    "county": "Queen Annes",
    "state": "MD",
    "postal_code": "21617",
    "latitude": 39.035986,
    "longitude": -76.054316,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.7,
    "generator_count": 1,
    "net_generation_mwh": 2618.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.299,
    "annual_capacity_factor": 0.1758,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24035",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Queen Annes County",
      "Centreville",
      "Census state 24",
      "Census county 24035",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63910",
    "record_type": "power_plant",
    "eia_plant_code": 63910,
    "name": "Bluegrass Solar",
    "operator": "MN8 Energy LLC",
    "street_address": "TBD",
    "city": "Church Hill",
    "county": "Queen Annes",
    "state": "MD",
    "postal_code": "21620",
    "latitude": 39.178761,
    "longitude": -75.960905,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 79.6,
    "generator_count": 1,
    "net_generation_mwh": 158095.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2022,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 18.047,
    "annual_capacity_factor": 0.2267,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24035",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Queen Annes County",
      "Church Hill",
      "Census state 24",
      "Census county 24035",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60465",
    "record_type": "power_plant",
    "eia_plant_code": 60465,
    "name": "Chesapeake College",
    "operator": "Tesla Inc.",
    "street_address": "1000 College Cir",
    "city": "Wye Mills",
    "county": "Queen Annes",
    "state": "MD",
    "postal_code": "21679",
    "latitude": 38.953389,
    "longitude": -76.083244,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2374.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.271,
    "annual_capacity_factor": 0.1807,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24035",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Queen Annes County",
      "Wye Mills",
      "Census state 24",
      "Census county 24035",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62720",
    "record_type": "power_plant",
    "eia_plant_code": 62720,
    "name": "Chester Woods Point Solar, LLC CSG",
    "operator": "Chester Woods Point Solar, LLC",
    "street_address": "400 Woods Point Road",
    "city": "Chester",
    "county": "Queen Annes",
    "state": "MD",
    "postal_code": "21619",
    "latitude": 38.94843,
    "longitude": -76.300435,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3936.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.449,
    "annual_capacity_factor": 0.2247,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24035",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Queen Annes County",
      "Chester",
      "Census state 24",
      "Census county 24035",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60737",
    "record_type": "power_plant",
    "eia_plant_code": 60737,
    "name": "Church Hill",
    "operator": "MN8 Energy LLC",
    "street_address": "630 Cedar Lane",
    "city": "Church Hill",
    "county": "Queen Annes",
    "state": "MD",
    "postal_code": "21623",
    "latitude": 39.100947,
    "longitude": -75.959681,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 6.0,
    "generator_count": 1,
    "net_generation_mwh": 7308.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.834,
    "annual_capacity_factor": 0.139,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24035",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Queen Annes County",
      "Church Hill",
      "Census state 24",
      "Census county 24035",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58631",
    "record_type": "power_plant",
    "eia_plant_code": 58631,
    "name": "Queen Anne's County",
    "operator": "Tesla Inc.",
    "street_address": "312 Safety Drive",
    "city": "Centreville",
    "county": "Queen Annes",
    "state": "MD",
    "postal_code": "21617",
    "latitude": 39.031667,
    "longitude": -76.016389,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2606.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2013,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.297,
    "annual_capacity_factor": 0.1487,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24035",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Queen Annes County",
      "Centreville",
      "Census state 24",
      "Census county 24035",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60604",
    "record_type": "power_plant",
    "eia_plant_code": 60604,
    "name": "Wye Mills VNEM CSG",
    "operator": "Tesla Inc.",
    "street_address": "29500 Queen Anne Hwy",
    "city": "Queen Anne",
    "county": "Queen Annes",
    "state": "MD",
    "postal_code": "21657",
    "latitude": 38.94037,
    "longitude": -76.045658,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 10.0,
    "generator_count": 1,
    "net_generation_mwh": 18452.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 2.106,
    "annual_capacity_factor": 0.2106,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24035",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Queen Annes County",
      "Queen Anne",
      "Census state 24",
      "Census county 24035",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1563",
    "record_type": "power_plant",
    "eia_plant_code": 1563,
    "name": "Crisfield",
    "operator": "Calpine Mid-Atlantic Generation LLC",
    "street_address": "4079 Crisfield Highway",
    "city": "Crisfield",
    "county": "Somerset",
    "state": "MD",
    "postal_code": "21817",
    "latitude": 37.994134,
    "longitude": -75.837679,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 11.6,
    "generator_count": 4,
    "net_generation_mwh": 2721.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO"
    ],
    "year_built": 1968,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "standby / backup",
    "generator_status_codes": [
      "SB"
    ],
    "status_tags": [
      "Standby"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.311,
    "annual_capacity_factor": 0.0268,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24037",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Somerset County",
      "Crisfield",
      "Census state 24",
      "Census county 24037",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-10693",
    "record_type": "power_plant",
    "eia_plant_code": 10693,
    "name": "Eastern Correctional Institute",
    "operator": "Maryland Environmental Service",
    "street_address": "30420 Revells Neck Road",
    "city": "Westover",
    "county": "Somerset",
    "state": "MD",
    "postal_code": "21890",
    "latitude": 38.159,
    "longitude": -75.704,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids",
      "Natural Gas Steam Turbine",
      "Wood/Wood Waste Biomass"
    ],
    "energy_source_codes": [
      "DFO",
      "NG",
      "WDS"
    ],
    "nameplate_capacity_mw": 5.8,
    "generator_count": 4,
    "net_generation_mwh": 1163.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO",
      "BIT",
      "PG",
      "WDS"
    ],
    "year_built": 1987,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating with standby generators",
    "generator_status_codes": [
      "OP",
      "SB"
    ],
    "status_tags": [
      "Operating",
      "Standby"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.133,
    "annual_capacity_factor": 0.0229,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24037",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Somerset County",
      "Westover",
      "Census state 24",
      "Census county 24037",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59851",
    "record_type": "power_plant",
    "eia_plant_code": 59851,
    "name": "Great Bay Solar 1",
    "operator": "Great Bay Solar I LLC",
    "street_address": "Corner of Old Princess Anne Rd",
    "city": "Princess Anne",
    "county": "Somerset",
    "state": "MD",
    "postal_code": "21853",
    "latitude": 38.168889,
    "longitude": -75.6975,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 75.0,
    "generator_count": 1,
    "net_generation_mwh": 138734.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2018,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 15.837,
    "annual_capacity_factor": 0.2112,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24037",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Somerset County",
      "Princess Anne",
      "Census state 24",
      "Census county 24037",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-6391",
    "record_type": "power_plant",
    "eia_plant_code": 6391,
    "name": "Smith Island",
    "operator": "A & N Electric Coop",
    "street_address": "20697 Caleb Jones Rd",
    "city": "Ewell",
    "county": "Somerset",
    "state": "MD",
    "postal_code": "21824",
    "latitude": 37.9955,
    "longitude": -76.038881,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 2,
    "net_generation_mwh": 102.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO"
    ],
    "year_built": 1994,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.012,
    "annual_capacity_factor": 0.0078,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24037",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Somerset County",
      "Ewell",
      "Census state 24",
      "Census county 24037",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-59749",
    "record_type": "power_plant",
    "eia_plant_code": 59749,
    "name": "UMES (MD) - Princess Anne",
    "operator": "NVT LICENSES, LLC",
    "street_address": "MD Rt. 388 (West Post Office R",
    "city": "Princess Anne",
    "county": "Somerset",
    "state": "MD",
    "postal_code": "21583",
    "latitude": 38.20257,
    "longitude": -75.6764,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2416.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2011,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.276,
    "annual_capacity_factor": 0.1379,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24037",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Somerset County",
      "Princess Anne",
      "Census state 24",
      "Census county 24037",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58329",
    "record_type": "power_plant",
    "eia_plant_code": 58329,
    "name": "UMMS at Pocomoke",
    "operator": "Luminace Solar Maryland II, LLC",
    "street_address": "33001 Costen Road",
    "city": "Pocomoke City",
    "county": "Somerset",
    "state": "MD",
    "postal_code": "21851",
    "latitude": 38.098056,
    "longitude": -75.611111,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.8,
    "generator_count": 1,
    "net_generation_mwh": 5174.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2013,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.591,
    "annual_capacity_factor": 0.2109,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24037",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Somerset County",
      "Pocomoke City",
      "Census state 24",
      "Census county 24037",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-1580",
    "record_type": "power_plant",
    "eia_plant_code": 1580,
    "name": "Easton",
    "operator": "Easton Utilities Comm",
    "street_address": "219 N. Washington Street",
    "city": "Easton",
    "county": "Talbot",
    "state": "MD",
    "postal_code": "21601",
    "latitude": 38.7786,
    "longitude": -76.0769,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 31.1,
    "generator_count": 9,
    "net_generation_mwh": -1055.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "NG",
      "DFO"
    ],
    "year_built": 1954,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24041",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Talbot County",
      "Easton",
      "Census state 24",
      "Census county 24041",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-4257",
    "record_type": "power_plant",
    "eia_plant_code": 4257,
    "name": "Easton 2",
    "operator": "Easton Utilities Comm",
    "street_address": "8940 Glebe Park Drive",
    "city": "Easton",
    "county": "Talbot",
    "state": "MD",
    "postal_code": "21601",
    "latitude": 38.795,
    "longitude": -76.07,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids"
    ],
    "energy_source_codes": [
      "DFO"
    ],
    "nameplate_capacity_mw": 38.8,
    "generator_count": 8,
    "net_generation_mwh": -674.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO",
      "NG",
      "RFO"
    ],
    "year_built": 1978,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 3,
    "longitude_decimal_places": 2,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.0,
    "annual_capacity_factor": 0.0,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24041",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Talbot County",
      "Easton",
      "Census state 24",
      "Census county 24041",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60496",
    "record_type": "power_plant",
    "eia_plant_code": 60496,
    "name": "MEBA",
    "operator": "Altus Power America Management, LLC",
    "street_address": "27050 St. Michael's Rd.",
    "city": "Easton",
    "county": "Talbot",
    "state": "MD",
    "postal_code": "21601",
    "latitude": 38.772903,
    "longitude": -76.138912,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.5,
    "generator_count": 1,
    "net_generation_mwh": 2394.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2014,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.273,
    "annual_capacity_factor": 0.1822,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24041",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Talbot County",
      "Easton",
      "Census state 24",
      "Census county 24041",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67404",
    "record_type": "power_plant",
    "eia_plant_code": 67404,
    "name": "Bear One",
    "operator": "Nautilus Solar Solutions",
    "street_address": "14150 Hollow Road",
    "city": "Hancock",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21750",
    "latitude": 39.70285,
    "longitude": -78.08261,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3529.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2023,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.403,
    "annual_capacity_factor": 0.2014,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hancock",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-66868",
    "record_type": "power_plant",
    "eia_plant_code": 66868,
    "name": "Big Spring Solar (CSG)",
    "operator": "AES Clean Energy",
    "street_address": "11439 Ashton Road",
    "city": "Clear Spring",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21722",
    "latitude": 39.6301,
    "longitude": -77.9099,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 264.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.03,
    "annual_capacity_factor": 0.0151,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Clear Spring",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60029",
    "record_type": "power_plant",
    "eia_plant_code": 60029,
    "name": "CES VMT Solar",
    "operator": "Consolidated Edison Solutions Inc.",
    "street_address": "13302 Pennsylvania Avenue",
    "city": "Hagerstown",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21742",
    "latitude": 39.680865,
    "longitude": -77.727117,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.1,
    "generator_count": 1,
    "net_generation_mwh": 1444.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.165,
    "annual_capacity_factor": 0.1499,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hagerstown",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67801",
    "record_type": "power_plant",
    "eia_plant_code": 67801,
    "name": "FedEx Hagerstown",
    "operator": "SoCore Energy LLC",
    "street_address": "11825 Newgate Blvd.",
    "city": "Hagerstown",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21740",
    "latitude": 39.6385,
    "longitude": -77.7923,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.8,
    "generator_count": 1,
    "net_generation_mwh": 2665.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.304,
    "annual_capacity_factor": 0.169,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hagerstown",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64608",
    "record_type": "power_plant",
    "eia_plant_code": 64608,
    "name": "Hostetter Solar One, LLC",
    "operator": "Nautilus Solar Solutions",
    "street_address": "20524 Leitersburg Pike",
    "city": "Hagerstown",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21742",
    "latitude": 39.66448,
    "longitude": -77.70058,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3894.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.445,
    "annual_capacity_factor": 0.2223,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hagerstown",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-58408",
    "record_type": "power_plant",
    "eia_plant_code": 58408,
    "name": "Maryland Solar",
    "operator": "Arevon Energy, Inc.",
    "street_address": "18695 Roxbury Road",
    "city": "Hagerstown",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21746",
    "latitude": 39.563056,
    "longitude": -77.720278,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 27.0,
    "generator_count": 1,
    "net_generation_mwh": 31992.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2013,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 3.652,
    "annual_capacity_factor": 0.1353,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hagerstown",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63903",
    "record_type": "power_plant",
    "eia_plant_code": 63903,
    "name": "Pinesburg Solar LLC",
    "operator": "Madison Energy Holdings LLC",
    "street_address": "14868 Schetrompf Lane",
    "city": "Williamsport",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21795",
    "latitude": 39.625172,
    "longitude": -77.860901,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 4.3,
    "generator_count": 1,
    "net_generation_mwh": 7481.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.854,
    "annual_capacity_factor": 0.1986,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Williamsport",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-64646",
    "record_type": "power_plant",
    "eia_plant_code": 64646,
    "name": "Pittman Solar One LLC",
    "operator": "Nautilus Solar Solutions",
    "street_address": "7900 Millstone Rd",
    "city": "Hancock",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21750",
    "latitude": 39.68753,
    "longitude": -78.108,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3787.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "low",
    "coordinate_confidence_basis": "At least one EIA coordinate axis has fewer than four decimal places; retain wider aerial context until permits, parcels, address records, or visible infrastructure verify the site.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 3,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 2750,
    "aerial_frame_height_m": 2000,
    "planning_sustained_output_mw": 0.432,
    "annual_capacity_factor": 0.2162,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hancock",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-65756",
    "record_type": "power_plant",
    "eia_plant_code": 65756,
    "name": "Rockdale",
    "operator": "Altus Power America Management, LLC",
    "street_address": "14339 Clear Spring Road",
    "city": "Williamsport",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21795",
    "latitude": 39.628867,
    "longitude": -77.874899,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 1071.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.122,
    "annual_capacity_factor": 0.0611,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Williamsport",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-62912",
    "record_type": "power_plant",
    "eia_plant_code": 62912,
    "name": "Solar Hagerstown",
    "operator": "Greenbacker Renewable Energy Corporation",
    "street_address": "1260 Security Rd",
    "city": "Hagerstown",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21742",
    "latitude": 39.64913,
    "longitude": -77.67837,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 10.0,
    "generator_count": 1,
    "net_generation_mwh": 15938.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2020,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 1.819,
    "annual_capacity_factor": 0.1819,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hagerstown",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63525",
    "record_type": "power_plant",
    "eia_plant_code": 63525,
    "name": "Spruce - WCMD - Creek",
    "operator": "MN8 Energy LLC",
    "street_address": "Field NE of Kending Ln",
    "city": "Hagerstown",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21740",
    "latitude": 39.67185,
    "longitude": -77.82329,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2078.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.237,
    "annual_capacity_factor": 0.1186,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hagerstown",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63526",
    "record_type": "power_plant",
    "eia_plant_code": 63526,
    "name": "Spruce - WCMD - Resh I",
    "operator": "MN8 Energy LLC",
    "street_address": "Landfill Rd.",
    "city": "Hagerstown",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21740",
    "latitude": 39.68185,
    "longitude": -77.80145,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2799.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.32,
    "annual_capacity_factor": 0.1598,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Hagerstown",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63524",
    "record_type": "power_plant",
    "eia_plant_code": 63524,
    "name": "Spruce - WCMD - Rubble I",
    "operator": "MN8 Energy LLC",
    "street_address": "11112 Kemps Mill Rd",
    "city": "Williamsport",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21795",
    "latitude": 39.61849,
    "longitude": -77.82332,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2873.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.328,
    "annual_capacity_factor": 0.164,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Williamsport",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63523",
    "record_type": "power_plant",
    "eia_plant_code": 63523,
    "name": "Spruce - WCMD - Rubble II",
    "operator": "MN8 Energy LLC",
    "street_address": "11112 Kemps Mill Rd",
    "city": "Williamsport",
    "county": "Washington",
    "state": "MD",
    "postal_code": "21795",
    "latitude": 39.62143,
    "longitude": -77.82543,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 2744.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2015,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 5,
    "longitude_decimal_places": 5,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.313,
    "annual_capacity_factor": 0.1566,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24043",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Washington County",
      "Williamsport",
      "Census state 24",
      "Census county 24043",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-60735",
    "record_type": "power_plant",
    "eia_plant_code": 60735,
    "name": "Longview Solar",
    "operator": "MN8 Energy LLC",
    "street_address": "7340 Levin Dashiell Road",
    "city": "Hebron",
    "county": "Wicomico",
    "state": "MD",
    "postal_code": "21830",
    "latitude": 38.394728,
    "longitude": -75.672715,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 13.6,
    "generator_count": 1,
    "net_generation_mwh": 23339.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2016,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 2.664,
    "annual_capacity_factor": 0.1959,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24045",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Wicomico County",
      "Hebron",
      "Census state 24",
      "Census county 24045",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-67439",
    "record_type": "power_plant",
    "eia_plant_code": 67439,
    "name": "Parker Place",
    "operator": "Nautilus Solar Solutions",
    "street_address": "4637 Snow Hill Rd",
    "city": "Salisbury",
    "county": "Wicomico",
    "state": "MD",
    "postal_code": "21804",
    "latitude": 38.3228,
    "longitude": -75.5431,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3660.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2024,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.418,
    "annual_capacity_factor": 0.2089,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24045",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Wicomico County",
      "Salisbury",
      "Census state 24",
      "Census county 24045",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-57879",
    "record_type": "power_plant",
    "eia_plant_code": 57879,
    "name": "Perdue Salisbury Photovoltaic",
    "operator": "Terraform Arcadia",
    "street_address": "31149 Old Ocean City Road",
    "city": "Salisbury",
    "county": "Wicomico",
    "state": "MD",
    "postal_code": "21801",
    "latitude": 38.373611,
    "longitude": -75.535278,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 1.0,
    "generator_count": 1,
    "net_generation_mwh": 1446.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2011,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.165,
    "annual_capacity_factor": 0.1651,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24045",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Wicomico County",
      "Salisbury",
      "Census state 24",
      "Census county 24045",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-56680",
    "record_type": "power_plant",
    "eia_plant_code": 56680,
    "name": "Wicomico",
    "operator": "Industrial Power Generating Company LLC",
    "street_address": "6967 Brick Kiln Rd",
    "city": "Salisbury",
    "county": "Wicomico",
    "state": "MD",
    "postal_code": "21801",
    "latitude": 38.3847,
    "longitude": -75.6344,
    "primary_technology": "Landfill Gas",
    "technology_tags": [
      "Landfill Gas"
    ],
    "energy_source_codes": [
      "LFG"
    ],
    "nameplate_capacity_mw": 5.4,
    "generator_count": 18,
    "net_generation_mwh": 11675.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "LFG",
      "DFO"
    ],
    "year_built": 2007,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "Title V (Part 70) operating permit renewal reviewed by Maryland Department of the Environment Air and Radiation Administration for Ingenco Wholesale Power in 2023; final issuance and current permit status not confirmed in reviewed sources as of 2026-08-16",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final",
      "kimi-maryland-department-of-the-environment-a3fc392ce7"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "medium",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least four decimal places in both axes; suitable for tighter aerial context, but may identify the plant, campus, array, or reporting address.",
    "latitude_decimal_places": 4,
    "longitude_decimal_places": 4,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 1.333,
    "annual_capacity_factor": 0.2468,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24045",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Wicomico County",
      "Salisbury",
      "Census state 24",
      "Census county 24045",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63512",
    "record_type": "power_plant",
    "eia_plant_code": 63512,
    "name": "Wor-Wic Community College - Offsite",
    "operator": "Tesla Inc.",
    "street_address": "103 South Street",
    "city": "Hebron",
    "county": "Wicomico",
    "state": "MD",
    "postal_code": "21830",
    "latitude": 38.413274,
    "longitude": -75.690118,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3615.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.413,
    "annual_capacity_factor": 0.2063,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24045",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Wicomico County",
      "Hebron",
      "Census state 24",
      "Census county 24045",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-6565",
    "record_type": "power_plant",
    "eia_plant_code": 6565,
    "name": "Berlin",
    "operator": "Town of Berlin - (MD)",
    "street_address": "309 William Street",
    "city": "Berlin",
    "county": "Worcester",
    "state": "MD",
    "postal_code": "21811",
    "latitude": 38.327778,
    "longitude": -75.217222,
    "primary_technology": "Petroleum Liquids",
    "technology_tags": [
      "Petroleum Liquids",
      "Natural Gas Internal Combustion Engine"
    ],
    "energy_source_codes": [
      "DFO",
      "NG"
    ],
    "nameplate_capacity_mw": 5.6,
    "generator_count": 3,
    "net_generation_mwh": 157.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "DFO",
      "NG"
    ],
    "year_built": 1961,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "Synthetic minor source air permit 047-0044; amendment/renewal application submitted in 2020",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final",
      "kimi-maryland-department-of-the-environment-213883cd00"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.018,
    "annual_capacity_factor": 0.0032,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24047",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Worcester County",
      "Berlin",
      "Census state 24",
      "Census county 24047",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-61794",
    "record_type": "power_plant",
    "eia_plant_code": 61794,
    "name": "Gateway Solar",
    "operator": "Luminace Solar MC, LLC",
    "street_address": "8628 Old Ocean City Rd.",
    "city": "Berlin",
    "county": "Worcester",
    "state": "MD",
    "postal_code": "21811",
    "latitude": 38.376941,
    "longitude": -75.274195,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 7.6,
    "generator_count": 2,
    "net_generation_mwh": 9811.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 1.12,
    "annual_capacity_factor": 0.1474,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24047",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Worcester County",
      "Berlin",
      "Census state 24",
      "Census county 24047",
      "ISO PJM"
    ]
  },
  {
    "id": "eia-63089",
    "record_type": "power_plant",
    "eia_plant_code": 63089,
    "name": "Gibbons CSG",
    "operator": "Nautilus Solar Solutions",
    "street_address": "5844 Worcester Highway",
    "city": "Snow Hill",
    "county": "Worcester",
    "state": "MD",
    "postal_code": "21863",
    "latitude": 38.115402,
    "longitude": -75.214861,
    "primary_technology": "Solar Photovoltaic",
    "technology_tags": [
      "Solar Photovoltaic"
    ],
    "energy_source_codes": [
      "SUN"
    ],
    "nameplate_capacity_mw": 2.0,
    "generator_count": 1,
    "net_generation_mwh": 3569.0,
    "generation_year": 2024,
    "generation_fuel_codes": [
      "SUN"
    ],
    "year_built": 2019,
    "year_built_status": "documented",
    "year_built_basis": "Earliest operating year among the plant's operable generators in final 2024 Form EIA-860. This is not necessarily the construction year of every structure.",
    "development_status": "operating",
    "generator_status_codes": [
      "OP"
    ],
    "status_tags": [
      "Operating"
    ],
    "permit_status": "not researched at plant level",
    "air_permit_status": "not included in this inventory; Form EIA-860 does not report air-permit decisions",
    "legal_status": "not researched at plant level",
    "year_built_source_ids": [
      "eia-860-2024-final"
    ],
    "status_source_ids": [
      "eia-860-2024-final"
    ],
    "capacity_source_id": "eia-860-2024-final",
    "generation_source_id": "eia-923-2024-final",
    "coordinate_confidence": "high",
    "coordinate_confidence_basis": "Unique EIA coordinate with at least five decimal places in both axes; suitable for tighter aerial context, but decimal precision is not surveyed accuracy.",
    "latitude_decimal_places": 6,
    "longitude_decimal_places": 6,
    "shared_coordinate_count": 1,
    "aerial_frame_width_m": 700,
    "aerial_frame_height_m": 650,
    "planning_sustained_output_mw": 0.407,
    "annual_capacity_factor": 0.2037,
    "planning_output_basis": "Annual-average planning output calculated from 2024 net generation divided by 8,760 hours and bounded between zero and EIA nameplate capacity. This is a year-round planning proxy, not a peak, dispatchable, accredited, or reliability-capacity rating.",
    "planning_output_source_id": "eia-923-2024-final",
    "census_state_fips": "24",
    "census_county_fips": "24047",
    "census_place_fips": null,
    "iso_region": "PJM",
    "iso_zone": null,
    "location_tags": [
      "Maryland",
      "Worcester County",
      "Snow Hill",
      "Census state 24",
      "Census county 24047",
      "ISO PJM"
    ]
  }
]
